{"id":71774,"date":"2018-02-20T13:47:58","date_gmt":"2018-02-20T10:47:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71774"},"modified":"2018-02-20T13:47:58","modified_gmt":"2018-02-20T10:47:58","slug":"schneider-electric-ecostruxure-adms3-8i-tanitti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/schneider-electric-ecostruxure-adms3-8i-tanitti\/","title":{"rendered":"(Turkish) Schneider Electric, EcoStruxure ADMS3.8\u2019i Tan\u0131tt\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71774\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji y\u00f6netimi ve otomasyonda d\u00fcnya \u00e7ap\u0131nda uzman olan Schneider Electric, DistribuTECH 2018\u2019de elektrik \u015febekesi optimizasyonuna y\u00f6nelik EcoStruxure ADMS3.8\u2019e dair son geli\u015fmeleri a\u00e7\u0131klad\u0131. Buna g\u00f6re; elektrik da\u011f\u0131t\u0131m \u015firketleri, otomatik EcoStruxureArcFM co\u011frafi bilgi sistemi (GIS) entegrasyonlu i\u015f ak\u0131\u015f\u0131 ile geli\u015fmi\u015f varl\u0131k y\u00f6netiminin yan\u0131 s\u0131ra da\u011f\u0131t\u0131k enerji kaynaklar\u0131n\u0131n (DER) optimizasyonu yoluyla g\u00fcvenilir bir \u015febeke esnekli\u011fi de elde edebilecekler.<\/strong><\/p>\n<p>Schneider Electric EcoStruxure ADMS, elektrik da\u011f\u0131t\u0131m \u015firketlerine DER entegrasyonunda destek sa\u011fl\u0131yor. B\u00f6ylece DER kullan\u0131m\u0131n\u0131 art\u0131r\u0131rken IT\/OT \u00e7\u00f6z\u00fcmlerinin da\u011f\u0131t\u0131m, bak\u0131m ve y\u00fckseltme maliyetlerini d\u00fc\u015f\u00fcr\u00fcyor.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright size-medium wp-image-71775\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/schneider-electric-ecostruxure-adms3-8i-tanitti-300x218.jpg\" alt=\"\" width=\"300\" height=\"218\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/schneider-electric-ecostruxure-adms3-8i-tanitti-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/schneider-electric-ecostruxure-adms3-8i-tanitti-768x559.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/schneider-electric-ecostruxure-adms3-8i-tanitti-1024x745.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/schneider-electric-ecostruxure-adms3-8i-tanitti-500x364.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/schneider-electric-ecostruxure-adms3-8i-tanitti-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/schneider-electric-ecostruxure-adms3-8i-tanitti.jpg 1100w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>3 ad\u0131mda gelen \u00e7\u00f6z\u00fcm<\/strong><\/p>\n<p>Schneider Electric sa\u011flad\u0131\u011f\u0131 bu \u00e7\u00f6z\u00fcm\u00fc 3 ad\u0131mda sunuyor;<\/p>\n<p>\u06f0Schneider Electric&#8217;in da\u011f\u0131t\u0131k enerji kaynaklar\u0131 y\u00f6netim sistemi (DERMS), dahili bir ADMS mod\u00fcl\u00fc veya ba\u011f\u0131ms\u0131z olarak uygulanabilir \u00e7\u00f6z\u00fcmler sa\u011fl\u0131yor.<\/p>\n<p>\u06f0Yeni GIS-ADMS entegrasyonu, veri do\u011frulama ve hata raporlama \u00f6zellikleriyle ortak i\u015f s\u00fcrecini otomatik bir veri y\u00f6netimi i\u015f ak\u0131\u015f\u0131na d\u00f6n\u00fc\u015ft\u00fcren iki y\u00f6nl\u00fc mesajla\u015fma sunuyor.<\/p>\n<p>\u06f0ADMSDERMS&#8217;i destekleyen Easergy T300 gibi \u015febeke otomasyon cihazlar\u0131, g\u00fc\u00e7 ak\u0131\u015flar\u0131n\u0131 optimum hale getirerek ve g\u00fc\u00e7 kalitesini izleyerek g\u00fcvenilir bir g\u00fc\u00e7 ak\u0131\u015f\u0131 yarat\u0131yor.<\/p>\n<p>Schneider Electric Enerji Dijital \u00c7\u00f6z\u00fcmleri K\u0131demli Ba\u015fkan Yard\u0131mc\u0131s\u0131 J\u00e9rome de Parscau EcoStruxure ADMS3.8 ile ilgili \u015funlar\u0131 ifade etti; &#8220;Enerji tedarik\u00e7ileri sekt\u00f6rde h\u0131zl\u0131 de\u011fi\u015fimlerle kar\u015f\u0131 kar\u015f\u0131ya. Bu da onlar\u0131 \u015febeke y\u00f6netiminde verimlilik art\u0131\u015f\u0131na ve m\u00fc\u015fteri tercihlerini desteklemeye y\u00f6nelik \u00e7al\u0131\u015fmalar yapmaya y\u00f6neltiyor. EcoStruxure ADMS3.8 de tam olarak bu ihtiya\u00e7tan dolay\u0131 geli\u015ftirildi. EcoStruxure ADMS3.8 kullanan \u015firketler s\u00fcrd\u00fcr\u00fclebilir enerji kullan\u0131m\u0131n\u0131 desteklerken \u015febeke modernizasyon \u00e7\u00f6z\u00fcmlerinin toplam sahip olma maliyetini d\u00fc\u015f\u00fcr\u00fcyor ve elektrik enerjisi g\u00fcvenilirli\u011fini art\u0131r\u0131yor.\u201d<\/p>\n<p>Schneider Electric\u2019in EcoStruxure ADMS \u00e7\u00f6z\u00fcmleri hakk\u0131nda daha fazla bilgiye <a href=\"http:\/\/www.schneider-electric.us\">www.schneider-electric.us<\/a> adresinden ula\u015fmak m\u00fcmk\u00fcn.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji y\u00f6netimi ve otomasyonda d\u00fcnya \u00e7ap\u0131nda uzman olan Schneider Electric, DistribuTECH 2018\u2019de elektrik \u015febekesi optimizasyonuna y\u00f6nelik EcoStruxure ADMS3.8\u2019e dair son geli\u015fmeleri a\u00e7\u0131klad\u0131. Buna [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71775,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[36880,67,1009,36879,36881,4157],"views":663,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71774"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71774"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71774\/revisions"}],"predecessor-version":[{"id":71776,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71774\/revisions\/71776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71775"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}