{"id":71815,"date":"2018-02-21T20:53:47","date_gmt":"2018-02-21T17:53:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71815"},"modified":"2018-02-21T20:53:47","modified_gmt":"2018-02-21T17:53:47","slug":"ilisu-barajinin-tamamlanmasinda-sona-gelindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ilisu-barajinin-tamamlanmasinda-sona-gelindi\/","title":{"rendered":"(Turkish) Il\u0131su Baraj\u0131\u2019n\u0131n Tamamlanmas\u0131nda Sona Gelindi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71815\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Dolgu hacmi a\u00e7\u0131s\u0131ndan T\u00fcrkiye\u2019nin ikinci, kurulu g\u00fc\u00e7 a\u00e7\u0131s\u0131ndan ise d\u00f6rd\u00fcnc\u00fc b\u00fcy\u00fck baraj\u0131 konumundaki Il\u0131su Baraj\u0131\u2019n\u0131n tamamlanmas\u0131nda sona yakla\u015f\u0131ld\u0131. Mardin ve \u015e\u0131rnak il s\u0131n\u0131rlar\u0131 aras\u0131nda yer alan, Dicle Nehri \u00fczerinde bulunan ve en b\u00fcy\u00fck baraj olma \u00f6zelli\u011fine sahip barajdaki fiziki yeterlilik y\u00fczde doksan yedi oran\u0131nda sa\u011fland\u0131.<\/strong><\/p>\n<p>Y<img loading=\"lazy\" class=\"alignleft size-medium wp-image-71816\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/ilisu-barajinin-tamamlanmasinda-sona-gelindi-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/ilisu-barajinin-tamamlanmasinda-sona-gelindi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/ilisu-barajinin-tamamlanmasinda-sona-gelindi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/ilisu-barajinin-tamamlanmasinda-sona-gelindi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/ilisu-barajinin-tamamlanmasinda-sona-gelindi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u0131lda ortalama 4,12 milyar kilovatsaat enerji \u00fcretimi kapasitesine sahip olacak baraj\u0131n alt\u0131 \u00fcnitesinde be\u015f rotor yerle\u015ftirimi tamamland\u0131. Nisan ay\u0131 i\u00e7erisinde son rotorun yerle\u015ftirilmesi ile enerji \u00fcretimine haz\u0131r hale gelmi\u015f olaca\u011f\u0131 ve \u00fc\u00e7 kapa\u011f\u0131n\u0131n montaj\u0131n\u0131n tamamlanarak su tutulmaya ba\u015flanaca\u011f\u0131 belirtildi.<\/p>\n<p>Diyarbak\u0131r ba\u015fta olmak \u00fczere Batman, Mardin, Siirt, \u015e\u0131rnak illeri ile G\u00fcneydo\u011fu Anadolu B\u00f6lgesi\u2019nin tamam\u0131n\u0131n kalk\u0131nmas\u0131na yard\u0131mc\u0131 olacak baraj, 10,4 milyar metrek\u00fcp su depolama hacmine sahip. Il\u0131su Baraj\u0131\u2019n\u0131n ayn\u0131 zamanda Cizre Baraj\u0131 yap\u0131m\u0131nda da katk\u0131 sa\u011flayaca\u011f\u0131 biliniyor. Proje tamamland\u0131\u011f\u0131nda 500 binden fazla dekar arazi sulamaya kavu\u015facak, her iki baraj tamamland\u0131\u011f\u0131nda ise 1 milyon 200 bin dekar arazinin sulamas\u0131 ger\u00e7ekle\u015febilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Dolgu hacmi a\u00e7\u0131s\u0131ndan T\u00fcrkiye\u2019nin ikinci, kurulu g\u00fc\u00e7 a\u00e7\u0131s\u0131ndan ise d\u00f6rd\u00fcnc\u00fc b\u00fcy\u00fck baraj\u0131 konumundaki Il\u0131su Baraj\u0131\u2019n\u0131n tamamlanmas\u0131nda sona yakla\u015f\u0131ld\u0131. Mardin ve \u015e\u0131rnak il s\u0131n\u0131rlar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71816,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[61,19,67,1009,83,26043,1090,26044,4278],"views":914,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71815"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71815"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71815\/revisions"}],"predecessor-version":[{"id":71817,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71815\/revisions\/71817"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71816"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}