{"id":71641,"date":"2018-02-15T11:35:52","date_gmt":"2018-02-15T08:35:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71641"},"modified":"2018-02-15T11:35:52","modified_gmt":"2018-02-15T08:35:52","slug":"bpden-misir-karasularinda-dogalgaz-uretimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bpden-misir-karasularinda-dogalgaz-uretimi\/","title":{"rendered":"(Turkish) BP&#8217;den M\u0131s\u0131r Karasular\u0131nda Do\u011falgaz \u00dcretimi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71641\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><img loading=\"lazy\" class=\"alignleft size-medium wp-image-6363\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/dogalgaz-petrol-aramasi-300x223.jpg\" alt=\"\" width=\"300\" height=\"223\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/dogalgaz-petrol-aramasi-300x223.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/dogalgaz-petrol-aramasi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/dogalgaz-petrol-aramasi.jpg 333w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u0130ngiliz petrol \u015firketi BP taraf\u0131ndan M\u0131s\u0131r\u2019\u0131n karasular\u0131nda bulunan Atoll Phase One Projesi\u2019nden do\u011falgaz \u00fcretimine ba\u015fland\u0131.<\/strong><span id=\"more-97954\"><\/span><\/p>\n<p>\u0130ngiltere merkezli petrol firmas\u0131 olan BP, M\u0131s\u0131r Nil Delta\u2019s\u0131nda bulunan Kuzey Damietta varl\u0131klar\u0131nda Atoll Phase One projesinden do\u011falgaz \u00fcretimine ba\u015flad\u0131\u011f\u0131n\u0131n a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamaya g\u00f6re g\u00fcnde 350 milyon feetk\u00fcp do\u011falgaz \u00fcretiliyor ve gaz do\u011frudan ulusal \u015febekeye iletiliyor. Ayr\u0131ca g\u00fcnde 10 bin varil kondensat\u0131nda \u00fcretimi ger\u00e7ekle\u015fiyor. Projenin planlanan takvimden yedi ay \u00f6nde ilerledi\u011fi ve ilk fiyat tahmininin y\u00fczde 33 alt\u0131nda oldu\u011fu da belirtilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130ngiliz petrol \u015firketi BP taraf\u0131ndan M\u0131s\u0131r\u2019\u0131n karasular\u0131nda bulunan Atoll Phase One Projesi\u2019nden do\u011falgaz \u00fcretimine ba\u015fland\u0131. \u0130ngiltere merkezli petrol firmas\u0131 olan BP, M\u0131s\u0131r Nil [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6363,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[36837,853,1128,19761,23219,4713,67,1009,3352,36838],"views":773,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71641"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71641"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71641\/revisions"}],"predecessor-version":[{"id":71642,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71641\/revisions\/71642"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/6363"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}