{"id":71494,"date":"2018-02-09T14:10:21","date_gmt":"2018-02-09T11:10:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71494"},"modified":"2018-02-09T14:10:21","modified_gmt":"2018-02-09T11:10:21","slug":"zorlu-enerji-ile-jdeco-filistinde-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-ile-jdeco-filistinde-gunes-santrali-kuracak\/","title":{"rendered":"(Turkish) Zorlu Enerji \u0130le JDECO Filistin\u2019de G\u00fcne\u015f Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71494\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019den Zorlu Enerji ile Filistin\u2019in elektrik da\u011f\u0131t\u0131m\u0131n\u0131n d\u00f6rtte birini ger\u00e7ekle\u015ftiren ve Filistin\u2019in ana elektrik da\u011f\u0131t\u0131c\u0131s\u0131 olan JDECO (Jeruselam District Electricity Company), b\u00f6lgeye elektrik sa\u011flamak i\u00e7in ilk etapta 30 MW olmak \u00fczere toplamda 100 MW kurulu g\u00fcce eri\u015fecek g\u00fcne\u015f enerjisi projelerinin yap\u0131lmas\u0131n\u0131 \u00f6ng\u00f6ren \u201cOrtak Giri\u015fim Anla\u015fmas\u0131\u201dna imza att\u0131. <\/strong><\/p>\n<p>Zorlu Enerji ile Filistin\u2019in elektri\u011finin y\u00fczde 25\u2019ini sa\u011flayan elektrik da\u011f\u0131t\u0131m \u015firketi olan JDECO\u2019nun hissedar oldu\u011fu Sharekat Kahrabaa Mohavazat AL-Quds AL-Urdineyyah (Sharekat) aras\u0131nda \u201cOrtak <img loading=\"lazy\" class=\"alignleft size-medium wp-image-71495\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/zorlu-enerji-ile-jdeco-filistinde-gunes-santrali-kuracak-300x176.jpg\" alt=\"\" width=\"300\" height=\"176\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/zorlu-enerji-ile-jdeco-filistinde-gunes-santrali-kuracak-300x176.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/zorlu-enerji-ile-jdeco-filistinde-gunes-santrali-kuracak-500x293.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/zorlu-enerji-ile-jdeco-filistinde-gunes-santrali-kuracak-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/zorlu-enerji-ile-jdeco-filistinde-gunes-santrali-kuracak.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Giri\u015fim Anla\u015fmas\u0131\u201d imzaland\u0131. B\u00f6lgenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in ilk etapta 30 MW olmak \u00fczere toplamda 100 MW kurulu g\u00fcce eri\u015fecek g\u00fcne\u015f enerjisi projelerinin yap\u0131lmas\u0131n\u0131 \u00f6ng\u00f6ren anla\u015fman\u0131n imza t\u00f6reni 8 \u015eubat Per\u015fembe g\u00fcn\u00fc Zorlu Enerji ile JDECO temsilcilerinin ve uluslararas\u0131 finansal kurumlar\u0131n kat\u0131l\u0131m\u0131yla ger\u00e7ekle\u015fti<\/p>\n<p>Konuyla ilgili a\u00e7\u0131klamada bulunan Zorlu Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ahmet Zorlu, \u201cZorlu Grubu olarak enerji alan\u0131nda 25 y\u0131la dayanan bilgi birikimi ve deneyimimizi yenilenebilir enerji projeleriyle yurt d\u0131\u015f\u0131na ta\u015f\u0131maya devam ediyoruz. Bu vizyon do\u011frultusunda ge\u00e7en y\u0131l b\u00f6lgenin enerji ihtiyac\u0131n\u0131 g\u00fcne\u015f santralleriyle kar\u015f\u0131lamak \u00fczere JDECO ile imzalad\u0131\u011f\u0131m\u0131z iyi niyet anla\u015fmas\u0131n\u0131 daha somut ad\u0131mlar atmak \u00fczere \u2018Ortak Giri\u015fim Anla\u015fmas\u0131\u2019 ile devam ettirmekten mutluluk duyuyoruz. B\u00f6lgede \u015fu anda 18 MW\u2019l\u0131k bir g\u00fcne\u015f santrali bulunuyor. JDECO ile i\u015fbirli\u011fimiz sayesinde bunu 100 MW\u2019a \u00e7\u0131karmay\u0131 hedefliyoruz. G\u00fcne\u015f ba\u015fta olmak \u00fczere farkl\u0131 yenilenebilir enerji projelerine yurtd\u0131\u015f\u0131nda yapaca\u011f\u0131m\u0131z yat\u0131r\u0131mlarla enerjideki uluslararas\u0131 g\u00fcc\u00fcm\u00fcz\u00fc art\u0131rmak istiyoruz.\u201d<\/p>\n<p><strong>\u201cFilistin\u2019e ve \u00e7evresindeki b\u00f6lgelere alternatif bir enerji \u00e7\u00f6z\u00fcm\u00fc sa\u011flayaca\u011f\u0131z\u201d<\/strong><\/p>\n<p>JDECO Ba\u015fkan\u0131 Yusuf Dajani ise konu ile ilgili olarak \u201cJDECO Y\u00f6netim Kurulu \u00dcyeleri, hissedarlar ve \u00e7al\u0131\u015fma arkada\u015flar\u0131m ad\u0131na Zorlu Enerji ile ger\u00e7ekle\u015ftirilen bu ortak giri\u015fimin stratejik \u00f6neminin alt\u0131n\u0131 \u00e7izmek isterim. Bu ortakl\u0131k JDECO\u2019ya Filistin\u2019de sekt\u00f6rel bilgi, ortak kaynak mobilizasyonu ve g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcne odaklanma olana\u011f\u0131 sa\u011flayacak. Filistin halk\u0131na elektrik sa\u011flama konusunda 100 y\u0131ll\u0131k ge\u00e7mi\u015fe sahip olan JDECO\u2019nun Zorlu Enerji ile ger\u00e7ekle\u015ftirdi\u011fi bu anla\u015fma sayesinde g\u00fcne\u015f enerjisi \u00fcretimi ve da\u011f\u0131t\u0131m\u0131nda lider konuma y\u00fcr\u00fcyerek uygun maliyetli, s\u00fcrd\u00fcr\u00fclebilir enerji kaynaklar\u0131 arayan Filistin\u2019e ve \u00e7evresindeki b\u00f6lgelere alternatif bir enerji \u00e7\u00f6z\u00fcm\u00fc sa\u011flayaca\u011f\u0131z. Zorlu Enerji\u2019ye, hissedarlar\u0131m\u0131za, i\u015f ortaklar\u0131m\u0131za ve T\u00fcrkiye Cumhuriyeti h\u00fck\u00fcmetine bu stratejik ortakl\u0131kta bize destek sa\u011flad\u0131\u011f\u0131 i\u00e7in te\u015fekk\u00fcr ederiz.\u201d dedi. Filistin\u2019in \u00f6nde gelen elektrik da\u011f\u0131t\u0131m \u015firketi olan ve ge\u00e7mi\u015fi 100 y\u0131l \u00f6ncesine dayanan, Osmanl\u0131 Devleti zaman\u0131nda kurulan ve g\u00fcn\u00fcm\u00fczde Filistin elektrik da\u011f\u0131t\u0131m\u0131n\u0131n d\u00f6rtte birini sa\u011flayan JDECO (Jerusalem District Electricity Company) Kud\u00fcs, Beithlehem, Ramallah ve Jericho b\u00f6lgelerine elektrik da\u011f\u0131t\u0131m hizmeti veriyor. Filistin b\u00f6lgesinde elektrik hizmeti sunan d\u00f6rt da\u011f\u0131t\u0131mc\u0131 \u015firketten biri olan JDECO, belediyelerin de hissedar\u0131 oldu\u011fu \u00f6zel bir elektrik tedarik ve da\u011f\u0131t\u0131m \u015firketi konumunda.<\/p>\n<p>G\u00fcne\u015f enerjisi alanda T\u00fcrkiye\u2019de \u00e7\u00f6z\u00fcm ve hizmetlerini \u00e7e\u015fitlendiren Zorlu Enerji ise Pakistan\u2019da 300 MW kurulu g\u00fcce sahip olacak g\u00fcne\u015f santralleri i\u00e7in kurulum \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. Zorlu Enerji, ayr\u0131ca, r\u00fczg\u00e2r ve g\u00fcne\u015f enerjisi bir arada \u00e7al\u0131\u015facak Pakistan\u2019\u0131n ilk hibrit santrali i\u00e7in de \u00f6n lisansa sahip<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019den Zorlu Enerji ile Filistin\u2019in elektrik da\u011f\u0131t\u0131m\u0131n\u0131n d\u00f6rtte birini ger\u00e7ekle\u015ftiren ve Filistin\u2019in ana elektrik da\u011f\u0131t\u0131c\u0131s\u0131 olan JDECO (Jeruselam District Electricity Company), b\u00f6lgeye elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71495,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[67,1009,23311,2326,35038,23416,23131],"views":776,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71494"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71494"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71494\/revisions"}],"predecessor-version":[{"id":71496,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71494\/revisions\/71496"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71495"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71494"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71494"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}