{"id":71324,"date":"2018-02-03T12:05:08","date_gmt":"2018-02-03T09:05:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71324"},"modified":"2018-02-03T12:05:08","modified_gmt":"2018-02-03T09:05:08","slug":"turkmenistan-ve-calik-holdingten-enerji-anlasmasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkmenistan-ve-calik-holdingten-enerji-anlasmasi\/","title":{"rendered":"(Turkish) T\u00fcrkmenistan ve \u00c7al\u0131k Holding&#8217;ten Enerji Anla\u015fmas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71324\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkmenistan, Pakistan ve Afganistan hatt\u0131nda in\u015fa edilecek enerji nakil hatt\u0131 projesine y\u00f6nelik T\u00fcrkmenistan Enerji Bakanl\u0131\u011f\u0131 ve \u00c7al\u0131k Holding aras\u0131nda\u00a031 Ocak\u2019ta mutabakat<img loading=\"lazy\" class=\"alignright size-medium wp-image-71325\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/turkmenistan-ve-calik-holdingten-enerji-anlasmasi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/turkmenistan-ve-calik-holdingten-enerji-anlasmasi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/turkmenistan-ve-calik-holdingten-enerji-anlasmasi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/turkmenistan-ve-calik-holdingten-enerji-anlasmasi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/02\/turkmenistan-ve-calik-holdingten-enerji-anlasmasi.jpg 670w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> zapt\u0131 yap\u0131ld\u0131.<\/strong><span id=\"more-97571\"><\/span><\/p>\n<p>T\u00fcrkmenistan Cumhurba\u015fkan\u0131 Kurbankulu Berdimuhammedov\u2019un talimat\u0131 ile T\u00fcrkmenistan Enerji Bakanl\u0131\u011f\u0131nca, T\u00fcrkmenistan, Afganistan ve Pakistan hatt\u0131 boyunca 500 kilowattl\u0131k enerji iletim hatt\u0131n\u0131n in\u015fas\u0131nda kar\u015f\u0131l\u0131kl\u0131 i\u015f birli\u011fi i\u00e7in yasal \u00e7er\u00e7evenin geli\u015ftirilmesi ad\u0131na daha \u00f6nce toplant\u0131 d\u00fczenlenmi\u015fti.<\/p>\n<p>Ba\u015fkent A\u015fkabat\u2019ta ger\u00e7ekle\u015ftirilen t\u00f6renle imzalanan mutabakat metni dahilinde, \u00c7al\u0131k Holding ile enerji sekt\u00f6r\u00fcnde etkin i\u015f birli\u011fini art\u0131rmaya y\u00f6nelik belirli \u00f6nerileri i\u00e7eren program ve verimli diyalog ad\u0131na g\u00fcvenilir bir temel olu\u015fturulaca\u011f\u0131 dile getirildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkmenistan, Pakistan ve Afganistan hatt\u0131nda in\u015fa edilecek enerji nakil hatt\u0131 projesine y\u00f6nelik T\u00fcrkmenistan Enerji Bakanl\u0131\u011f\u0131 ve \u00c7al\u0131k Holding aras\u0131nda\u00a031 Ocak\u2019ta mutabakat zapt\u0131 yap\u0131ld\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71325,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[1624,1051,34979,26353,63,67,1009,36754,165,1315,1040],"views":1236,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71324"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71324"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71324\/revisions"}],"predecessor-version":[{"id":71326,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71324\/revisions\/71326"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71325"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}