{"id":71461,"date":"2018-02-08T12:06:29","date_gmt":"2018-02-08T09:06:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71461"},"modified":"2018-02-08T12:06:29","modified_gmt":"2018-02-08T09:06:29","slug":"rosatomdan-akkuyu-projesine-yonelik-ortaklik-icin-euas-ile-gorusme","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rosatomdan-akkuyu-projesine-yonelik-ortaklik-icin-euas-ile-gorusme\/","title":{"rendered":"(Turkish) Rosatom&#8217;dan Akkuyu Projesine Y\u00f6nelik Ortakl\u0131k \u0130\u00e7in E\u00dcA\u015e \u0130le G\u00f6r\u00fc\u015fme&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71461\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akkuyu N\u00fckleer A.\u015e. Bas\u0131n S\u00f6zc\u00fcs\u00fc Vasiliy Korelskiy taraf\u0131ndan Rusya Devlet N\u00fckleer Enerji Kurumu\u2019nun (Rosatom) T\u00fcrk devletine ait Elektrik \u00dcretim Anonim \u015eirketi (E\u00dcA\u015e) de dahil olmak \u00fczere bir\u00e7ok \u015firketle Akkuyu projesinde ortakl\u0131k i\u00e7in g\u00f6r\u00fc\u015fme yapt\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-45284\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akkuyu-ngs-238778923-696x385-300x165.jpg\" alt=\"\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akkuyu-ngs-238778923-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akkuyu-ngs-238778923-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akkuyu-ngs-238778923-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akkuyu-ngs-238778923-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><span id=\"more-97709\"><\/span>Korelskiy, \u201cRosatom, Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali projesine kat\u0131lmak ve Rosatom\u2019un partneri olmak isteyen bir\u00e7ok \u015firketle g\u00f6r\u00fc\u015fmeler yap\u0131yor. Projeye kat\u0131l\u0131m\u0131n sonu\u00e7lar\u0131n\u0131 yorumlamak i\u00e7in ise hen\u00fcz erken. Daha \u00f6nce bu b\u00fcy\u00fck projede yer alma iste\u011fini belirten \u00fc\u00e7 T\u00fcrk \u015firketi de buna dahil. Rus taraf\u0131, t\u00fcm teklifleri inceliyor ve yap\u0131c\u0131 diyalo\u011fa haz\u0131r\u201d dedi.<\/p>\n<p>Rusya ve T\u00fcrkiye aras\u0131nda imzalanan h\u00fck\u00fcmetleraras\u0131 anla\u015fmaya g\u00f6re Rosatom\u2019un projenin y\u00fczde 49 hissesini farkl\u0131 \u015firketlere satabilece\u011fini an\u0131msatan Korelskiy, \u201cBu konunun 2018 y\u0131l\u0131nda \u00e7\u00f6z\u00fcme kavu\u015fturulmas\u0131n\u0131 umuyoruz. E\u00dcA\u015e\u2019\u0131n projeye kat\u0131lmas\u0131ndan mutluluk duyar\u0131z. Projenin maliyeti her ge\u00e7en g\u00fcn art\u0131\u015f g\u00f6stermektedir ve lisans al\u0131nd\u0131ktan sonra bu rakam daha da y\u00fckselecektir\u201d ifadelerine yer verdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akkuyu N\u00fckleer A.\u015e. Bas\u0131n S\u00f6zc\u00fcs\u00fc Vasiliy Korelskiy taraf\u0131ndan Rusya Devlet N\u00fckleer Enerji Kurumu\u2019nun (Rosatom) T\u00fcrk devletine ait Elektrik \u00dcretim Anonim \u015eirketi (E\u00dcA\u015e) de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38178,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,67,1009,2393,1033,21,23134,25480,34930,2587],"views":846,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71461"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71461"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71461\/revisions"}],"predecessor-version":[{"id":71462,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71461\/revisions\/71462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38178"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}