{"id":71712,"date":"2018-02-18T18:47:06","date_gmt":"2018-02-18T15:47:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71712"},"modified":"2018-02-18T18:47:06","modified_gmt":"2018-02-18T15:47:06","slug":"oibdan-manyas-hes-ozellestirmesine-onay","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/oibdan-manyas-hes-ozellestirmesine-onay\/","title":{"rendered":"(Turkish) \u00d6\u0130B&#8217;dan Manyas HES \u00d6zelle\u015ftirmesine Onay"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71712\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Manyas HES nihai pazarl\u0131k g\u00f6r\u00fc\u015fmesinde 64,3 milyon TL ile en y\u00fcksek teklifi veren Samsun Makina Sanayi A.\u015e.-Aria Teknoloji Yat\u0131r\u0131mlar A.\u015e. Ortak Giri\u015fim Grubu&#8217;na<img loading=\"lazy\" class=\"alignright size-medium wp-image-71713\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/oibdan-manyas-hes-ozellestirmesine-onay-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/oibdan-manyas-hes-ozellestirmesine-onay.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/oibdan-manyas-hes-ozellestirmesine-onay-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> verildi.\u00a0\u00d6\u0130B&#8217;nin konu ile ilgili karar\u0131 Resmi Gazete&#8217;de yay\u0131mland\u0131.<\/strong><\/p>\n<p>Samsun Makina\u2019n\u0131n s\u00f6zle\u015fmeyi imzalamaktan imtina etmesi durumunda ise santralin i\u015fletme hakk\u0131 64,2 milyon TL ile ikinci en y\u00fcksek teklifi veren Akay \u0130n\u015faat A.\u015e.\u2019ye verilecek. Akay \u0130n\u015faat\u2019\u0131n da s\u00f6zle\u015fmeyi imzalamaktan imtina etmesi veya di\u011fer y\u00fck\u00fcml\u00fcl\u00fcklerini yerine getirmemesi durumunda teminat \u0130dare lehine irat kaydedilerek ihale iptali yap\u0131lacak.<\/p>\n<p>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 taraf\u0131ndan Elektrik \u00dcretim A\u015e`ye Ait Manyas Hidroelektrik Santrali ve bu santralince kullan\u0131lan ta\u015f\u0131nmazlar\u0131n \u00f6zelle\u015ftirme ihalesi nihai pazarl\u0131k g\u00f6r\u00fc\u015fmesini 21 Kas\u0131m 2017 tarihinde yap\u0131lm\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Manyas HES nihai pazarl\u0131k g\u00f6r\u00fc\u015fmesinde 64,3 milyon TL ile en y\u00fcksek teklifi veren Samsun Makina Sanayi A.\u015e.-Aria Teknoloji Yat\u0131r\u0131mlar A.\u015e. Ortak Giri\u015fim Grubu&#8217;na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71713,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[1033,34292,1954,5234,1248,36856],"views":1044,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71712"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71712"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71712\/revisions"}],"predecessor-version":[{"id":71714,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71712\/revisions\/71714"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71713"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}