{"id":71329,"date":"2018-02-03T12:18:41","date_gmt":"2018-02-03T09:18:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71329"},"modified":"2018-02-03T12:23:12","modified_gmt":"2018-02-03T09:23:12","slug":"orduda-copten-elektrik-uretimi-gerceklestirilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orduda-copten-elektrik-uretimi-gerceklestirilecek\/","title":{"rendered":"(Turkish) Ordu\u2019da \u00c7\u00f6pten Elektrik \u00dcretimi Ger\u00e7ekle\u015ftirilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71329\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ordu B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan y\u0131llard\u0131r Ordu\u2019nun g\u00fcndeminde yer alan \u00e7\u00f6p sorununun \u00e7\u00f6z\u00fcme kavu\u015fturmas\u0131ndan sonra, \u015fimdi de \u00e7\u00f6pten elektrik \u00fcretip satarak gelir sa\u011flanacak.<\/strong><\/p>\n<p>Ba\u015fkan Enver Y\u0131lmaz,\u00a0\u201cOlu\u015fturdu\u011fumuz modern sistem ile, il\u00e7e belediyelerimizce\u00a0<img loading=\"lazy\" class=\"alignright size-medium wp-image-9086\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/copten-elektrik-uretimi-biyogaz-300x177.jpg\" alt=\"\" width=\"300\" height=\"177\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/copten-elektrik-uretimi-biyogaz-300x177.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/copten-elektrik-uretimi-biyogaz-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/copten-elektrik-uretimi-biyogaz.jpg 464w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>toplanan \u00e7\u00f6pler, ilk \u00f6nce Alt\u0131nordu ve \u00dcnye Cevizdere\u2019de kurdu\u011fumuz kat\u0131 at\u0131k ayr\u0131\u015ft\u0131rma tesislerinde toplanarak ayr\u0131\u015ft\u0131rma i\u015flemine tabi tutulup Cam, plastik vb. ekonomik de\u011feri olanlar ayr\u0131\u015ft\u0131r\u0131lacak, yak\u0131labilir mahiyette olanlar da \u00dcnye \u00c7imento Fabrikas\u0131na g\u00f6nderilecek. Kalan organik at\u0131k \u00e7\u00f6pler ise \u00c7ayba\u015f\u0131 \u0130lk\u00fcvez\u2019de Avrupa Birli\u011fi standartlar\u0131na g\u00f6re modern tekniklerle in\u015fa edilen d\u00fczenli depolama sahas\u0131na iletilecektir\u201d ifadelerini kulland\u0131.<\/p>\n<p>Elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek olan tesisin ihalesinin yap\u0131ld\u0131\u011f\u0131n\u0131 s\u00f6yleyen Ba\u015fkan Y\u0131lmaz, \u201c\u00c7ayba\u015f\u0131 \u0130lk\u00fcvez\u2019de yapaca\u011f\u0131m\u0131z elektrik \u00fcretim tesisinin ihalesini ger\u00e7ekle\u015ftirdik. Bu tesisimiz ile \u00fcretilecek elektrikten ciddi anlamda gelir sa\u011flamay\u0131 \u00f6ng\u00f6rmekteyiz. \u00dcnye \u00c7imento\u2019ya satt\u0131\u011f\u0131m\u0131z \u00e7\u00f6pten ve \u0130lk\u00fcvez\u2019deki tesiste \u00fcretilecek olan elektrikten sa\u011flanan gelirle Ordu B\u00fcy\u00fck\u015fehir Belediyemiz, hen\u00fcz kurulu\u015funun 4.\u00fcnc\u00fc y\u0131l\u0131nda, T\u00fcrkiye\u2019nin \u00e7\u00f6p konusunda kendisine yeten belki de ilk belediyesi konumunda olacakt\u0131r\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ordu B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan y\u0131llard\u0131r Ordu\u2019nun g\u00fcndeminde yer alan \u00e7\u00f6p sorununun \u00e7\u00f6z\u00fcme kavu\u015fturmas\u0131ndan sonra, \u015fimdi de \u00e7\u00f6pten elektrik \u00fcretip satarak gelir sa\u011flanacak. Ba\u015fkan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9086,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[640,35143,29816,36755,2880,68,19,67,1009,7162,26829],"views":1538,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71329"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71329"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71329\/revisions"}],"predecessor-version":[{"id":71332,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71329\/revisions\/71332"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9086"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}