{"id":72195,"date":"2018-03-07T10:29:09","date_gmt":"2018-03-07T07:29:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72195"},"modified":"2018-03-07T10:31:31","modified_gmt":"2018-03-07T07:31:31","slug":"akkuyu-ngsnin-nisan-basinda-ilk-betonu-dokulecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-nisan-basinda-ilk-betonu-dokulecek\/","title":{"rendered":"(Turkish) \u201cAkkuyu NGS&#8217;nin Nisan Ba\u015f\u0131nda \u0130lk Betonu D\u00f6k\u00fclecek\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72195\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Rusya Devlet N\u00fckleer Enerji Kurumu (Rosatom) Ba\u015fkan\u0131 Aleksey Liha\u00e7ev taraf\u0131ndan T\u00fcrkiye\u2019de in\u015fa edilecek Akkuyu N\u00fckleer G\u00fc\u00e7 Santraline y\u00f6nelik Nisan ay\u0131 ba\u015f\u0131nda ilk betonun d\u00f6k\u00fclmesinin planland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<img loading=\"lazy\" class=\"alignright wp-image-37577 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-300x199.jpg\" alt=\"akkuyu-ngsnin-nisan-basinda-ilk-betonu-dokulecek\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/03\/akkuyu-ngsdeki-ertelemeye-ragmen-reklam-gosterimi-surecek.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><span id=\"more-98457\"><\/span>Akkuyu\u2019da in\u015faata ba\u015flamak i\u00e7in 101 lisans al\u0131nmas\u0131 gerekti\u011fini, bunlardan hen\u00fcz 90\u2019\u0131n\u0131 ald\u0131klar\u0131n\u0131 hat\u0131rlatan Lih\u00e7ev \u201cNisan ba\u015f\u0131nda Akkuyu\u2019da ilk betonu d\u00f6kmeyi planl\u0131yoruz.\u201d dedi. \u0130lk betonu d\u00f6k\u00fc\u015f t\u00f6reni in\u015faat\u0131n ba\u015flamas\u0131 anlam\u0131na da ta\u015f\u0131maktad\u0131r.<\/p>\n<p>Rusya H\u00fck\u00fcmetiyle T\u00fcrkiye H\u00fck\u00fcmeti aras\u0131nda Mersin\u2019de Akkuyu Sahas\u0131\u2019nda n\u00fckleer g\u00fc\u00e7 santrali tesisine ve i\u015fletimine dair i\u015fbirli\u011fi anla\u015fmas\u0131 12.05.2010 tarihinde yap\u0131lm\u0131\u015ft\u0131.<\/p>\n<p>Akkuyu NGS Projesi, 4 \u00fcniteden meydana gelmektedir. Her bir \u00fcnitenin g\u00fcc\u00fc 1200 MWe olacakt\u0131r. Akkuyu NGS Projesi\u2019nin teknik referans santrali, Rusya\u2019da in\u015faat\u0131 s\u00fcren AES-2006 projeli Novovoronejskaya-2 N\u00fckleer Santrali\u2019dir. Akkuyu N\u00fckleer Santrali\u2019nin i\u015fletme \u00f6mr\u00fcn\u00fcn 60 y\u0131l olmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rusya Devlet N\u00fckleer Enerji Kurumu (Rosatom) Ba\u015fkan\u0131 Aleksey Liha\u00e7ev taraf\u0131ndan T\u00fcrkiye\u2019de in\u015fa edilecek Akkuyu N\u00fckleer G\u00fc\u00e7 Santraline y\u00f6nelik Nisan ay\u0131 ba\u015f\u0131nda ilk betonun [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37577,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,67,1009,21,23134,25480,88,34930,2587,885],"views":848,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72195"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72195"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72195\/revisions"}],"predecessor-version":[{"id":72198,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72195\/revisions\/72198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/37577"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}