{"id":70101,"date":"2017-12-17T18:18:03","date_gmt":"2017-12-17T15:18:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70101"},"modified":"2017-12-17T18:18:03","modified_gmt":"2017-12-17T15:18:03","slug":"erzuruma-6-mw-gucunde-gokce-hes-kurulumu-gerceklestirilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/erzuruma-6-mw-gucunde-gokce-hes-kurulumu-gerceklestirilecek\/","title":{"rendered":"(Turkish) Erzurum\u2019a 6 MW G\u00fcc\u00fcnde G\u00f6k\u00e7e HES Kurulumu Ger\u00e7ekle\u015ftirilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70101\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>AS-L\u0130DER Elektrik taraf\u0131ndan Erzurum\u2019un Horasan il\u00e7esi s\u0131n\u0131rlar\u0131nda 6,280 MW kurulu g\u00fcc\u00fcnde G\u00f6k\u00e7e Reg\u00fclat\u00f6r\u00fc ve HES kurulumu ger\u00e7ekle\u015ftirilecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-70102\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/erzuruma-6-mw-gucunde-gokce-hes-kurulumu-gerceklestirilecek-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/erzuruma-6-mw-gucunde-gokce-hes-kurulumu-gerceklestirilecek.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/erzuruma-6-mw-gucunde-gokce-hes-kurulumu-gerceklestirilecek-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>AS-L\u0130DER Elektrik \u00dcretim Tic. Ltd. \u015eti. taraf\u0131ndan Erzurum \u0130li, Horasan \u0130l\u00e7esi, G\u00f6k\u00e7e ve Ok\u00e7ular K\u00f6yleri s\u0131n\u0131rlar\u0131nda toplam kurulu g\u00fcc\u00fc 6,538 MWm \u2013 6,280 MWe olan G\u00f6k\u00e7e Reg\u00fclat\u00f6r\u00fc ve HES kurulup i\u015fletilecek.<\/p>\n<p>42.996.626 lira yat\u0131r\u0131m bedelli proje kapsam\u0131nda G\u00f6k\u00e7e Reg\u00fclat\u00f6r\u00fc, bal\u0131k ge\u00e7idi, \u00e7\u00f6keltim havuzu, iletim t\u00fcneli, y\u00fckleme havuzu, cebri boru, santral binas\u0131, \u015fantiye alanlar\u0131nda ve kaz\u0131 fazlas\u0131 malzeme depolama alan\u0131nda \u00e7al\u0131\u015fmalar yap\u0131lacak.<\/p>\n<p>Santral ile y\u0131ll\u0131k olarak 17,556 GWh enerji \u00fcretimi ger\u00e7ekle\u015ftirilmesi \u00f6ng\u00f6r\u00fclmektedir. Santral in\u015faat\u0131nda ayn\u0131 anda en fazla 50 ki\u015fiye istihdam sa\u011flan\u0131rken, i\u015fletme a\u015famas\u0131nda ise deneyimli 5 ki\u015fi yer alacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.AS-L\u0130DER Elektrik taraf\u0131ndan Erzurum\u2019un Horasan il\u00e7esi s\u0131n\u0131rlar\u0131nda 6,280 MW kurulu g\u00fcc\u00fcnde G\u00f6k\u00e7e Reg\u00fclat\u00f6r\u00fc ve HES kurulumu ger\u00e7ekle\u015ftirilecek. AS-L\u0130DER Elektrik \u00dcretim Tic. Ltd. \u015eti. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70102,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[36342,68,67,1009,7708,36341,26043,26044,26829],"views":1885,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70101"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70101"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70101\/revisions"}],"predecessor-version":[{"id":70103,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70101\/revisions\/70103"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70102"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}