{"id":71565,"date":"2018-02-13T12:07:52","date_gmt":"2018-02-13T09:07:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71565"},"modified":"2018-02-13T12:07:52","modified_gmt":"2018-02-13T09:07:52","slug":"asunim-turkiyeden-ikinci-lisansli-ges-projesi-geliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asunim-turkiyeden-ikinci-lisansli-ges-projesi-geliyor\/","title":{"rendered":"(Turkish) Asunim T\u00fcrkiye&#8217;den \u0130kinci Lisansl\u0131 GES Projesi Geliyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71565\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Asunim taraf\u0131ndan T\u00fcrkiye\u2019deki \u00fc\u00e7\u00fcnc\u00fc lisansl\u0131 GES projesi Hamal GES i\u00e7in daha \u00f6nce projelendirme ve m\u00fchendislik hizmetlerine y\u00f6nelik Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019ndan \u00f6n proje onay\u0131 al\u0131nm\u0131\u015ft\u0131.<img loading=\"lazy\" class=\"alignright wp-image-39733 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/bhe-enerji-sanliurfaya-10-mwlik-gunes-enerjisi-santrali-ges-kurulumu-300x200.jpg\" alt=\"asunim-turkiyeden-ikinci-lisansli-ges-projesi-geliyor\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/bhe-enerji-sanliurfaya-10-mwlik-gunes-enerjisi-santrali-ges-kurulumu-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/bhe-enerji-sanliurfaya-10-mwlik-gunes-enerjisi-santrali-ges-kurulumu-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/bhe-enerji-sanliurfaya-10-mwlik-gunes-enerjisi-santrali-ges-kurulumu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/bhe-enerji-sanliurfaya-10-mwlik-gunes-enerjisi-santrali-ges-kurulumu.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>YBT Enerji gibi de\u011ferli bir yat\u0131r\u0131mc\u0131ya ait, ikinci bir lisansl\u0131 proje i\u00e7inde var olmaktan gurur duyduklar\u0131n\u0131 dile getiren Asunim T\u00fcrkiye Genel M\u00fcd\u00fcr\u00fc Umut G\u00fcrb\u00fcz; \u2018T\u00fcrkiye\u2019nin ilk lisansl\u0131 projesi Solentegre GES\u2019in yan\u0131 s\u0131ra T\u00fcrkiye\u2019de 140MW\u2019lara varan tecr\u00fcbelerimizden faydalanarak ayn\u0131 ba\u015far\u0131y\u0131 Hamal GES\u2019te de yakalamay\u0131 hedeflemekteyiz. Di\u011fer projelerimiz gibi bu projemizde de mevcut olan en \u00fcst\u00fcn \u00fcr\u00fcnler, en iyi m\u00fchendislik uygulamalar\u0131 ve bak\u0131m-onar\u0131m hizmetleri ile Avrupa normlar\u0131nda bir sistemi bu de\u011ferli yat\u0131r\u0131mc\u0131m\u0131za teslim edece\u011fiz\u2019ifadelerini kulland\u0131.<\/p>\n<p>10.8 MWp kapasitesiteye sahip santralin; proje planlama, m\u00fchendislik ve sistem kurulumu toplam 5 ay i\u00e7erisinde tamamlanacak ve projenin bak\u0131m onar\u0131m faaliyetleri Asunim\u2019in i\u015ftiraki olan Maxima Enerji taraf\u0131ndan ger\u00e7ekle\u015ftirilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Asunim taraf\u0131ndan T\u00fcrkiye\u2019deki \u00fc\u00e7\u00fcnc\u00fc lisansl\u0131 GES projesi Hamal GES i\u00e7in daha \u00f6nce projelendirme ve m\u00fchendislik hizmetlerine y\u00f6nelik Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019ndan \u00f6n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39733,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[6742,67,1009,1972,2326,23416,23133,23131,36815,36816,36817],"views":1170,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71565"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71565"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71565\/revisions"}],"predecessor-version":[{"id":71566,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71565\/revisions\/71566"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39733"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}