{"id":70289,"date":"2017-12-24T14:00:31","date_gmt":"2017-12-24T11:00:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70289"},"modified":"2017-12-24T14:01:00","modified_gmt":"2017-12-24T11:01:00","slug":"turkiyede-akkuyu-sinop-ve-trakya-olmak-uzere-3-nukleer-santral-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyede-akkuyu-sinop-ve-trakya-olmak-uzere-3-nukleer-santral-kurulacak\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;de Akkuyu, Sinop ve Trakya Olmak \u00dczere 3 N\u00fckleer Santral Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70289\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ankara Sanayi Odas\u0131 Koordinat\u00f6rl\u00fc\u011f\u00fc taraf\u0131ndan kurulan N\u00fckleer Sanayii K\u00fcmelenmesi (N\u00dcKSAK) a\u00e7\u0131l\u0131\u015f toplant\u0131s\u0131yla \u00e7al\u0131\u015fmalar\u0131na ba\u015fland\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-44092\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/euas-sinop-ngs-icin-jersey-adalarinda-sirket-kuruyor-300x165.jpg\" alt=\"\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/euas-sinop-ngs-icin-jersey-adalarinda-sirket-kuruyor-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/euas-sinop-ngs-icin-jersey-adalarinda-sirket-kuruyor-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/euas-sinop-ngs-icin-jersey-adalarinda-sirket-kuruyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/euas-sinop-ngs-icin-jersey-adalarinda-sirket-kuruyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Toplant\u0131n\u0131n a\u00e7\u0131l\u0131\u015f\u0131nda konu\u015fma yapan ASO Ba\u015fkan\u0131 Nurettin \u00d6zdebir, &#8220;Elektri\u011fe ba\u011f\u0131ml\u0131l\u0131\u011f\u0131m\u0131z\u0131n her ge\u00e7en g\u00fcn artt\u0131\u011f\u0131na dikkat \u00e7ekerek, en ekonomik elektrik \u00fcretiminin n\u00fckleer santrallerde ger\u00e7ekle\u015fti\u011finin vurgusunu yaparak enerji s\u00fcreklili\u011fi a\u00e7\u0131s\u0131ndan en \u00f6nemli santraller de n\u00fckleer santrallerdir. \u00c7\u00fcnk\u00fc n\u00fckleer santraller 7 g\u00fcn 24 saat 365 g\u00fcn \u00fcretim yapan tesislerdir. N\u00fckleer santrallerin yat\u0131r\u0131m maliyetleri y\u00fcksek olmaktad\u0131r. Oysa i\u015fletme maliyeti olarak bak\u0131ld\u0131\u011f\u0131nda en ucuz elektrik n\u00fckleer santrallerde \u00fcretilir&#8221; dedi.<\/p>\n<p>\u00d6zdebir ayr\u0131ca, &#8220;Akkuyu, Sinop ve Trakya olmak \u00fczere 3 n\u00fckleer santral kurulacakt\u0131r. Bu n\u00fckleer santrallerin maliyeti 60 milyar dolar civar\u0131ndad\u0131r. Bizlerin bu b\u00fcy\u00fck pazardan pay alabilmemiz m\u00fcmk\u00fcn g\u00f6r\u00fcn\u00fcyor.&#8221; ifadelerini de kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ankara Sanayi Odas\u0131 Koordinat\u00f6rl\u00fc\u011f\u00fc taraf\u0131ndan kurulan N\u00fckleer Sanayii K\u00fcmelenmesi (N\u00dcKSAK) a\u00e7\u0131l\u0131\u015f toplant\u0131s\u0131yla \u00e7al\u0131\u015fmalar\u0131na ba\u015fland\u0131. Toplant\u0131n\u0131n a\u00e7\u0131l\u0131\u015f\u0131nda konu\u015fma yapan ASO Ba\u015fkan\u0131 Nurettin \u00d6zdebir, &#8220;Elektri\u011fe [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44092,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1791,14650,36390,67,1009,117,21,23134,34931,88,34930,33958],"views":1657,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70289"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70289"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70289\/revisions"}],"predecessor-version":[{"id":70291,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70289\/revisions\/70291"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44092"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}