{"id":70336,"date":"2017-12-26T22:06:56","date_gmt":"2017-12-26T19:06:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70336"},"modified":"2017-12-26T22:06:56","modified_gmt":"2017-12-26T19:06:56","slug":"cw-enerji-10-wp-panel-seri-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cw-enerji-10-wp-panel-seri-uretimine-basladi\/","title":{"rendered":"(Turkish) \u201cCW Enerji 10 Wp Panel Seri \u00dcretimine Ba\u015flad\u0131\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70336\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>CW Enerji, 10 Wp g\u00fcc\u00fcnde k\u00fc\u00e7\u00fck panel \u00fcretiminde, seri \u00fcretime ge\u00e7ti.<\/strong><\/p>\n<p><strong>\u0130novatif \u00fcr\u00fcnlerine her ge\u00e7en g\u00fcn bir yenisini ekleyen T\u00fcrkiye\u2019nin Lider G\u00fcne\u015f Paneli \u00dcreticisi CW Enerji, k\u00fc\u00e7\u00fck g\u00fcne\u015f paneli \u00fcretiminde en \u00e7ok ilgi g\u00f6ren \u00fcr\u00fcnlerden biri olan 10 Wp g\u00fcne\u015f paneli \u00fcretiminde seri \u00fcretime ba\u015flad\u0131. CW Enerji, 5 W\u2019tan 165 W\u2019a kadar \u00e7\u0131kabilen k\u00fc\u00e7\u00fck panellerde sipari\u015f \u00fczerine \u00e7al\u0131\u015f\u0131rken, 260 Wp \u00fcst\u00fc b\u00fcy\u00fck panellerin seri \u00fcretimini yap\u0131yor.<\/strong><\/p>\n<p>Antalya Organize Sanayi B\u00f6lgesi\u2019nde hizmet veren CW Enerji, fotovoltaik teknoloji bazl\u0131 on\/off-grid g\u00fcne\u015f enerjisinden elektrik \u00fcretim sistemleri, bu sistemlerin anahtar teslim kurulumu, sisteme ait t\u00fcm <img loading=\"lazy\" class=\"alignleft size-medium wp-image-70337\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/cw-enerji-10-wp-panel-seri-uretimine-basladi-269x300.jpg\" alt=\"\" width=\"269\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/cw-enerji-10-wp-panel-seri-uretimine-basladi-269x300.jpg 269w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/cw-enerji-10-wp-panel-seri-uretimine-basladi-359x400.jpg 359w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/cw-enerji-10-wp-panel-seri-uretimine-basladi-45x50.jpg 45w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/cw-enerji-10-wp-panel-seri-uretimine-basladi.jpg 650w\" sizes=\"(max-width: 269px) 100vw, 269px\" \/>ana \u00fcr\u00fcnlerin toptan ve perakende sat\u0131\u015f\u0131, g\u00fcne\u015f enerjisi santrali(GES) m\u00fchendislik hizmetleri, GES finansman \u00e7\u00f6z\u00fcmleri ve g\u00fcne\u015f enerjisi santrallerinin temel \u00f6\u011fesi fotovoltaik g\u00fcne\u015f paneli \u00fcretimi yap\u0131yor. T\u00fcrkiye\u2019de A\u2019dan Z\u2019ye g\u00fcne\u015f enerji \u00fcretim sisteminin her \u00f6\u011fesini sunabilen tek firma olan <strong>CW Enerji, y\u0131ll\u0131k 420 MW\/ y\u0131l toplam kapasitesiyle bin ki\u015fiye istihdam sa\u011fl\u0131yor.<\/strong><\/p>\n<p>G\u00fcne\u015f enerjisinden elektrik \u00fcretimi \u00e7er\u00e7evesinde \u00e7al\u0131\u015fmalar ger\u00e7ekle\u015ftiren CW Enerji, varl\u0131\u011f\u0131n\u0131 sekt\u00f6r\u00fc tan\u0131tmaya ve yenilenebilir enerjinin T\u00fcrkiye genelinde kullan\u0131m\u0131n\u0131 yayg\u0131nla\u015ft\u0131rmaya adad\u0131.<\/p>\n<p>Ge\u00e7ti\u011fimiz g\u00fcnlerde 260 Wp ve \u00fczeri polikristal ve monokristal \u00f6zellikli g\u00fcne\u015f panellerinden olu\u015fan portf\u00f6ylerine 5 W\u2019tan 165 W\u2019a kadar \u00e7\u0131kabilen k\u00fc\u00e7\u00fck panelleri de ekleyen firma, en \u00e7ok tercih edilen 10 Wp g\u00fcc\u00fcnde k\u00fc\u00e7\u00fck panel \u00fcretiminin seri \u00fcretimine ba\u015flad\u0131.<\/p>\n<p>CW Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 Tar\u0131k Sarvan, daha \u00e7ok sinyalizasyon sinyalizasyon sistemleri, klorlama sistemleri, ba\u011f-bah\u00e7e evleri, \u00e7oban evleri, ar\u0131c\u0131lar, led armat\u00f6rler, yer ayd\u0131nlatma sistemleri i\u00e7in kullan\u0131lan 10 Wp panellerden 30 bin adet \u00fcretime girerek seri \u00fcretime ba\u015flad\u0131klar\u0131n\u0131 s\u00f6yledi. 30 bin adet 10 Wp k\u00fc\u00e7\u00fck panel \u00fcretiminin y\u00fczde 70\u2019ini i\u00e7 pazara satacaklar\u0131n\u0131 ifade eden Sarvan, y\u00fczde 30\u2019luk k\u0131sm\u0131 ise Avrupa, Afrika, Fas Tunus Kosova, \u0130ran \u00fclkelerine ihra\u00e7 etmeyi hedeflediklerini belirtti.<\/p>\n<p>K\u00fc\u00e7\u00fck panellerin \u00f6zel kesim h\u00fccre teknolojisi ile geli\u015ftirildi\u011fini aktaran Tar\u0131k Sarvan, \u015funlar\u0131 s\u00f6yledi:<br \/>\n\u201cBu \u00fcr\u00fcnler yine kendilerine has \u00f6zel bir \u00e7er\u00e7eve ve \u00f6zel bir junction box ile siz de\u011ferli m\u00fc\u015fterilerimize sunulmaktad\u0131r. -0%Wp ile +%3 Wp g\u00fc\u00e7 tolerans\u0131 sayesinde sat\u0131n ald\u0131\u011f\u0131n\u0131z mod\u00fcllerin etiket de\u011ferlerinde veya \u00fczerinde g\u00fc\u00e7 \u00e7\u0131k\u0131\u015f\u0131 sa\u011flamas\u0131 temin edilir ve genel sistem veriminin mod\u00fcl uyu\u015fmazl\u0131\u011f\u0131 nedeniyle d\u00fc\u015fmesi \u00f6nlenilmektedir. CW enerji g\u00fcne\u015f panelleri, ISO 9001:2015, ISO 14001:2015, OHSAS 18001:2007, ISO\/IEC 27001:2013, ISO 50001:2011, ISO 10002:2014, TSE, T\u00dcV S\u00dcD, T\u00dcV Rheinland standartlar\u0131nda ki fabrikam\u0131zda \u00fcretilmektedir. Mod\u00fcllerimiz sertifikasyon uygunlu\u011fu ve d\u00fczenleyici standartlar\u0131 do\u011fru olarak sa\u011flayabilmesi i\u00e7in ba\u011f\u0131ms\u0131z test kurulu\u015flar\u0131nca test edilmektedir. \u00d6zel \u00fcretim k\u00fc\u00e7\u00fck panellerimizde 5-10 y\u0131l aras\u0131nda limitli \u00fcr\u00fcn garantisi, yine t\u0131pk\u0131 b\u00fcy\u00fck g\u00fcne\u015f panellerinde ki art\u0131k b\u00fcy\u00fck diyoruz 260 Wp \u00fczerindeki g\u00fcne\u015f panellerine, g\u00f6re 25 y\u0131ll\u0131k performans garantisi ayn\u0131 \u015fekilde ge\u00e7erlidir. Mekanik \u00f6zelliklerine bak\u0131ld\u0131\u011f\u0131nda, \u00f6n kapakta 3,2 veya 4 mm\u2019lik d\u00fc\u015f\u00fck temperli cam kullan\u0131lmakta, anodize al\u00fcminyum ala\u015f\u0131ml\u0131 \u00e7er\u00e7eve ile y\u00fcksek dayan\u0131ma sahip, \u00f6zel bir \u00e7er\u00e7eve sunmaktay\u0131z. Ba\u011flant\u0131 kutusu yine b\u00fcy\u00fck panellerde oldu\u011fu gibi IP 65 \u00f6zellikli ve 6 diyotlu olmaktad\u0131r. Kablo ve konekt\u00f6rde g\u00fcncel en iyi markalarla \u00fcretime dahil edilmekte olup 4mm\u2019lik veya 6mm\u2019lik DC kablo ve MC4 uyumlu konekt\u00f6r kullan\u0131lmaktad\u0131r. S\u0131cakl\u0131k \u00f6zelliklerini de\u011ferlendirdi\u011fimizde b\u00fcy\u00fck panellerden hi\u00e7bir fark\u0131 yoktur ve kalite standartlar\u0131 bak\u0131m\u0131ndan 260 Wp \u00fczeri panellerle yar\u0131\u015f\u0131r durumda.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.CW Enerji, 10 Wp g\u00fcc\u00fcnde k\u00fc\u00e7\u00fck panel \u00fcretiminde, seri \u00fcretime ge\u00e7ti. \u0130novatif \u00fcr\u00fcnlerine her ge\u00e7en g\u00fcn bir yenisini ekleyen T\u00fcrkiye\u2019nin Lider G\u00fcne\u015f Paneli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70337,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[34868,67,1009,9615,23416,35910,23131,34869],"views":1809,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70336"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70336"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70336\/revisions"}],"predecessor-version":[{"id":70338,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70336\/revisions\/70338"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70337"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}