{"id":70403,"date":"2017-12-31T14:40:17","date_gmt":"2017-12-31T11:40:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70403"},"modified":"2017-12-31T14:40:17","modified_gmt":"2017-12-31T11:40:17","slug":"star-rafinerinin-yer-ustu-boru-hatti-tesisatinin-yuzde-98i-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/star-rafinerinin-yer-ustu-boru-hatti-tesisatinin-yuzde-98i-tamamlandi\/","title":{"rendered":"(Turkish) Star Rafineri\u2019nin Yer \u00dcst\u00fc Boru Hatt\u0131 Tesisat\u0131n\u0131n Y\u00fczde 98\u2019i Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70403\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Azerbaycan devlet petrol \u015firketi SOCAR taraf\u0131ndan \u0130zmir\u2019in Alia\u011fa yar\u0131madas\u0131nda in\u015fas\u0131 devam eden \u201cStar Rafineri\u201d yer \u00fcst\u00fc boru hatt\u0131 tesisat\u0131n\u0131n y\u00fczde 98 oran\u0131nda <img loading=\"lazy\" class=\"alignleft size-medium wp-image-70404\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/star-rafinerinin-yer-ustu-boru-hatti-tesisatinin-yuzde-98i-tamamlandi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/star-rafinerinin-yer-ustu-boru-hatti-tesisatinin-yuzde-98i-tamamlandi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/star-rafinerinin-yer-ustu-boru-hatti-tesisatinin-yuzde-98i-tamamlandi-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/star-rafinerinin-yer-ustu-boru-hatti-tesisatinin-yuzde-98i-tamamlandi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/star-rafinerinin-yer-ustu-boru-hatti-tesisatinin-yuzde-98i-tamamlandi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>tamamland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131. Yap\u0131lan a\u00e7\u0131klamada, borular\u0131n toplam a\u011f\u0131rl\u0131\u011f\u0131n\u0131n 55 bin ton oldu\u011fu, bu nedenle in\u015fa s\u00fcrecinde dev vin\u00e7lerin kullan\u0131ld\u0131\u011f\u0131 dile getirildi.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin ilk \u00f6zel petrol rafinerisi olan Star Rafineri\u2019nin toplam maliyeti 6 milyar dolar civar\u0131nda bulunuyor. Y\u0131lda 10 milyon ton petrol\u00fcn i\u015flenebilece\u011fi tesisin, 1.6 milyon metrek\u00fcp depolama hacmi oldu\u011fu belirtilmektedir.<\/p>\n<p>Yine rafineride y\u0131lda, 1.6 milyon ton nafta (petrol t\u00fcrevi bir yak\u0131t), 5 milyon ton dizel yak\u0131t, 1.6 milyon ton jet yak\u0131t\u0131, 300 bin ton s\u0131v\u0131la\u015ft\u0131r\u0131lm\u0131\u015f petrol gaz\u0131 ve petrokimya end\u00fcstrisinde kullan\u0131lmak \u00fczere 1 milyon ton ham materyal \u00fcretilece\u011fi de a\u00e7\u0131kland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Azerbaycan devlet petrol \u015firketi SOCAR taraf\u0131ndan \u0130zmir\u2019in Alia\u011fa yar\u0131madas\u0131nda in\u015fas\u0131 devam eden \u201cStar Rafineri\u201d yer \u00fcst\u00fc boru hatt\u0131 tesisat\u0131n\u0131n y\u00fczde 98 oran\u0131nda tamamland\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70404,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,44],"tags":[36432,29220,67,1009,3287,1853,36433,769,5462,36431],"views":875,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70403"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70403"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70403\/revisions"}],"predecessor-version":[{"id":70405,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70403\/revisions\/70405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70404"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}