{"id":70734,"date":"2018-01-12T10:34:44","date_gmt":"2018-01-12T07:34:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70734"},"modified":"2018-01-12T10:38:18","modified_gmt":"2018-01-12T07:38:18","slug":"burdurun-gesleri-cw-enerjiden","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/burdurun-gesleri-cw-enerjiden\/","title":{"rendered":"(Turkish) &#8221;Burdur\u2019un GES\u2019leri CW Enerji\u2019den&#8230;&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70734\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>CW Enerji, Burdur ili Bucak il\u00e7esinde bir so\u011fuk hava deposunun \u00e7at\u0131s\u0131na 02.10.2013 tarihli 28783 say\u0131l\u0131 Elektrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fine uygun olarak 549,12 kWp g\u00fcc\u00fcnde \u00e7at\u0131 tipi GES kurulumu ger\u00e7ekle\u015ftirdi.<\/strong><\/p>\n<p>G\u00fcne\u015f enerjisi santralinde \u00fcretimi CW Enerji taraf\u0131ndan ger\u00e7ekle\u015ftirilen CW ENERJ\u0130\/CWT260-60P marka modelli 2112 adet g\u00fcne\u015f enerji paneli ve KOSTAL taraf\u0131ndan \u00fcretilen KOSTAL, (27) PIKO 20\/ (1\u00a0 <img loading=\"lazy\" class=\"alignright size-medium wp-image-70735\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/burdurun-gesleri-cw-enerjiden-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/burdurun-gesleri-cw-enerjiden-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/burdurun-gesleri-cw-enerjiden-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/burdurun-gesleri-cw-enerjiden-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/burdurun-gesleri-cw-enerjiden.jpg 684w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>) PIKO 10 marka modelli 28 adet invert\u00f6r kullan\u0131ld\u0131. 19 Eyl\u00fcl 2017 tarihinde anahtar teslimi, 24 Kas\u0131m 2017 tarihinde ise ge\u00e7ici kabul\u00fc yap\u0131lan GES projesinde CW Enerji, y\u00fcklenici firma olarak hem m\u00fchendislik, hem de EPC(uygulama) ger\u00e7ekle\u015ftirerek 23 g\u00fcnde \u00e7at\u0131 GES projesini tamamlam\u0131\u015ft\u0131r. Panel, y\u00fcklenici firma, m\u00fchendislik, EPC(Uygulama), CW Enerji taraf\u0131ndan yap\u0131lm\u0131\u015ft\u0131r. Yat\u0131r\u0131mc\u0131n\u0131n arazisine yapt\u0131rm\u0131\u015f oldu\u011fu g\u00fcne\u015f enerjisi santrallinin ortalama 6 y\u0131l i\u00e7erisinde kendisini amorti etmesi \u00f6ng\u00f6r\u00fcl\u00fcrken, g\u00fcne\u015f enerjisi santralinde \u00fcretilen elektrik enerjisinden her bir ihtiya\u00e7 fazlas\u0131 kW i\u00e7in 13,3$\/cent elde edilebilecek.<\/p>\n<p>549,12 kWp g\u00fcc\u00fcndeki bir g\u00fcne\u015f enerjisi santralinde g\u00fcnde ortalama 2.475 kWp, santralin tam kapasitesi ile y\u0131lda ortalama 903.375 kWp\/y\u0131l elektrik enerjisi \u00fcretilmesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>549,12 KWp GES kurulumu ile y\u0131lda ortalama 438 hanenin elektri\u011fi yenilenebilir enerji ile kar\u015f\u0131lanabilmekte ve \u00fcretilen elektrik ile birlikte y\u0131lda ortalama 628 ton CO2, 1,75 ton SO2 ve 0,65 ton NOx gaz\u0131 emisyonu azalt\u0131labilmektedir.<\/p>\n<p>Antalya Organize Sanayi B\u00f6lgesi\u2019nde faaliyet g\u00f6steren CW Enerji\u2019nin Y\u00f6netim Kurulu Ba\u015fkan\u0131 Tar\u0131k Sarvan, \u201c\u00dclkemizi g\u00fcne\u015f enerjisi ile bulu\u015fturmaktan mutluluk duyuyoruz. Burdur ili Bucak il\u00e7esinde bulunan bir so\u011fuk hava deposunun daha \u00e7at\u0131s\u0131n\u0131 g\u00fcne\u015f enerjisi sistemleri ile bulu\u015fturduk. Her santralimizde oldu\u011fu gibi CW Enerji olarak, titiz ve m\u00fckemmeliyet\u00e7i \u00e7al\u0131\u015fma anlay\u0131\u015f\u0131m\u0131zla projemizi h\u0131zla tamamlad\u0131k. \u00c7evre dostu, temiz enerji kayna\u011f\u0131 g\u00fcne\u015f gibi s\u0131n\u0131rs\u0131z ve \u00fccretsiz olan bir kaynaktan sonuna kadar faydalan\u0131lmal\u0131. \u00dclke olarak g\u00fcne\u015f enerjisi potansiyelimiz toplam elektrik enerjisi ihtiyac\u0131m\u0131z\u0131n tamam\u0131ndan kat ve kat daha fazlas\u0131n\u0131 tek ba\u015f\u0131na kar\u015f\u0131layabilecek kadar b\u00fcy\u00fck. Biz de CW Enerji olarak yapt\u0131\u011f\u0131m\u0131z ciddi yat\u0131r\u0131m hamleleriyle Fotovoltaik sekt\u00f6r\u00fcn\u00fc T\u00fcrkiye\u2019de daha da yayg\u0131nla\u015ft\u0131rmak, bu potansiyeli ortaya \u00e7\u0131karmaya devam etmek istiyoruz\u201d diye konu\u015ftu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.CW Enerji, Burdur ili Bucak il\u00e7esinde bir so\u011fuk hava deposunun \u00e7at\u0131s\u0131na 02.10.2013 tarihli 28783 say\u0131l\u0131 Elektrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fine uygun olarak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70735,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[63,67,1009,165,2326,23416,2569,23131],"views":2112,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70734"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70734"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70734\/revisions"}],"predecessor-version":[{"id":70736,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70734\/revisions\/70736"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70735"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70734"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70734"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}