{"id":70631,"date":"2018-01-09T09:49:42","date_gmt":"2018-01-09T06:49:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70631"},"modified":"2018-01-09T09:49:42","modified_gmt":"2018-01-09T06:49:42","slug":"onat-enerjiden-ankaraya-3-mwlik-biyogaz-tesisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/onat-enerjiden-ankaraya-3-mwlik-biyogaz-tesisi\/","title":{"rendered":"(Turkish) Onat Enerji&#8217;den Ankara\u2019ya 3 MW\u2019l\u0131k Biyogaz Tesisi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70631\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Onat Enerji Yat\u0131r\u0131m A.\u015e., Ankara \u0130li, Akyurt \u0130l\u00e7esi, \u00c7ardakba\u011f\u0131 Mahallesi, K\u0131z\u0131lcap\u0131nar Mevkiinde, 51,171.47 m2 y\u00fcz\u00f6l\u00e7\u00fcml\u00fc maliye arazisi \u00fczerinde \u201cBiyogaz, Kompost\u00a0<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-4959 alignright\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/biyogaz-tesisi-300x224.jpg\" alt=\"\" width=\"300\" height=\"224\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/biyogaz-tesisi-300x224.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/biyogaz-tesisi-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/biyogaz-tesisi.jpg 467w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><strong>ve Organik G\u00fcbre Tesisi (3 MWe)\u201d kuracakt\u0131r.<\/strong><\/p>\n<p>36.971.370 TL bedelli Biyogaz tesisinde (3 MWe) b\u00f6lgedeki hayvanc\u0131l\u0131k tesislerinden kaynakl\u0131 hayvansal d\u0131\u015fk\u0131 at\u0131klar\u0131 ve \u00e7iftliklerde ortaya \u00e7\u0131kacak organik at\u0131klar kullan\u0131lacak. \u00dcretilen elektrik, orta gerilim hatt\u0131na verilerek enterkonnekte a\u011fa ula\u015ft\u0131r\u0131lacak.<\/p>\n<p><strong>HALK PROJEYLE \u0130LG\u0130L\u0130 B\u0130LG\u0130LEND\u0130R\u0130LECEK<\/strong><\/p>\n<p>Onat Enerji, proje hakk\u0131nda haz\u0131rlanan \u00c7evresel Etki De\u011ferlendirme raporu hakk\u0131nda halk\u0131 bilgilendirmek, g\u00f6r\u00fc\u015f ve \u00f6nerilerini almak i\u00e7in 16 Ocak 2018 tarihinde Halk\u0131n Kat\u0131l\u0131m Toplant\u0131s\u0131 yapacaklar\u0131n\u0131 duyurdu. Toplant\u0131, Ankara Akyurt\u2019ta bulunan \u00c7ardakba\u011f\u0131 Mahallesi Cami Yan\u0131 K\u00f6y Odas\u0131\u2019nda ger\u00e7ekle\u015ftirilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Onat Enerji Yat\u0131r\u0131m A.\u015e., Ankara \u0130li, Akyurt \u0130l\u00e7esi, \u00c7ardakba\u011f\u0131 Mahallesi, K\u0131z\u0131lcap\u0131nar Mevkiinde, 51,171.47 m2 y\u00fcz\u00f6l\u00e7\u00fcml\u00fc maliye arazisi \u00fczerinde \u201cBiyogaz, Kompost\u00a0 ve Organik G\u00fcbre [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4959,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[36501,2674,35143,641,29816,35325,2878,68,67,1009,36500],"views":2745,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70631"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70631"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70631\/revisions"}],"predecessor-version":[{"id":70632,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70631\/revisions\/70632"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/4959"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}