{"id":70141,"date":"2017-12-19T11:37:06","date_gmt":"2017-12-19T08:37:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70141"},"modified":"2017-12-19T11:37:06","modified_gmt":"2017-12-19T08:37:06","slug":"petrol-ve-dogalgaza-verilen-destekler-jeotermale-de-saglanmali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/petrol-ve-dogalgaza-verilen-destekler-jeotermale-de-saglanmali\/","title":{"rendered":"(Turkish) \u201cPetrol ve Do\u011falgaza Verilen Destekler Jeotermale de Sa\u011flanmal\u0131\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70141\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Jeotermal Elektrik Santral Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi (JESDER) Y\u00f6netim Kurulu Ba\u015fkan Yard\u0131mc\u0131s\u0131 Mehmet \u015ei\u015fman taraf\u0131ndan halihaz\u0131rda 1000 MW\u2019\u0131 (Megawatt) a\u015fan jeotermale dayal\u0131 elektrik kapasitesinin 3 bin MW\u2019ye \u00e7\u0131kar\u0131larak T\u00fcrkiye\u2019yi d\u00fcnya lideri yapmay\u0131 hedefledikleri s\u00f6ylendi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-70142\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/petrol-ve-dogalgaza-verilen-destekler-jeotermale-de-saglanmali-300x166.jpg\" alt=\"\" width=\"300\" height=\"166\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/petrol-ve-dogalgaza-verilen-destekler-jeotermale-de-saglanmali-300x166.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/petrol-ve-dogalgaza-verilen-destekler-jeotermale-de-saglanmali-500x277.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/petrol-ve-dogalgaza-verilen-destekler-jeotermale-de-saglanmali-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/petrol-ve-dogalgaza-verilen-destekler-jeotermale-de-saglanmali.jpg 672w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>\u015ei\u015fman, bunu ba\u015farmak i\u00e7in 2020 sonras\u0131nda uygulanacak destek mekanizmas\u0131n\u0131n bug\u00fcnden a\u00e7\u0131klanmas\u0131na ihtiya\u00e7 oldu\u011funa vurgu yaparak, petrol ve do\u011falgaz yat\u0131r\u0131mlar\u0131na verilen \u00d6TV\u2019siz mazot, KDV ve \u00d6TV istisnas\u0131 gibi desteklerin kendilerine de verilmesi gerekti\u011fini belirtti.<\/p>\n<p>\u015ei\u015fman ayr\u0131ca, jeotermalde \u00f6n\u00fcm\u00fczdeki g\u00fcnlerde ilave edilecek yeni 33 MW ile kurulu g\u00fcc\u00fcn bin 87 MW\u2019a ula\u015faca\u011f\u0131n\u0131 dile getirdi. 2017&#8217;de 83 bin MW\u2019l\u0131k elektrik \u00fcretiminin y\u00fczde 1,2\u2019sini jeotermalden kar\u015f\u0131land\u0131\u011f\u0131n\u0131 belirten \u015ei\u015fman, b\u00f6ylece toplam 289 milyar kWh enerjinin 6 milyar kilovatsaatinin jeotermalden kar\u015f\u0131land\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Jeotermal Elektrik Santral Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi (JESDER) Y\u00f6netim Kurulu Ba\u015fkan Yard\u0131mc\u0131s\u0131 Mehmet \u015ei\u015fman taraf\u0131ndan halihaz\u0131rda 1000 MW\u2019\u0131 (Megawatt) a\u015fan jeotermale dayal\u0131 elektrik kapasitesinin 3 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70142,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53,48,44],"tags":[67,1009,29545,56,26929,36351,1114,8275],"views":1405,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70141"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70141"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70141\/revisions"}],"predecessor-version":[{"id":70143,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70141\/revisions\/70143"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70142"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}