{"id":71844,"date":"2018-02-23T12:56:42","date_gmt":"2018-02-23T09:56:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71844"},"modified":"2018-02-23T12:57:51","modified_gmt":"2018-02-23T09:57:51","slug":"akkuyu-ngsnin-temeli-nisan-ayinda-atiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-temeli-nisan-ayinda-atiliyor\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019nin Temeli Nisan Ay\u0131nda At\u0131l\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71844\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Cumhurba\u015fkan\u0131 Recep Tayyip Erdo\u011fan ve Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin\u2019in, nisan ay\u0131n\u0131n ilk haftas\u0131nda T\u00fcrkiye\u2019de bir araya gelmesi planlan\u0131yor. \u0130ki lider, T\u00fcrk-Rus \u00dcst D\u00fczey \u0130\u015fbirli\u011fi Konseyi\u2019nin (\u00dcD\u0130K), 7\u2019nci toplant\u0131s\u0131na ba\u015fkanl\u0131k edecek. Toplant\u0131da siyasi ve ekonomik konularda \u00f6nemli kararlar\u0131n al\u0131nmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.\u00a0Daha sonra iki lider, Akkuyu N\u00fckleer Santral\u0131\u2019n\u0131n temelini atacak.<img loading=\"lazy\" class=\"alignright size-medium wp-image-71845\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/akkuyu-ngsnin-temeli-nisan-ayinda-atiliyor-300x141.jpg\" alt=\"\" width=\"300\" height=\"141\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/akkuyu-ngsnin-temeli-nisan-ayinda-atiliyor-300x141.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/akkuyu-ngsnin-temeli-nisan-ayinda-atiliyor-500x235.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/akkuyu-ngsnin-temeli-nisan-ayinda-atiliyor-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/akkuyu-ngsnin-temeli-nisan-ayinda-atiliyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Erdo\u011fan ve Putin, temel atma t\u00f6reninin den sonra Suriye\u2019deki i\u00e7 sava\u015f\u0131 sonland\u0131rmaya y\u00f6nelik ger\u00e7ekle\u015ftirilecek \u0130stanbul\u2019daki zirvede bir araya olacak. Astana s\u00fcrecinin devam\u0131 niteli\u011fini ta\u015f\u0131yan zirvenin ilki 22 Kas\u0131m 2017 tarihinde So\u00e7i\u2019de ger\u00e7ekle\u015ftirilmi\u015fti. \u0130stanbul\u2019daki zirvede Astana s\u00fcrecinin garant\u00f6rlerinden \u0130ran Cumhurba\u015fkan\u0131 Ruhani de yer alacak.<\/p>\n<p>4 reakt\u00f6rden meydana gelecek Akkuyu N\u00fckleer Santral\u0131\u2019n\u0131n ilk \u00fcnitesi, 2023\u2019te, di\u011fer \u00fcnitelerin ise birer y\u0131l arayla devreye al\u0131nmas\u0131 \u00f6ng\u00f6r\u00fclmektedir. Buna g\u00f6re santral 2026 y\u0131l\u0131nda tam kapasite \u00fcretime ge\u00e7mi\u015f olacak. Her biri bin 200 MW kapasiteli 4 reakt\u00f6rden olu\u015fan santral, 4 bin 800 MW kapasiteye ula\u015ft\u0131\u011f\u0131nda y\u0131ll\u0131k ortalama 35 milyar kilovatsaat elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Cumhurba\u015fkan\u0131 Recep Tayyip Erdo\u011fan ve Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin\u2019in, nisan ay\u0131n\u0131n ilk haftas\u0131nda T\u00fcrkiye\u2019de bir araya gelmesi planlan\u0131yor. \u0130ki lider, T\u00fcrk-Rus \u00dcst [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71845,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,67,1009,23311,10855,21,23134,34930,6619,36900,36899],"views":782,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71844"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71844"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71844\/revisions"}],"predecessor-version":[{"id":71847,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71844\/revisions\/71847"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71845"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}