{"id":71721,"date":"2018-02-18T20:47:24","date_gmt":"2018-02-18T17:47:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71721"},"modified":"2018-02-18T20:47:24","modified_gmt":"2018-02-18T17:47:24","slug":"manisa-alasehirde-13-47-mw-gucunde-jes-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/manisa-alasehirde-13-47-mw-gucunde-jes-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Manisa Ala\u015fehir\u2019de 13.47 MW G\u00fcc\u00fcnde JES Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71721\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Manisa Ala\u015fehir&#8217;e ba\u011fl\u0131 Akke\u00e7ili Mahallesi Ta\u015ftepe mevkiindeki 1052,37 hektarl\u0131k ruhsatl\u0131 <img loading=\"lazy\" class=\"alignleft size-medium wp-image-71723\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/manisa-alasehirde-13-47-mw-gucunde-jes-kurulumu-yapilacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/manisa-alasehirde-13-47-mw-gucunde-jes-kurulumu-yapilacak.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/manisa-alasehirde-13-47-mw-gucunde-jes-kurulumu-yapilacak-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>alanda GCL ND Enerji A\u015e\u00a0taraf\u0131ndan bir santral kurulup i\u015fletilecek.<\/strong><\/p>\n<p><strong>YILDA 107.5 M\u0130LYON KWH \u00dcRET\u0130M\u0130 YAPILACAK<\/strong><\/p>\n<p>13.47 MW kurulu g\u00fcc\u00fc sahip GCL ND M1 JES projesinin\u00a0yat\u0131r\u0131m maliyeti ise 190 milyon TL olacakt\u0131r.\u00a0Kurulacak santralde,\u00a0y\u0131ll\u0131k yakla\u015f\u0131k 107.5 milyon kWh elektrik \u00fcretilmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>GCL ND M1 JES projesine y\u00f6nelik \u00fcretim ve reenjeksiyon ama\u00e7l\u0131 jeotermal kuyular\u0131 a\u00e7\u0131lacak olunup bu kapsamda derinlikleri yakla\u015f\u0131k 2400-3800 metre aras\u0131nda baz\u0131 kuyular a\u00e7\u0131lm\u0131\u015f durumdad\u0131r. Toplamda 7 adet olacak kuyular\u0131n a\u00e7\u0131lmas\u0131na y\u00f6nelik i\u015flemler ise s\u00fcrmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Manisa Ala\u015fehir&#8217;e ba\u011fl\u0131 Akke\u00e7ili Mahallesi Ta\u015ftepe mevkiindeki 1052,37 hektarl\u0131k ruhsatl\u0131 alanda GCL ND Enerji A\u015e\u00a0taraf\u0131ndan bir santral kurulup i\u015fletilecek. YILDA 107.5 M\u0130LYON KWH [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71723,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[25670,68,67,1009,36861,36862,16077,6748,6322,2191],"views":1425,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71721"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71721"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71721\/revisions"}],"predecessor-version":[{"id":71724,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71721\/revisions\/71724"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71723"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}