{"id":71267,"date":"2018-02-01T10:12:11","date_gmt":"2018-02-01T07:12:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71267"},"modified":"2018-02-01T10:12:11","modified_gmt":"2018-02-01T07:12:11","slug":"ermenistandaki-metsamor-ngs-kapatilmalidir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ermenistandaki-metsamor-ngs-kapatilmalidir\/","title":{"rendered":"(Turkish) \u201cErmenistan\u2019daki Metsamor NGS Kapat\u0131lmal\u0131d\u0131r\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71267\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bas\u0131nda yer alan habere g\u00f6re, Avrupa D\u0131\u015f Eylem Servisi\u2019ndeki Do\u011fu Ortakl\u0131\u011f\u0131 \u00dclkeleri B\u00f6l\u00fcm\u00fc Ba\u015fkan Yard\u0131mc\u0131s\u0131 Dirk Lorenz, \u201cErmenistan\u2019\u0131n Metsamor n\u00fckleer santrali <img loading=\"lazy\" class=\"alignright size-medium wp-image-71260\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/ermenistanin-metsamor-nukleer-santrali-kapatilmalidir-300x185.jpg\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/ermenistanin-metsamor-nukleer-santrali-kapatilmalidir-300x185.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/ermenistanin-metsamor-nukleer-santrali-kapatilmalidir-500x309.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/ermenistanin-metsamor-nukleer-santrali-kapatilmalidir-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/ermenistanin-metsamor-nukleer-santrali-kapatilmalidir.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>kapat\u0131lmal\u0131d\u0131r\u201d ifadelerini kulland\u0131.<\/strong><\/p>\n<p><span id=\"more-97503\"><\/span>Yetkili, &#8220;n\u00fckleer santralin m\u00fcmk\u00fcn olan en k\u0131sa s\u00fcrede kapat\u0131lmas\u0131 gerekti\u011fini belirtti \u00e7\u00fcnk\u00fc uluslararas\u0131 g\u00fcvenlik \u015fartlar\u0131n\u0131 tam olarak kar\u015f\u0131layacak bir d\u00fczeye getirmek m\u00fcmk\u00fcn de\u011fildir&#8221; dedi. Daha \u00f6nce, AB taraf\u0131ndan Metsamor n\u00fckleer santralinin kapat\u0131lmas\u0131 i\u00e7in Ermenistan\u2019a 200 milyon euro tahsis etme s\u00f6z\u00fc verilmi\u015fti.<\/p>\n<p>Metsamor n\u00fckleer santralinin in\u015fas\u0131 1970\u2019de ba\u015flad\u0131. 1988\u2019de Spitak kentinde meydana gelen y\u0131k\u0131c\u0131 depremden sonra fabrika bile kapat\u0131l\u0131rken 1995 y\u0131l\u0131nda uluslararas\u0131 protesto g\u00f6sterilerine ra\u011fmen n\u00fckleer santralin \u00e7al\u0131\u015fmas\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc ve ikinci reakt\u00f6r devreye al\u0131nd\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bas\u0131nda yer alan habere g\u00f6re, Avrupa D\u0131\u015f Eylem Servisi\u2019ndeki Do\u011fu Ortakl\u0131\u011f\u0131 \u00dclkeleri B\u00f6l\u00fcm\u00fc Ba\u015fkan Yard\u0131mc\u0131s\u0131 Dirk Lorenz, \u201cErmenistan\u2019\u0131n Metsamor n\u00fckleer santrali kapat\u0131lmal\u0131d\u0131r\u201d ifadelerini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71260,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1192,67,1009,3772,880,21,23134,88,34930],"views":1281,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71267"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71267"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71267\/revisions"}],"predecessor-version":[{"id":71269,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71267\/revisions\/71269"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71260"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71267"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71267"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}