{"id":71255,"date":"2018-01-31T21:01:56","date_gmt":"2018-01-31T18:01:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71255"},"modified":"2018-01-31T21:01:56","modified_gmt":"2018-01-31T18:01:56","slug":"3-uncu-nukleer-santralin-yeri-bu-yil-belirleniyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/3-uncu-nukleer-santralin-yeri-bu-yil-belirleniyor\/","title":{"rendered":"(Turkish) 3 \u00fcnc\u00fc N\u00fckleer Santralin Yeri Bu Y\u0131l Belirleniyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71255\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye n\u00fckleer enerji konusunda Akkuyu ve Sinop santrallerinde \u00e7al\u0131\u015fmalar\u0131n\u0131 devam ettirirken bu y\u0131l i\u00e7erisinde \u00fc\u00e7\u00fcnc\u00fc n\u00fckleer santral projesinde de yer se\u00e7iminin <img loading=\"lazy\" class=\"alignleft size-medium wp-image-5878\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>kesinle\u015ftirilmesi hedefleniyor.<\/strong><\/p>\n<p><span id=\"more-97510\"><\/span>2015 y\u0131l\u0131nda bakanl\u0131k taraf\u0131ndan \u00f6nerilen sahalarda de\u011ferlendirmeler yap\u0131ld\u0131. \u0130lgili \u00e7al\u0131\u015fmalar\u0131n tamamlanmas\u0131na ra\u011fmen bakanl\u0131k hen\u00fcz nihai karar\u0131n\u0131 vermedi. Programda 3. n\u00fckleer santralin yerinin bu y\u0131l belirlenmesi bekleniyor. S\u00f6z konusu \u00e7al\u0131\u015fmalara sahan\u0131n a\u00e7\u0131klanmas\u0131ndan sonra ba\u015flanaca\u011f\u0131 ve 18 ila 24 ay i\u00e7erisinde tamamlanmas\u0131n\u0131n \u00f6ng\u00f6r\u00fcld\u00fc\u011f\u00fc aktar\u0131ld\u0131. T\u00fcrkiye\u2019nin ilk n\u00fckleer enerji santrali projesi olan ve 2023\u2019te devreye girmesi hedeflenen Akkuyu\u2019da \u00e7al\u0131\u015fmalar t\u00fcm h\u0131z\u0131yla s\u00fcr\u00fcyor.<\/p>\n<p>\u00d6te yandan Sinop \u0130nceburun\u2019da in\u015fas\u0131 planlanan ikinci n\u00fckleer santralin \u00c7evresel Etki De\u011ferlendirmesi (\u00c7ED) kapsam\u0131nda halk\u0131n g\u00f6r\u00fc\u015f ve \u00f6nerilerini almak i\u00e7in toplant\u0131 yap\u0131lacak. \u00c7ED raporu olumlu gelirse ilk a\u015fama tamamlanm\u0131\u015f olacak ve in\u015faat Japon-Frans\u0131z ortakl\u0131\u011f\u0131yla ba\u015flayacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye n\u00fckleer enerji konusunda Akkuyu ve Sinop santrallerinde \u00e7al\u0131\u015fmalar\u0131n\u0131 devam ettirirken bu y\u0131l i\u00e7erisinde \u00fc\u00e7\u00fcnc\u00fc n\u00fckleer santral projesinde de yer se\u00e7iminin kesinle\u015ftirilmesi hedefleniyor. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5878,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[26466,2878,67,1009,21,23134,25480,8006,34930,5217],"views":1026,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71255"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71255"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71255\/revisions"}],"predecessor-version":[{"id":71256,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71255\/revisions\/71256"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/5878"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}