{"id":70536,"date":"2018-01-06T13:24:38","date_gmt":"2018-01-06T10:24:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70536"},"modified":"2018-01-06T13:26:41","modified_gmt":"2018-01-06T10:26:41","slug":"kigi-baraji-faaliyete-gecerek-elektrik-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kigi-baraji-faaliyete-gecerek-elektrik-uretimine-basladi\/","title":{"rendered":"(Turkish) Ki\u011f\u0131 Baraj\u0131 Faaliyete Ge\u00e7erek Elektrik \u00dcretimine Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70536\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Orman ve Su \u0130\u015fleri Bakanl\u0131\u011f\u0131 Devlet Su \u0130\u015fleri (DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc Bing\u00f6l\u2019de in\u015fa edilen ve kendi s\u0131n\u0131f\u0131nda T\u00fcrkiye\u2019nin 4\u2019\u00fcnc\u00fc b\u00fcy\u00fck baraj\u0131 olan Ki\u011f\u0131 Baraj\u0131\u2019nda elektrik \u00fcretimine ba\u015flad\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-70537\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/kigi-baraji-faaliyete-gecerek-elektrik-uretimine-basladi-300x153.jpg\" alt=\"\" width=\"300\" height=\"153\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/kigi-baraji-faaliyete-gecerek-elektrik-uretimine-basladi-300x153.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/kigi-baraji-faaliyete-gecerek-elektrik-uretimine-basladi-500x254.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/kigi-baraji-faaliyete-gecerek-elektrik-uretimine-basladi-80x41.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/kigi-baraji-faaliyete-gecerek-elektrik-uretimine-basladi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Y\u0131ll\u0131k 450 milyon kilowatt\/saat enerji \u00fcretim kapasitesi bulunan enerji maksatl\u0131 in\u015fa edilen Ki\u011f\u0131 Baraj\u0131, 140 megawatt kurulu g\u00fcc\u00fcne sahip ve y\u0131lda 450 milyon kilowatt\/saat enerji \u00fcretim kapasiteye sahiptir. \u00dcretilen enerji ile 200 bin hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek olan baraj 2017 fiyatlar\u0131yla 2,4 milyar lira yat\u0131r\u0131m bedeli ile in\u015fa edildi.<\/p>\n<p>Ter\u00f6r \u00f6rg\u00fct\u00fcnce s\u0131k\u00e7a sald\u0131r\u0131ya u\u011fruyan Baraj\u0131n yap\u0131m\u0131na 1998&#8217;de ba\u015fland\u0131\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7izen Orman ve Su \u0130\u015fleri Bakan\u0131 Prof. Dr. Veysel Ero\u011flu ise \u201cY\u0131llard\u0131r hasretle beklenen bu baraj\u0131n yap\u0131m\u0131na h\u0131z verdik. Ter\u00f6r \u00f6rg\u00fct\u00fc taraf\u0131ndan da s\u0131k\u00e7a sald\u0131r\u0131ya u\u011frayan bu projemizi \u00e7al\u0131\u015fanlar\u0131m\u0131z\u0131n \u00f6zverisiyle bitirdik. Daha \u00f6nce su tutma i\u015flemini ger\u00e7ekle\u015ftirdi\u011fimiz bu baraj\u0131m\u0131zda \u015fimdi ise elektrik \u00fcretimine ba\u015flad\u0131k\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Orman ve Su \u0130\u015fleri Bakanl\u0131\u011f\u0131 Devlet Su \u0130\u015fleri (DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc Bing\u00f6l\u2019de in\u015fa edilen ve kendi s\u0131n\u0131f\u0131nda T\u00fcrkiye\u2019nin 4\u2019\u00fcnc\u00fc b\u00fcy\u00fck baraj\u0131 olan Ki\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70537,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1091,67,1009,1445,34926,26043,4639,26044,36473,28242,26829],"views":1165,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70536"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70536"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70536\/revisions"}],"predecessor-version":[{"id":70538,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70536\/revisions\/70538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70537"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}