{"id":70397,"date":"2017-12-30T16:41:16","date_gmt":"2017-12-30T13:41:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70397"},"modified":"2017-12-30T16:41:47","modified_gmt":"2017-12-30T13:41:47","slug":"ruzgar-yarismasi-sonuclandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgar-yarismasi-sonuclandi\/","title":{"rendered":"(Turkish) R\u00fczgar Yar\u0131\u015fmas\u0131 Sonu\u00e7land\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70397\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>D\u00f6rt g\u00fcn boyunca Ankara Holiday Inn otel\u2019de s\u00fcren r\u00fczgar yar\u0131\u015fmalar\u0131 sonu\u00e7land\u0131. K\u0131ran k\u0131rana ge\u00e7en ihalede d\u00f6rt g\u00fcn i\u00e7inde 685 proje i\u00e7in 409 teklif verildi. 2 bin 130 MW\u2019l\u0131k kapasitenin 2 bin 110 MW\u2019l\u0131k k\u0131sm\u0131 tahsis edildi. B\u00f6ylece 32 farkl\u0131 b\u00f6lgede 76 projeye kapasite tahsis edilmi\u015f oldu.<\/strong><\/p>\n<p>D\u00f6rt g\u00fcn boyunca en y\u00fcksek teklif Ardahan b\u00f6lgesi i\u00e7in Ceres Elektrik\u2019ten (7,29$\/kWh) geldi. En d\u00fc\u015f\u00fck teklif ise PNE Wind Ltd. \u015eti\u2019nden (-2,87$\/kWh) ile \u00c7anakkale b\u00f6lgesi i\u00e7in verildi.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignleft wp-image-50070 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak-300x215.jpg\" alt=\"ruzgar-yarismasi-sonuclandi\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>Bug\u00fcnk\u00fc yar\u0131\u015fmada 740 MW\u2019l\u0131k kapasite i\u00e7in 201 teklif dosyas\u0131 teslim edilirken, \u00f6zellikle \u00c7anakkale b\u00f6lgesinde yo\u011fun bir talep ya\u015fand\u0131. \u00c7anakkale b\u00f6lgesi dokuz firma aras\u0131nda payla\u015f\u0131ld\u0131.<\/p>\n<p>B\u00f6lgelere g\u00f6re bug\u00fcn ihale kazanan firmalar \u015funlar:<\/p>\n<p><strong>Afyonkarahisar \u00a0(30 MW) <\/strong>b\u00f6lgesi i\u00e7in onbir proje ba\u015fvurusunun dokuzu teklif sundu. Polat Enerji A.\u015e.\u2019nin Karahisar RES projesi (-1,89$\/kWh) 23,4 MW, Hatmi Yenilenebilir A.\u015e.\u2019nin Hatmi RES projesi (-1,25$\/kWh) fiyat ile 6,6 MW\u2019l\u0131k kapasite ald\u0131.<\/p>\n<p><strong>Isparta (60MW)<\/strong> b\u00f6lgesi i\u00e7in ondokuz proje ba\u015fvurusundan dokuz firma teklif sundu. \u015eule Enerji A.\u015e.\u2019nin \u015eule RES projesi (-1,69$\/kWh) ile kapasitenin tamam\u0131n\u0131 ald\u0131.<\/p>\n<p><strong>Burdur-Denizli-U\u015fak (50 MW) <\/strong>i\u00e7in yirmi proje ba\u015fvurusundan dokuz proje teklif verdi. Bu b\u00f6lge i\u00e7in en d\u00fc\u015f\u00fck teklifi veren Bat\u0131res A.\u015e.\u2019nin Bat\u0131res projesi (-1,49$\/kWh) ile 47 MW\u2019l\u0131k kapasite ald\u0131. Alternatif Res A.\u015e.\u2019nin G\u00fcnalan projesi (-0,69$\/kWh) ile 3 MW\u2019l\u0131k kapasite ald\u0131.<\/p>\n<p><strong>Ayd\u0131n-Mu\u011fla (50MW)<\/strong> Bu b\u00f6lgeye ba\u015fvuru yapan otuzbir firmadan onalt\u0131s\u0131 teklif sundu. Lodos Yenilenebilir A.\u015e.\u2019nin Lodos RES projesi (-2,23$\/kWh) 49,5 MW\u2019l\u0131k kapasite ald\u0131. Ekores Enerji A.\u015e.\u2019nin Bodrum1 RES projesi (-2,02$\/kWh) ile 0,5 MW\u2019l\u0131k kapasite ald\u0131.<\/p>\n<p><strong>Konya (50 MW)<\/strong> b\u00f6lgesi i\u00e7in yap\u0131lan onsekiz proje ba\u015fvurusundan sekizi teklif sundu. \u0130dilres A.\u015e.\u2019nin \u0130dilRES projesi (-1,19$\/kWh) ile 30 MW kapasite al\u0131rken, Res Anatolia A.\u015e.\u2019nin \u0130mrenler RES projesi (-0,56$\/kWh) ile 20 MW\u2019l\u0131k kapasite ald\u0131.<\/p>\n<p><strong>\u0130zmir (50 MW)<\/strong> i\u00e7in ba\u015fvuruda bulunan otuzyedi firmadan yirmi\u00fc\u00e7\u00fc teklif sundu. Polat Enerji A.\u015e.\u2019nin Sar\u0131caRES projesi (-2,51$\/kWh) fiyat ile kapasitenin tamam\u0131n\u0131 ald\u0131.<\/p>\n<p><strong>Bal\u0131kesir (160MW) <\/strong>b\u00f6lgesi i\u00e7in doksand\u00f6rt proje ba\u015fvurusundan ellid\u00f6rt proje teklif sundu. Sar\u0131 Kanat Enerji A.\u015e.\u2019nin Balya RES projesi (-2,57$\/kWh) ile 9,9 MW\u2019l\u0131k kapasite al\u0131rken, Polat Enerji A.\u015e.\u2019nin Duygu RES projesi \u00a0(-2,51$\/kWh) 150,1 MW\u2019l\u0131k kapasite ald\u0131.<\/p>\n<p><strong>\u00c7anakkale (260MW) <\/strong>i\u00e7in doksandokuz proje ba\u015fvurusundan ellidokuz firma teklif sundu. Toplam kapasite dokuz firma aras\u0131nda payla\u015f\u0131ld\u0131. Bug\u00fcnk\u00fc ihalenin en d\u00fc\u015f\u00fck teklifini sunan PNE Wind Ltd. \u015eti.\u2019nin K\u00f6seler RES projesi (-2,87$\/kWh) ile 71,4 MW\u2019l\u0131k kapasite ald\u0131. Kalan kapasiteyi Polat Enerji A.\u015e.\u2019nin \u00c7\u0131nar RES projesi (-2,42$\/kWh) ile 99,9MW, Selin5 Enerji A.\u015e.\u2019nin Selin5 RES projesi( -2,81$\/kWh) ile 10 MW, Selin4 Enerji A.\u015e.\u2019nin Selin4 RES projesi (-2,71$\/kWh) ile 10 MW, Selin3 Enerji A.\u015e.\u2019nin Selin3 RES projesi (-2,70$\/kWh) ile 10 MW, Yak\u0131n Yenilenebilir Ltd. \u015eti.\u2019nin Ay\u00e7a RES projesi (-2,11$\/kWh) ile 40 MW, Merkom Enerji A.\u015e.\u2019nin Yel De\u011firmeni RES projesi (-2,35$\/kWh) ile 5MW, Balay Enerji A.\u015e.\u2019nin G\u00f6nen RES projesi (-2,10$\/kWh) fiyat ile 9,9 MW, KeremRES Elektrik A.\u015e.\u2019nin Kerem RES projesi (-2,09$\/kWh) fiyat ile 3,8 MW\u2019l\u0131k kapasiteyi payla\u015ft\u0131.<\/p>\n<p><strong>Manisa (30MW) <\/strong>i\u00e7in yirmi\u00fc\u00e7 proje ba\u015fvurusundan ond\u00f6rt firma teklif sundu. D\u00fczce R\u00fczgar Yenilenebilir A.\u015e.\u2019nin D\u00fczce RES projesi (-2,02$\/kWh) ile kapasitenin tamam\u0131n\u0131 ald\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.D\u00f6rt g\u00fcn boyunca Ankara Holiday Inn otel\u2019de s\u00fcren r\u00fczgar yar\u0131\u015fmalar\u0131 sonu\u00e7land\u0131. K\u0131ran k\u0131rana ge\u00e7en ihalede d\u00f6rt g\u00fcn i\u00e7inde 685 proje i\u00e7in 409 teklif [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50070,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[67,1009,474,35002,36427,24949,36410,34706,25578],"views":1216,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70397"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70397"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70397\/revisions"}],"predecessor-version":[{"id":70399,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70397\/revisions\/70399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50070"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}