{"id":71567,"date":"2018-02-13T12:12:21","date_gmt":"2018-02-13T09:12:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71567"},"modified":"2018-02-13T12:12:21","modified_gmt":"2018-02-13T09:12:21","slug":"bereket-enerjiden-dagitim-ve-yenilenebilirde-halka-arz-plani","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bereket-enerjiden-dagitim-ve-yenilenebilirde-halka-arz-plani\/","title":{"rendered":"(Turkish) Bereket Enerji&#8217;den Da\u011f\u0131t\u0131m ve Yenilenebilirde Halka Arz Plan\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71567\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bereket Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ceyhan Saldanl\u0131 taraf\u0131ndan GDZ Elektrik Da\u011f\u0131t\u0131m, ADM Elektrik Da\u011f\u0131t\u0131m ve baz\u0131 yenilenebilir enerji santrallerinde halka arz ger\u00e7ekle\u015ftirmek i\u00e7in \u00e7al\u0131\u015fmalar y\u00fcr\u00fct\u00fcld\u00fc\u011f\u00fc a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p><span id=\"more-97866\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-28494\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--300x122.jpg\" alt=\"\" width=\"300\" height=\"122\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--300x122.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--500x204.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--80x32.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji-.jpg 781w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/span>Saldanl\u0131, \u201cEnerjisa Elektrik\u2019in ba\u015far\u0131l\u0131 halka arz\u0131ndan sonra, elektrik da\u011f\u0131t\u0131m \u015firketlerimiz ile baz\u0131 yenilenebilir enerji \u00fcretim varl\u0131klar\u0131m\u0131zda halka arz ger\u00e7ekle\u015ftirmek i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131k\u201d dedi.<\/p>\n<p>Bereket Enerji 2017\u2019de aralar\u0131nda Yap\u0131 Kredi, Vak\u0131fbank, \u0130\u015f Bankas\u0131\u2019n\u0131n da oldu\u011fu 6 T\u00fcrk bankas\u0131ndan 10 y\u0131la kadar vadeli 700 milyon dolar kredi sa\u011flad\u0131; bu kredinin 200 milyon dolar\u0131 2 enerji da\u011f\u0131t\u0131m b\u00f6lgesinin bu y\u0131lki yat\u0131r\u0131m ihtiyac\u0131 i\u00e7in, 300 milyon dolar\u0131 k\u00f6m\u00fcr santrali i\u00e7in \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131\u2019na yap\u0131lacak \u00f6deme i\u00e7in ve kalan\u0131 da elektrik santrali projeleri i\u00e7in kullan\u0131lacak.<\/p>\n<p>Grubun 10 y\u0131la kadar vadeli $3 milyarl\u0131k kredi borcunun y\u0131ll\u0131k geri \u00f6demeleri yakla\u015f\u0131k 250 milyon dolar seviyesinde. Saldanl\u0131, bu rakam\u0131n \u00f6deme kapasitelerinin alt\u0131nda oldu\u011funu da dile getirdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bereket Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ceyhan Saldanl\u0131 taraf\u0131ndan GDZ Elektrik Da\u011f\u0131t\u0131m, ADM Elektrik Da\u011f\u0131t\u0131m ve baz\u0131 yenilenebilir enerji santrallerinde halka arz ger\u00e7ekle\u015ftirmek i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":28494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[4720,36818,34979,63,67,1009,422,36819,19389,26829],"views":990,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71567"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71567"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71567\/revisions"}],"predecessor-version":[{"id":71568,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71567\/revisions\/71568"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/28494"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}