{"id":70345,"date":"2017-12-26T22:57:54","date_gmt":"2017-12-26T19:57:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70345"},"modified":"2017-12-26T22:59:26","modified_gmt":"2017-12-26T19:59:26","slug":"ruzgar-yarismalarinin-ikinci-gununde-20-mwlik-kapasite-acikta-kaldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgar-yarismalarinin-ikinci-gununde-20-mwlik-kapasite-acikta-kaldi\/","title":{"rendered":"(Turkish) R\u00fczgar Yar\u0131\u015fmalar\u0131n\u0131n \u0130kinci G\u00fcn\u00fcnde 20 MW\u2019l\u0131k Kapasite A\u00e7\u0131kta Kald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70345\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>D\u00fcn ba\u015flayan r\u00fczgar \u00f6nlisans ihalesinin ikinci g\u00fcn\u00fcnde toplam 370 MW\u2019l\u0131k kapasite i\u00e7in 3.190 MW\u2019l\u0131k ba\u015fvuru oldu. Ardahan-Kars b\u00f6lgesinde ba\u015fvuru olmamas\u0131 nedeni ile 20 MW\u2019l\u0131k kapasite, a\u00e7\u0131kta kal\u0131rken, Malatya, Kahramanmara\u015f-Osmaniye ve Yozgat b\u00f6lgelerine yo\u011fun talep oldu. \u0130kinci g\u00fcn i\u00e7inde sekiz b\u00f6lgede yap\u0131lan yar\u0131\u015fmalar\u0131n toplam yat\u0131r\u0131m bedeli yakla\u015f\u0131k 500 milyon dolar civar\u0131nda.<\/strong><\/p>\n<p>Bug\u00fcnk\u00fc yar\u0131\u015fmada b\u00f6lgelere g\u00f6re ihale kazanan firmalar \u015funlar:<\/p>\n<p><strong>Ad\u0131yaman (40 MW)<\/strong> i\u00e7in dokuz proje ba\u015fvuruda bulunurken, ihalede alt\u0131 proje teklif sundu. Errol Enerji \u00dcretimi Sanayi ve Ticaret Anonim \u015eirketi\u2019nin Ar\u0131konak RES projesi (-1,40$\/kWh) fiyat\u0131 ile 20 MW\u2019l\u0131k, \u00d6zg\u00fcl Lilyum Yenilenebilir Enerji Ve Elektrik \u00dcretim Anonim \u015eirketi\u2019nin Lilyum RES projesi <img loading=\"lazy\" class=\"alignright wp-image-45011 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/yaresden-bursaya-50-mwlik-res-300x144.jpg\" alt=\"ruzgar-yarismalarinin-ikinci-gununde-20-mwlik-kapasite-acikta-kaldi\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/yaresden-bursaya-50-mwlik-res-300x144.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/yaresden-bursaya-50-mwlik-res-500x241.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/yaresden-bursaya-50-mwlik-res-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/yaresden-bursaya-50-mwlik-res.jpg 564w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>(-0.77$\/kWh) fiyat\u0131 ile 20 MW\u2019l\u0131k kapasiteyi kazand\u0131.<\/p>\n<p><strong>Ardahan-Kars (40MW)<\/strong> b\u00f6lgesi i\u00e7in iki proje ba\u015fvurusundan sadece bir tanesi teklif sundu. Ceren Elektrik \u00dcretim A.\u015e.\u2019nin G\u00fcm\u00fc\u015ftepe RES projesi (7,29$\/kWh) fiyat\u0131 ile 20 MW\u2019l\u0131k kapasite tahsisi ald\u0131. Kalan 20 MW\u2019l\u0131k kapasite a\u00e7\u0131kta kald\u0131.<\/p>\n<p><strong>Erzincan (50 MW) <\/strong>i\u00e7in alt\u0131 proje ba\u015fvuruda bulundu. D\u00f6rt proje teklif sundu. Teklif sunan projelerden Arapgir Elektrik Enerjisi \u00dcretimi Anonim \u015eirketi\u2019nin Arapgir RES projesi (-1,33$\/kWh) fiyat ile 48 MW\u2019l\u0131k, Beng\u00fc Enerji \u00dcretim Sanayi Ve Ticaret Anonim \u015eirketi\u2019nin Beng\u00fcRES projesi (6,20$\/kWh) fiyat ile 2 MW\u2019l\u0131k kapasite tahsisi ald\u0131.<\/p>\n<p><strong>Malatya (80MW)<\/strong> Bu b\u00f6lgeye ba\u015fvuru yapan yirmi firmadan onbir tanesi teklif sundu. Tunna Enerji \u00dcretim Sanayi Ve Ticaret Anonim \u015eirketi\u2019nin G\u00fcl\u00fcmu\u015fa\u011f\u0131 RES projesi (-1,81$\/kWh) fiyat ile 30 MW\u2019l\u0131k, Sandal Yenilenebilir Enerji Ve Elektrik \u00dcretim Anonim \u015eirketi\u2019nin Sandal RES projesi (-1,22$\/kWh) fiyat ile 50 MW\u2019l\u0131k kapasite tahsisi ald\u0131.<\/p>\n<p><strong>Hatay (30 MW)<\/strong> b\u00f6lgesi i\u00e7in yap\u0131lan on proje ba\u015fvurusundan yedisi teklif sundu. B\u00f6\u011f\u00fcrtlen Yenilenebilir Enerji Ve Elektrik \u00dcretim Anonim \u015eirketi\u2019nin B\u00f6\u011f\u00fcrtlen RES projesi (-1,83$\/kWh) fiyat ile 30 MW\u2019l\u0131k kapasitenin tamam\u0131n\u0131 ald\u0131.<\/p>\n<p><strong>Kahramanmara\u015f-Osmaniye (40 MW)<\/strong> b\u00f6lgesi i\u00e7in yirmidokuz firma ba\u015fvuruda bulundu. Teklif sunan onbir proje aras\u0131ndan G\u00fcney Res Enerji Yat\u0131r\u0131m \u00dcretim Ve Ticaret Anonim \u015eirketi\u2019nin Tan\u0131r RES projesi (-0,90$\/kWh) fiyat ile 20 MW\u2019l\u0131k, Ak Jeo Enerji \u00dcretim Sanayi Ve Ticaret Anonim \u015eirketi\u2019nin pW-TR1002 RES projesi (-0,60$\/kWh) fiyat ile 20MW\u2019l\u0131k kapasite alarak Kahramanmara\u015f-Osmaniye b\u00f6lgesini payla\u015fm\u0131\u015f oldular.<\/p>\n<p><strong>Kocaeli-Yalova (40MW) <\/strong>b\u00f6lgesi i\u00e7in dokuz proje bavurusundan alt\u0131 proje teklif sundu. En d\u00fc\u015f\u00fck fiyat\u0131 veren Karanfil Yenilenebilir Enerji Ve Elektrik \u00dcretim Anonim \u015eirketi\u2019nin Karanfil RES projesi (-1,41$\/kWh) ile kapasitenin tamam\u0131n\u0131 alm\u0131\u015f oldu.<\/p>\n<p><strong>Yozgat (50 MW)<\/strong> i\u00e7in yirmi\u00fc\u00e7 proje bavuruda bulunurken, onbe\u015f firma teklif sundu. Teklif sunan projelerden Sandeks Enerji \u00dcretimi Sanayi ve Ticaret Anonim \u015eirketi\u2019nin Beyyurdu RES projesi (-1,58$\/kWh) ile 30 MW, Menek\u015fe Yenilenebilir Enerji Ve Elektrik \u00dcretim Anonim \u015eirketi\u2019nin Menek\u015fe RES projesi (-1,21$\/kWh) fiyat ile 20 MW\u2019l\u0131k kapasite tahsisi ald\u0131.<\/p>\n<p>Yar\u0131\u015fmalar\u0131n \u00fc\u00e7\u00fcnc\u00fc g\u00fcn\u00fcnde (yar\u0131n) 590 MW\u2019l\u0131k kapasite i\u00e7in teklifler al\u0131nacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.D\u00fcn ba\u015flayan r\u00fczgar \u00f6nlisans ihalesinin ikinci g\u00fcn\u00fcnde toplam 370 MW\u2019l\u0131k kapasite i\u00e7in 3.190 MW\u2019l\u0131k ba\u015fvuru oldu. Ardahan-Kars b\u00f6lgesinde ba\u015fvuru olmamas\u0131 nedeni ile 20 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":45011,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[67,1009,36411,24949,36412,34961,34960,36410],"views":1769,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70345"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70345"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70345\/revisions"}],"predecessor-version":[{"id":70348,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70345\/revisions\/70348"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/45011"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}