{"id":70854,"date":"2018-01-16T12:23:07","date_gmt":"2018-01-16T09:23:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70854"},"modified":"2018-01-16T12:23:07","modified_gmt":"2018-01-16T09:23:07","slug":"gazprom-turk-akimina-yatirimi-3-2-milyar-dolar-artiriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gazprom-turk-akimina-yatirimi-3-2-milyar-dolar-artiriyor\/","title":{"rendered":"(Turkish) Gazprom T\u00fcrk Ak\u0131m\u0131\u2019na Yat\u0131r\u0131m\u0131 3.2 Milyar Dolar Art\u0131r\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70854\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Gazprom\u2019un, T\u00fcrk Ak\u0131m\u0131 do\u011falgaz boru hatt\u0131 projesine bu y\u0131lki yat\u0131r\u0131m miktar\u0131n\u0131, bir \u00f6nceki y\u0131la g\u00f6re y\u00fczde 89,6 art\u0131\u015fla 182,4 milyar rubleye y\u00fckseltece\u011fi bildirildi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-47475\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/gazpromun-fransaya-dogalgaz-ihraci-artti-300x211.jpg\" alt=\"\" width=\"300\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/gazpromun-fransaya-dogalgaz-ihraci-artti-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/gazpromun-fransaya-dogalgaz-ihraci-artti-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/gazpromun-fransaya-dogalgaz-ihraci-artti.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><span id=\"more-97085\"><\/span>\u015eirketten yap\u0131lan a\u00e7\u0131klamada, Gazprom\u2019un ge\u00e7en y\u0131l T\u00fcrk Ak\u0131m\u0131 projesine 92,8 milyar ruble yat\u0131r\u0131m yapt\u0131\u011f\u0131 hat\u0131rlat\u0131ld\u0131. T\u00fcrk Ak\u0131m\u0131\u2019na toplam yat\u0131r\u0131m\u0131n 2018\u2019de ise y\u00fczde 89,6\u2019l\u0131k art\u0131\u015fla 182,4 milyar rubleye (yakla\u015f\u0131k 3.2 milyar dolar) y\u00fckseltilece\u011finin belirtildi\u011fi a\u00e7\u0131klamada, \u015firketin bir ba\u015fka \u00f6nemli projesi Kuzey Ak\u0131m 2\u2019ye ise 114,5 milyar ruble yat\u0131r\u0131m yap\u0131laca\u011f\u0131 bilgisine yer verildi.<\/p>\n<p>T\u00fcrk Ak\u0131m\u0131n\u2019dan T\u00fcrkiye\u2019ye gaz ak\u0131\u015f\u0131n\u0131n 2019 Aral\u0131k ay\u0131nda ba\u015flamas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. Boru hatt\u0131n\u0131n denizdeki kesimi Rusya\u2019n\u0131n Anapa kentinden T\u00fcrkiye\u2019nin K\u0131y\u0131k\u00f6y beldesine kadar Karadeniz boyunca yakla\u015f\u0131k 930 kilometre boyunca ilerliyor.<\/p>\n<p>Rusya D\u0131\u015fi\u015fleri Bakan\u0131 Sergey Lavrov, projede Avrupa pazar\u0131 i\u00e7in planlanan ikinci hatt\u0131n in\u015fa edilmesinin Avrupa Komisyonu\u2019ndan garanti gerektirdi\u011fini yineleyerek, \u201cProje \u015fu anda sadece T\u00fcrk pazar\u0131na y\u00f6nelik devam ediyor. Projenin, G\u00fcney Ak\u0131m projesinin ak\u0131betine u\u011framamas\u0131 i\u00e7in Avrupa\u2019dan y\u00fczde 100 garanti almam\u0131z laz\u0131m.\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Gazprom\u2019un, T\u00fcrk Ak\u0131m\u0131 do\u011falgaz boru hatt\u0131 projesine bu y\u0131lki yat\u0131r\u0131m miktar\u0131n\u0131, bir \u00f6nceki y\u0131la g\u00f6re y\u00fczde 89,6 art\u0131\u015fla 182,4 milyar rubleye y\u00fckseltece\u011fi bildirildi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47475,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[1128,19761,23219,67,1009,1277,20076],"views":627,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70854"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70854"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70854\/revisions"}],"predecessor-version":[{"id":70855,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70854\/revisions\/70855"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47475"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}