{"id":71005,"date":"2018-01-22T23:39:41","date_gmt":"2018-01-22T20:39:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=71005"},"modified":"2018-01-22T23:39:41","modified_gmt":"2018-01-22T20:39:41","slug":"bursanin-atiklarindan-elektrik-uretilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bursanin-atiklarindan-elektrik-uretilecek\/","title":{"rendered":"(Turkish) Bursa\u2019n\u0131n At\u0131klar\u0131ndan Elektrik \u00dcretilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/71005\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bursa B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan Nil\u00fcfer \u0130l\u00e7esi KaYapa Mahallesi Kuru\u00e7e\u015fme <img loading=\"lazy\" class=\"alignright size-medium wp-image-71006\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/bursanin-atiklarindan-elektrik-uretilecek-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/bursanin-atiklarindan-elektrik-uretilecek.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/bursanin-atiklarindan-elektrik-uretilecek-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>mevkiinde Entegre Kat\u0131 At\u0131k Geri Kazan\u0131m ve Bertaraf Tesisi kurulumu yap\u0131lacak.<\/strong><\/p>\n<p>Proje i\u00e7in ayr\u0131lan yakla\u015f\u0131k 2 milyon metrekarelik bir alanda yap\u0131lmas\u0131 planlanan ana tesisler ikinci s\u0131n\u0131f d\u00fczenli depolama alan\u0131 lotu ve mekanik ay\u0131rma, biyometanizasyon ve at\u0131ktan t\u00fcretilmi\u015f yak\u0131t \u00fcnitelerini i\u00e7eren mekanik biyolojik ar\u0131tma tesisi (MBT), enerji \u00fcretim tesisi ve s\u0131z\u0131nt\u0131 suyu ar\u0131tma tesisi olacakt\u0131r.<\/p>\n<p>Mekanik ay\u0131rma tesisi 2500 ton\/g\u00fcn kapasiteli, biyometanizasyon tesisi 1200 ton\/g\u00fcn kapasiteli, at\u0131ktan t\u00fcketilmi\u015f yak\u0131t \u00fcretim tesisi 1300 ton\/g\u00fcn kapasiteli olacak.\u00a0Mekanik ay\u0131rma sonras\u0131nda yakla\u015f\u0131k y\u00fczde 50 oran\u0131na sahip organik fraksiyon i\u00e7in biyometanizasyon prosesi uygulanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bursa B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan Nil\u00fcfer \u0130l\u00e7esi KaYapa Mahallesi Kuru\u00e7e\u015fme mevkiinde Entegre Kat\u0131 At\u0131k Geri Kazan\u0131m ve Bertaraf Tesisi kurulumu yap\u0131lacak. Proje i\u00e7in ayr\u0131lan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71006,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[35143,1678,29816,28197,958,67,1009,9470,2942,26829],"views":1241,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71005"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=71005"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71005\/revisions"}],"predecessor-version":[{"id":71007,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/71005\/revisions\/71007"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71006"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=71005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=71005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=71005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}