{"id":71077,"date":"2018-01-25T13:12:07","date_gmt":"2018-01-25T10:12:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71077"},"modified":"2018-01-25T13:12:40","modified_gmt":"2018-01-25T10:12:40","slug":"orduda-darica-2-hes-daha-faaliyete-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orduda-darica-2-hes-daha-faaliyete-gecti\/","title":{"rendered":"(Turkish) Ordu\u2019da Dar\u0131ca 2 HES Faaliyete Ge\u00e7ti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71077\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ordu\u2019da in\u015faat\u0131 biten 1 hidroelektrik santrali (HES) daha devreye girdi.\u00a0<\/strong><strong>Devreye al\u0131nan HES ile birlikte Ordu\u2019nun derelerinde faaliyette bulunan HES say\u0131s\u0131 13 olurken, 1 tanesinin in\u015faat a\u015famas\u0131nda, 10 tanesinin de plan-proje a\u015famas\u0131nda oldu\u011fu belirlendi.<img loading=\"lazy\" class=\"alignright wp-image-71078 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/orduda-darica-2-hes-daha-faaliyete-gecti-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/orduda-darica-2-hes-daha-faaliyete-gecti-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/orduda-darica-2-hes-daha-faaliyete-gecti-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/orduda-darica-2-hes-daha-faaliyete-gecti-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/orduda-darica-2-hes-daha-faaliyete-gecti.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><span id=\"more-97328\"><\/span><\/p>\n<p>Edinilen bilgilere g\u00f6re, Kabad\u00fcz il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde ge\u00e7en Turnasuyu Irma\u011f\u0131 \u00fczerinde in\u015faat\u0131 tamamlanan Dar\u0131ca 2 HES, 2017 y\u0131l\u0131 sonunda i\u015fletmeye al\u0131nd\u0131. \u0130lk test a\u015famalar\u0131n\u0131 ge\u00e7en HES\u2019te yeni y\u0131ldan itibaren elektrik \u00fcretimine ba\u015fland\u0131.<\/p>\n<p>Dar\u0131ca 2\u2019nin faaliyete ge\u00e7mesiyle birlikte Ordu\u2019nun derelerinde elektrik \u00fcreten HES say\u0131s\u0131 13\u2019e y\u00fckseldi. Alt\u0131nordu il\u00e7esi \u00c7ukurk\u00f6y Deresi \u00fczerinde in\u015faat a\u015famas\u0131nda bulunan ve burada bulunan Karaoluk \u015eelalesi\u2019ne zarar verece\u011fi gerek\u00e7esiyle y\u00f6re sakinleri taraf\u0131ndan tepkiyle kar\u015f\u0131lanan HES\u2019in y\u0131lda 6,63 GWh enerji \u00fcretmesi planlan\u0131yor.<br \/>\nOrdu\u2019da y\u0131lda toplam 1 milyon 912 bin GWh enerji \u00fcretmesi hedeflenen 10 HES ise plan-proje a\u015famas\u0131nda.<\/p>\n<div class=\"td-g-rec td-g-rec-id-content_bottom td_uid_27_5a6978942ff6a_rand td_block_template_2 \"><\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ordu\u2019da in\u015faat\u0131 biten 1 hidroelektrik santrali (HES) daha devreye girdi.\u00a0Devreye al\u0131nan HES ile birlikte Ordu\u2019nun derelerinde faaliyette bulunan HES say\u0131s\u0131 13 olurken, 1 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71078,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[36669,67,1009,34926,26043,4639,1090,26044,7162,36670],"views":1822,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71077"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71077"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71077\/revisions"}],"predecessor-version":[{"id":71080,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71077\/revisions\/71080"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71078"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}