{"id":71163,"date":"2018-01-28T15:20:48","date_gmt":"2018-01-28T12:20:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71163"},"modified":"2018-01-28T15:20:48","modified_gmt":"2018-01-28T12:20:48","slug":"greenecodan-denizliye-iki-jeotermal-santrali-daha","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/greenecodan-denizliye-iki-jeotermal-santrali-daha\/","title":{"rendered":"(Turkish) Greeneco&#8217;dan Denizli\u2019ye \u0130ki Jeotermal Santrali Daha&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71163\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Denizli ve Ayd\u0131n s\u0131n\u0131rlar\u0131 i\u00e7inde yer alan 25.6 MW\u2019l\u0131k Greeneco JES ve 12.8 MW\u2019l\u0131k Greeneco Sarayk\u00f6y JES olmak \u00fczere iki jeotermal santrali i\u015fleten ve 25.8 MW\u2019l\u0131k 3 JES <img loading=\"lazy\" class=\"alignleft size-medium wp-image-71164\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/greenecodan-denizliye-iki-jeotermal-santrali-daha-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/greenecodan-denizliye-iki-jeotermal-santrali-daha.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/greenecodan-denizliye-iki-jeotermal-santrali-daha-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>i\u00e7in de \u00fcretim lisans\u0131na sahip olan Greeneco Enerji Elektrik \u00dcretim A.\u015e. taraf\u0131ndan iki yeni santralin daha kurulumuna y\u00f6nelik \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/strong><\/p>\n<p>\u015eirket; Denizli \u0130li, Sarayk\u00f6y \u0130l\u00e7esi, Demirta\u015f Mevkii ve Ayd\u0131n \u0130li, Buharkent \u0130l\u00e7esi, Savc\u0131ll\u0131 Mahallesi, \u00c7ubukda\u011f\u0131 Mevkiinde yer alan ruhsatl\u0131 sahas\u0131ndaki 26 MW kapasiteli Jeotermal Enerji Santrali-5 ve yine 26 MW kapasiteli Jeotermal Enerji Santrali-5 kurup i\u015fletecek. Ayr\u0131ca ayn\u0131 ruhsat sahas\u0131 i\u00e7erisinde bu tesisler kapsam\u0131nda toplam 104 adet alanda ara\u015ft\u0131rma ve sondaj \u00e7al\u0131\u015fmalar\u0131 i\u00e7in de izin al\u0131nd\u0131.<\/p>\n<p>Her bir santralin yat\u0131r\u0131m bedelinin 306 milyon 250 bin liraya olmas\u0131 beklenirken 26,4 MWm\/26,0 MWe kurulu g\u00fcc\u00fcndeki her iki santralde de y\u0131lda 191.360.000 kWh elektrik \u00fcretimi yapmas\u0131 planlanmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Denizli ve Ayd\u0131n s\u0131n\u0131rlar\u0131 i\u00e7inde yer alan 25.6 MW\u2019l\u0131k Greeneco JES ve 12.8 MW\u2019l\u0131k Greeneco Sarayk\u00f6y JES olmak \u00fczere iki jeotermal santrali i\u015fleten [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71164,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[7179,2878,845,68,67,1009,23311,5211,36708,36709,58,16077,36184,26829],"views":2340,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71163"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71163"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71163\/revisions"}],"predecessor-version":[{"id":71165,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71163\/revisions\/71165"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71164"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}