{"id":72043,"date":"2018-03-02T11:27:08","date_gmt":"2018-03-02T08:27:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72043"},"modified":"2018-03-02T11:27:08","modified_gmt":"2018-03-02T08:27:08","slug":"muglada-cop-gazindan-elektrik-uretimi-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/muglada-cop-gazindan-elektrik-uretimi-yapilacak\/","title":{"rendered":"(Turkish) Mu\u011fla\u2019da \u00c7\u00f6p Gaz\u0131ndan Elektrik \u00dcretimi Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72043\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan yap\u0131m a\u015famas\u0131nda ve planlanan kat\u0131 at\u0131k d\u00fczenli depolama tesisleri entegre kat\u0131 at\u0131k y\u00f6netim sistemi ile \u00e7\u00f6p gaz\u0131ndan elektrik \u00fcretimi yap\u0131lacak.<\/strong><\/p>\n<p>Sistemle i\u015fletilerek enerji elde edilmesi, kar\u0131\u015f\u0131k \u00e7\u00f6pteki ambalaj at\u0131klar\u0131n\u0131n ayr\u0131\u015ft\u0131r\u0131larak ekonomiye<img loading=\"lazy\" class=\"alignright size-medium wp-image-72044\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/muglada-cop-gazindan-elektrik-uretimi-yapilacak-300x164.jpg\" alt=\"\" width=\"300\" height=\"164\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/muglada-cop-gazindan-elektrik-uretimi-yapilacak-300x164.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/muglada-cop-gazindan-elektrik-uretimi-yapilacak-500x273.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/muglada-cop-gazindan-elektrik-uretimi-yapilacak-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/muglada-cop-gazindan-elektrik-uretimi-yapilacak.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> kazand\u0131r\u0131lmas\u0131, depolanan \u00e7\u00f6p miktar\u0131n\u0131n azalmas\u0131 planlan\u0131yor. T\u00fcm tesislerde toplam yakla\u015f\u0131k 15 megawat elektrik \u00fcretimi yap\u0131lmas\u0131 \u00f6ng\u00f6ren \u00e7al\u0131\u015fmayla kat\u0131 at\u0131k d\u00fczenli depolama tesislerinin \u00e7evreye duyarl\u0131 olarak i\u015fletilmesi yan\u0131nda, depolama hacmi art\u0131r\u0131larak \u00e7ok daha uzun y\u0131llar kullan\u0131m\u0131n\u0131 sa\u011flamak ama\u00e7lan\u0131yor.<\/p>\n<p>Yap\u0131m\u0131 s\u00fcren Milas kat\u0131 at\u0131k d\u00fczenli depolama tesisine Biyobozunur at\u0131k azalt\u0131m\u0131na y\u00f6nelik Anaerobik Fermantasyon tesisi kurularak metan gaz\u0131ndan daha \u00e7ok verimle enerji elde edilmesini sa\u011flamay\u0131 ama\u00e7layan B\u00fcy\u00fck\u015fehir depolanan at\u0131kta da hacim azalmas\u0131 olu\u015farak tesisin kullan\u0131m s\u00fcresinin artmas\u0131n\u0131 ve g\u00fcbre de elde edilmesini sa\u011flayacak. Biyobozunur mutfak at\u0131klar\u0131 kompost tesisinde g\u00fcbre haline getirilerek hem alandan kazan\u00e7 hem de ekonomiye katk\u0131 sa\u011flanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan yap\u0131m a\u015famas\u0131nda ve planlanan kat\u0131 at\u0131k d\u00fczenli depolama tesisleri entegre kat\u0131 at\u0131k y\u00f6netim sistemi ile \u00e7\u00f6p gaz\u0131ndan elektrik \u00fcretimi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72044,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[35866,68,67,1009,18,36959,3089],"views":1436,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72043"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72043"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72043\/revisions"}],"predecessor-version":[{"id":72045,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72043\/revisions\/72045"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72044"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}