{"id":70918,"date":"2018-01-18T16:42:58","date_gmt":"2018-01-18T13:42:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70918"},"modified":"2018-01-18T16:42:58","modified_gmt":"2018-01-18T13:42:58","slug":"aksa-enerji-incesu-hesi-fernas-sirketler-grubuna-satti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerji-incesu-hesi-fernas-sirketler-grubuna-satti\/","title":{"rendered":"(Turkish) Aksa Enerji, \u0130ncesu HES\u2019i Fernas \u015eirketler Grubu\u2019na Satt\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70918\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aksa Enerji \u00dcretim A\u015e\u2019ye ait \u0130ncesu Hidroelektrik Santrali\u2019nin 15 milyon dolar bedel ile <img loading=\"lazy\" class=\"alignleft size-medium wp-image-70913\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/aksa-enerji-incesu-hesin-satisini-fernas-sirketler-grubuna-yapti-300x185.jpg\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/aksa-enerji-incesu-hesin-satisini-fernas-sirketler-grubuna-yapti-300x185.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/aksa-enerji-incesu-hesin-satisini-fernas-sirketler-grubuna-yapti-500x309.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/aksa-enerji-incesu-hesin-satisini-fernas-sirketler-grubuna-yapti-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/aksa-enerji-incesu-hesin-satisini-fernas-sirketler-grubuna-yapti.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Fernas \u015eirketler Grubu\u2019na sat\u0131\u015f\u0131n\u0131n tamamland\u0131\u011f\u0131 bildirildi.<\/strong><\/p>\n<p><span id=\"more-97147\"><\/span>Aksa Enerji taraf\u0131ndan Kamuyu Ayd\u0131nlatma Platformu\u2019na yap\u0131lan bildirimde, santralin 15 megavat kurulu g\u00fcce sahip oldu\u011fu kaydedildi.<\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurumu ve Rekabet Kurumu\u2019nun sat\u0131\u015f\u0131 onaylad\u0131\u011f\u0131 ifade edilen a\u00e7\u0131klamada, \u201cSantralin Fernas Grup \u015eirketlerinden Deniz Elektrik \u00dcretim Ltd. \u015eti\u2019ye sat\u0131\u015f\u0131 17 Ocak 2018\u2019de tamamlanm\u0131\u015ft\u0131r. Sat\u0131\u015f bedeli olan 15 milyon dolar tahsil edilmi\u015f olup 1 milyon 404 bin 553 lira sat\u0131\u015f kar\u0131 Aksa Enerji\u2019nin k\u0131sa vadeli y\u00fck\u00fcml\u00fcl\u00fcklerinin azalt\u0131lmas\u0131nda kullan\u0131lacakt\u0131r.\u201d ifadelerine yer verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aksa Enerji \u00dcretim A\u015e\u2019ye ait \u0130ncesu Hidroelektrik Santrali\u2019nin 15 milyon dolar bedel ile Fernas \u015eirketler Grubu\u2019na sat\u0131\u015f\u0131n\u0131n tamamland\u0131\u011f\u0131 bildirildi. Aksa Enerji taraf\u0131ndan Kamuyu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70919,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1571,36602,67,1009,750,26043,26044,35468,4617],"views":1778,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70918"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70918"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70918\/revisions"}],"predecessor-version":[{"id":70920,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70918\/revisions\/70920"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70919"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}