{"id":70600,"date":"2018-01-08T19:48:43","date_gmt":"2018-01-08T16:48:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70600"},"modified":"2018-01-08T21:11:42","modified_gmt":"2018-01-08T18:11:42","slug":"manisanin-gesleri-cw-enerjiden","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/manisanin-gesleri-cw-enerjiden\/","title":{"rendered":"(Turkish) \u201cManisa&#8217;n\u0131n Ges\u2019leri Cw Enerji&#8217;den\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70600\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin Lider G\u00fcne\u015f Paneli \u00dcreticisi CW Enerji taraf\u0131ndan Manisa ili K\u0131rka\u011fa\u00e7 il\u00e7esinde yap\u0131lan <\/strong>4963,98 <strong>kWp g\u00fcc\u00fcnde arazi GES\u2019in ge\u00e7ici kabul\u00fc yap\u0131ld\u0131. <\/strong><\/p>\n<p><strong>G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn lider g\u00fcne\u015f paneli \u00fcreticisi CW Enerji taraf\u0131ndan <\/strong>4963,98 <strong>kWp g\u00fcc\u00fcnde Manisa ili K\u0131rka\u011fa\u00e7 il\u00e7esine kurulumu ger\u00e7ekle\u015ftirilen arazi tipi g\u00fcne\u015f enerjisi santralinin (GES) 18 Aral\u0131k 2017 tarihinde ge\u00e7ici kabul\u00fc yap\u0131ld\u0131. Projede panel, y\u00fcklenici firma, m\u00fchendislik, EPC(Uygulama), CW Enerji taraf\u0131ndan yap\u0131lm\u0131\u015ft\u0131r.<\/strong><\/p>\n<p>CW Enerji, Manisa ili K\u0131rka\u011fa\u00e7 il\u00e7esinde bir araziye 02.10.2013 tarihli 28783 say\u0131l\u0131 Elektrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fine uygun olarak 4963,98 kWp g\u00fcc\u00fcnde arazi tipi GES\u2019in kurulumunu ger\u00e7ekle\u015ftirdi. G\u00fcne\u015f Enerjisi Santralinde \u00fcretimi CW Enerji taraf\u0131ndan ger\u00e7ekle\u015ftirilen <img loading=\"lazy\" class=\"size-medium wp-image-70601 alignright\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/manisanin-gesleri-cw-enerjiden-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/manisanin-gesleri-cw-enerjiden-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/manisanin-gesleri-cw-enerjiden-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/manisanin-gesleri-cw-enerjiden-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/manisanin-gesleri-cw-enerjiden.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>CW ENERJ\u0130\/CWT265-60P marka modelli 18732 adet g\u00fcne\u015f enerji paneli ve HUAWEI taraf\u0131ndan \u00fcretilen HUAWEI SUN2000-KTL33 marka modelli 153 adet invert\u00f6r kullan\u0131ld\u0131. 03 Eyl\u00fcl 2017 tarihinde anahtar teslimi, 18 Aral\u0131k 2017 tarihinde ise ge\u00e7ici kabul\u00fc yap\u0131lan GES projesinde CW Enerji, y\u00fcklenici firma olarak hem m\u00fchendislik, hem de EPC(uygulama) ger\u00e7ekle\u015ftirerek 46 g\u00fcnde arazi GES projesini tamamlam\u0131\u015ft\u0131r. Panel, y\u00fcklenici firma, m\u00fchendislik, EPC(Uygulama), CW Enerji taraf\u0131ndan yap\u0131lm\u0131\u015ft\u0131r. Yat\u0131r\u0131mc\u0131n\u0131n arazisine yapt\u0131rm\u0131\u015f oldu\u011fu g\u00fcne\u015f enerjisi santrallinin ortalama 6 y\u0131l i\u00e7erisinde kendisini amorti etmesi \u00f6ng\u00f6r\u00fcl\u00fcrken, g\u00fcne\u015f enerjisi santralinde \u00fcretilen elektrik enerjisinden her bir ihtiya\u00e7 fazlas\u0131 kW i\u00e7in 13,3$\/cent elde edilebilecek.<\/p>\n<p>4963,98 kWp g\u00fcc\u00fcndeki bir g\u00fcne\u015f enerjisi santralinde g\u00fcnde ortalama 22.337,91 kWh,<\/p>\n<p>santralin tam kapasitesi ile y\u0131lda ortalama 8.153.337,15 kWh\/y\u0131l elektrik enerjisi \u00fcretilmesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>4963,98\u00a0 KWp GES kurulumu ile y\u0131lda ortalama 4,375 hanenin elektri\u011fi yenilenebilir enerji ile kar\u015f\u0131lanabilmekte ve \u00fcretilen elektrik ile birlikte y\u0131lda ortalama 5.815 ton CO2, 17,5 ton SO2 ve 6,5 ton NOx gaz\u0131 emisyonu azalt\u0131labilmektedir.<\/p>\n<p>Antalya Organize Sanayi B\u00f6lgesi\u2019nde faaliyet g\u00f6steren CW Enerji\u2019nin Y\u00f6netim Kurulu Ba\u015fkan\u0131 Tar\u0131k Sarvan, Manisa ili K\u0131rka\u011fa\u00e7 il\u00e7esi arazi GES projesinde titiz bir \u00e7al\u0131\u015fma s\u00fcrd\u00fcrd\u00fcklerini belirterek, \u201c\u00c7evre dostu, temiz enerji kayna\u011f\u0131 g\u00fcne\u015f gibi s\u0131n\u0131rs\u0131z ve \u00fccretsiz olan bir kaynaktan sonuna kadar faydalan\u0131lmal\u0131. \u00dclke olarak g\u00fcne\u015f enerjisi potansiyelimiz toplam elektrik enerjisi ihtiyac\u0131m\u0131z\u0131n tamam\u0131ndan kat ve kat daha fazlas\u0131n\u0131 tek ba\u015f\u0131na kar\u015f\u0131layabilecek kadar b\u00fcy\u00fck. Biz de CW Enerji olarak yapt\u0131\u011f\u0131m\u0131z ciddi yat\u0131r\u0131m hamleleriyle Fotovoltaik sekt\u00f6r\u00fcn\u00fc T\u00fcrkiye\u2019de daha da yayg\u0131nla\u015ft\u0131rmak, bu potansiyeli ortaya \u00e7\u0131karmaya devam etmek istiyoruz\u201d diye konu\u015ftu.<\/p>\n<p><strong>CW Enerji, T\u00fcrkiye\u2019nin yerli g\u00fcne\u015f paneli \u00fcreticisi ve Avrupa\u2019n\u0131n en b\u00fcy\u00fck g\u00fcne\u015f paneli \u00fcretim tesisi. Firma, 2018\u2019in ilk 4 ay\u0131 i\u00e7erisinde yeni yat\u0131r\u0131mlar\u0131 ile birlikte AOSB 1\u2019inci k\u0131s\u0131mdaki yeni fabrikalar\u0131nda 20 milyon dolarl\u0131k \u00fcretim yapmay\u0131 planl\u0131yor. 2018 y\u0131l\u0131 ba\u015f\u0131nda yapacaklar\u0131 ek yat\u0131r\u0131mlarla 920 MW\/y\u0131l kapasiteye ula\u015farak Ortado\u011fu\u2019nun en b\u00fcy\u00fck kapasitesine sahip g\u00fcne\u015f paneli \u00fcreticisi olarak \u00fcretim yapmay\u0131 hedefliyorlar. CW Enerji, mevcut fabrikalar\u0131yla birlikte Antalya\u2019da 60 bin metrekare alanla d\u00fcnya standartlar\u0131nda hizmet vermeyi ama\u00e7l\u0131yor. Bin ki\u015fiye sa\u011flad\u0131klar\u0131 istihdam\u0131 2 bin ki\u015fiye ta\u015f\u0131mak isteyen firma, yat\u0131r\u0131mlar\u0131n\u0131n y\u00fczde 50\u2019sini ihracata kanelize etmek istiyor. \u00d6zellikle Avrupa, ABD ve Afrika \u00fclkelerine ihracat yapan CW Enerji\u2019nin D\u00fcnya\u2019da patentini ald\u0131\u011f\u0131 \u00fcr\u00fcnlerinin e\u015f de\u011feri yok.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin Lider G\u00fcne\u015f Paneli \u00dcreticisi CW Enerji taraf\u0131ndan Manisa ili K\u0131rka\u011fa\u00e7 il\u00e7esinde yap\u0131lan 4963,98 kWp g\u00fcc\u00fcnde arazi GES\u2019in ge\u00e7ici kabul\u00fc yap\u0131ld\u0131. G\u00fcne\u015f enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70601,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[34868,67,1009,2326,2569,1657,36493,34869],"views":1232,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70600"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70600"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70600\/revisions"}],"predecessor-version":[{"id":70603,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70600\/revisions\/70603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70601"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}