{"id":70263,"date":"2017-12-22T23:35:34","date_gmt":"2017-12-22T20:35:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70263"},"modified":"2017-12-22T23:35:34","modified_gmt":"2017-12-22T20:35:34","slug":"gunes-modulu-fabrikasi-ve-ar-ge-merkezinin-temeli-ankarada-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-modulu-fabrikasi-ve-ar-ge-merkezinin-temeli-ankarada-atildi\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Mod\u00fcl\u00fc Fabrikas\u0131 ve Ar-Ge Merkezinin Temeli Ankara&#8217;da At\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70263\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santralinin kurulaca\u011f\u0131 Konya-Karap\u0131nar ihalesini kazanm\u0131\u015f olan Kalyon-Hanwha Ortak Giri\u015fim Grubu, Ankara\u2019da G\u00fcne\u015f Mod\u00fcl\u00fc Fabrikas\u0131<img loading=\"lazy\" class=\"alignright size-medium wp-image-70264\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/gunes-modulu-fabrikasi-ve-ar-ge-merkezinin-temeli-ankarada-atildi-300x157.jpg\" alt=\"\" width=\"300\" height=\"157\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/gunes-modulu-fabrikasi-ve-ar-ge-merkezinin-temeli-ankarada-atildi-300x157.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/gunes-modulu-fabrikasi-ve-ar-ge-merkezinin-temeli-ankarada-atildi-500x262.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/gunes-modulu-fabrikasi-ve-ar-ge-merkezinin-temeli-ankarada-atildi-80x42.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/gunes-modulu-fabrikasi-ve-ar-ge-merkezinin-temeli-ankarada-atildi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> ve Ar-Ge Merkezi kuruyor.<\/strong><\/p>\n<p>500 milyon dolara mal olacak fabrikan\u0131n temeli d\u00fcn Ba\u015fbakan Binali Y\u0131ld\u0131r\u0131m\u2019\u0131n da kat\u0131ld\u0131\u011f\u0131 t\u00f6renle at\u0131ld\u0131. Fabrika Konya\u2019da 20 milyon metrekare alanda kurulacak g\u00fcne\u015f tarlas\u0131 i\u00e7in \u00fcretim ger\u00e7ekle\u015ftirecek.<\/p>\n<p>Ba\u015fbakan Y\u0131ld\u0131r\u0131m t\u00f6rende yapt\u0131\u011f\u0131 konu\u015fmada tesisin 12 ayda bitirilece\u011fini ve ilk \u00fcr\u00fcn\u00fcn hattan \u00e7\u0131kaca\u011f\u0131n\u0131 dile getirirken, Bakan Albayrak ise yat\u0131r\u0131m\u0131n bin ki\u015fiye i\u015f imkan\u0131 olu\u015fturaca\u011f\u0131n\u0131 da belirten Y\u0131ld\u0131r\u0131m, temeli at\u0131lacak fabrikan\u0131n ve burada \u00fcretilecek panellerin Konya Karap\u0131nar\u2019da 20 milyon metrekarelik alanda kurulacak bin megavatl\u0131k g\u00fcne\u015f enerji tarlas\u0131n\u0131n da bir ba\u015flang\u0131c\u0131 olaca\u011f\u0131n\u0131 belirtti. T\u00fcrkiye\u2019nin son 15 y\u0131lda kurulu g\u00fcc\u00fcn\u00fc 2.5 kat art\u0131rd\u0131\u011f\u0131na vurgu yapan Y\u0131ld\u0131r\u0131m, &#8220;85-86 bin megavata ula\u015ft\u0131k. Sadece art\u0131rmakla kalmad\u0131k ayn\u0131 zamanda \u00e7e\u015fitlendirmeyi de \u00f6nemli \u00f6l\u00e7\u00fcde yapt\u0131k&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santralinin kurulaca\u011f\u0131 Konya-Karap\u0131nar ihalesini kazanm\u0131\u015f olan Kalyon-Hanwha Ortak Giri\u015fim Grubu, Ankara\u2019da G\u00fcne\u015f Mod\u00fcl\u00fc Fabrikas\u0131 ve Ar-Ge Merkezi kuruyor. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70264,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[2674,14412,67,1009,13,23416,36377,142,23131,36378],"views":914,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70263"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70263"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70263\/revisions"}],"predecessor-version":[{"id":70265,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70263\/revisions\/70265"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70264"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}