{"id":71265,"date":"2018-02-01T10:06:38","date_gmt":"2018-02-01T07:06:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71265"},"modified":"2018-02-01T10:06:38","modified_gmt":"2018-02-01T07:06:38","slug":"sinopta-kurulacak-ngsye-yonelik-halkin-katilimi-toplantisi-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sinopta-kurulacak-ngsye-yonelik-halkin-katilimi-toplantisi-yapilacak\/","title":{"rendered":"(Turkish) Sinop\u2019ta Kurulacak NGS&#8217;ye Y\u00f6nelik \u201cHalk\u0131n Kat\u0131l\u0131m\u0131 Toplant\u0131s\u0131\u201d Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71265\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Elektrik \u00dcretim A\u015e (E\u00dcA\u015e) i\u015ftiraki EUAS International ICC taraf\u0131ndan,Sinop\u2019ta kurulacak olan \u00fclkemizin ikinci n\u00fckleer g\u00fc\u00e7 santrali (NGS) Sinop NGS Projesi\u2019nin \u00c7evresel Etki <img loading=\"lazy\" class=\"alignleft size-medium wp-image-41736\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/sinop-nukleer-santrali-projesi-son-durum-696x385-300x165.jpg\" alt=\"\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/sinop-nukleer-santrali-projesi-son-durum-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/sinop-nukleer-santrali-projesi-son-durum-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/sinop-nukleer-santrali-projesi-son-durum-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/sinop-nukleer-santrali-projesi-son-durum-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>De\u011ferlendirmesi (\u00c7ED) kapsam\u0131nda \u201cHalk\u0131n Kat\u0131l\u0131m\u0131 Toplant\u0131s\u0131\u201d yap\u0131lacak.<\/strong><\/p>\n<p>EUAS International\u2019dan yap\u0131lan a\u00e7\u0131klamada, kentin \u0130nceburun mevkisinde kurulmas\u0131 planlanan Sinop NGS Projesi \u00c7ED Y\u00f6netmeli\u011fi\u2019nin 9. Maddesi uyar\u0131nca, 6 \u015eubat Sal\u0131 g\u00fcn\u00fc halk\u0131 bilgilendirmek, g\u00f6r\u00fc\u015f ve \u00f6nerilerini almak i\u00e7in toplant\u0131 yap\u0131lacak. Sinop NGS Projesi\u2019nin \u00c7ED ba\u015fvuru dosyas\u0131, \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131na 12 Ocak\u2019ta g\u00f6nderilmi\u015fti.<\/p>\n<p>Kentte, Japon-Frans\u0131z ortakl\u0131\u011f\u0131yla olu\u015fturulacak T\u00fcrkiye\u2019nin ikinci n\u00fckleer santrali 4 bin 480 megavat kurulu kapasiteye sahip olup 4 reakt\u00f6rden olu\u015facak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Elektrik \u00dcretim A\u015e (E\u00dcA\u015e) i\u015ftiraki EUAS International ICC taraf\u0131ndan,Sinop\u2019ta kurulacak olan \u00fclkemizin ikinci n\u00fckleer g\u00fc\u00e7 santrali (NGS) Sinop NGS Projesi\u2019nin \u00c7evresel Etki De\u011ferlendirmesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44092,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,67,1009,23134,34931,34930],"views":953,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71265"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71265"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71265\/revisions"}],"predecessor-version":[{"id":71266,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71265\/revisions\/71266"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44092"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}