{"id":70430,"date":"2017-12-31T20:54:20","date_gmt":"2017-12-31T17:54:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70430"},"modified":"2017-12-31T20:54:52","modified_gmt":"2017-12-31T17:54:52","slug":"kirsehire-4-8-mw-gucunde-biyokutle-santrali-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirsehire-4-8-mw-gucunde-biyokutle-santrali-kurulacak\/","title":{"rendered":"(Turkish) K\u0131r\u015fehir\u2019e 4.8 MW G\u00fcc\u00fcnde Biyok\u00fctle Santrali Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70430\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Anka Biyogaz Elektrik \u00dcretim A\u015e, K\u0131r\u015fehir\u2019in Merkez il\u00e7esine ba\u011fl\u0131 Boztepe ve K\u00f6rp\u0131nar <img loading=\"lazy\" class=\"alignleft size-medium wp-image-11529\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-300x181.jpg\" alt=\"\" width=\"300\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>k\u00f6y s\u0131n\u0131rlar\u0131 i\u00e7inde bulunan toplam 80 bin metrekarelik bir alanda biyogaz tesisi kurmay\u0131 planl\u0131yor. Anka 1 Biyogaz Tesisi\u2019nin yat\u0131r\u0131m bedeli ise yakla\u015f\u0131k 35 milyon TL&#8217;dir.<\/strong><\/p>\n<p>Kurulumu yap\u0131lacak tesiste, b\u00f6lgede faaliyet g\u00f6sterecek hayvanc\u0131l\u0131k tesislerinden sa\u011flanacak g\u00fcnl\u00fck yakla\u015f\u0131k 700 ton besi s\u0131\u011f\u0131r\u0131 g\u00fcbresi, 30 ton tavuk g\u00fcbresi, 15 ton s\u0131laj ve 100 ton mezbaha at\u0131\u011f\u0131 girdi olarak kullan\u0131larak elde edilecek biyogaz ile 4.80 MWe kurulu g\u00fc\u00e7teki santralde elektrik sa\u011flanacak.<\/p>\n<p>Biyogaz \u00fcretimi sonras\u0131 kalan malzeme, organik g\u00fcbreye \u00e7evrilerek bu g\u00fcbrelerin kullan\u0131laca\u011f\u0131 10 bin metrekarelik bir sera kurulmas\u0131 da \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Anka Biyogaz Elektrik \u00dcretim A\u015e, K\u0131r\u015fehir\u2019in Merkez il\u00e7esine ba\u011fl\u0131 Boztepe ve K\u00f6rp\u0131nar k\u00f6y s\u0131n\u0131rlar\u0131 i\u00e7inde bulunan toplam 80 bin metrekarelik bir alanda biyogaz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11529,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[36446,36445,640,35143,641,9471,1678,29816,67,1009,2192,26829],"views":2555,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70430"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70430"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70430\/revisions"}],"predecessor-version":[{"id":70431,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70430\/revisions\/70431"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/11529"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}