{"id":70049,"date":"2017-12-15T22:08:49","date_gmt":"2017-12-15T19:08:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=70049"},"modified":"2017-12-15T22:10:50","modified_gmt":"2017-12-15T19:10:50","slug":"artvinin-coruh-nehrinde-kurulu-barajlardan-ekonomiye-5-milyar-lira-katki","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/artvinin-coruh-nehrinde-kurulu-barajlardan-ekonomiye-5-milyar-lira-katki\/","title":{"rendered":"(Turkish) Artvin\u2019in, \u00c7oruh Nehrindeki Barajlardan Ekonomiye 5 Milyar Lira Katk\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/70049\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Artvin\u2019de, \u00c7oruh Nehri \u00fczerinde yer alan Deriner, Bor\u00e7ka ve Muratl\u0131 barajlar\u0131ndan milli ekonomiye 5 milyar liral\u0131k dev katk\u0131 sa\u011flanmaktad\u0131r.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-70050 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/artvinnin-coruh-nehrinde-kurulu-barajlarla-ekonomiye-5-milyar-lira-katki-300x156.jpg\" alt=\"artvinnin-coruh-nehrinde-kurulu-barajlarla-ekonomiye-5-milyar-lira-katki\" width=\"300\" height=\"156\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/artvinnin-coruh-nehrinde-kurulu-barajlarla-ekonomiye-5-milyar-lira-katki-300x156.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/artvinnin-coruh-nehrinde-kurulu-barajlarla-ekonomiye-5-milyar-lira-katki-500x259.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/artvinnin-coruh-nehrinde-kurulu-barajlarla-ekonomiye-5-milyar-lira-katki-80x41.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/artvinnin-coruh-nehrinde-kurulu-barajlarla-ekonomiye-5-milyar-lira-katki.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>DS\u0130 Genel M\u00fcd\u00fcr\u00fc Murat Acu, Deriner\u2019in kurulu g\u00fcc\u00fcn\u00fcn 67 megavat, y\u0131ll\u0131k enerji \u00fcretiminin ise 2,11 milyar kilovatsaat oldu\u011funu belirterek \u201c\u00dcretilecek olan bu enerji T\u00fcrkiye\u2019de \u00fcretilen hidroelektrik<\/p>\n<p>enerjinin y\u00fczde 2,5\u2019ine, \u00c7oruh Havzas\u0131ndaki projelerde \u00fcretilecek toplam enerjinin ise y\u00fczde 14\u2019\u00fcne kar\u015f\u0131l\u0131k gelmektedir. Deriner Baraj\u0131\u2019nda 30 Kas\u0131m 2017 tarihine kadar toplam 6,6 milyar kilovatsaat enerji \u00fcretilmi\u015f olup, parasal olarak 1 milyar 517 milyon lira milli ekonomiye katk\u0131 sa\u011flam\u0131\u015ft\u0131r.\u201d dedi.<\/p>\n<p>Muratl\u0131 ve Bor\u00e7ka barajlar\u0131na da de\u011finen Acu, \u201cY\u0131ll\u0131k 444 milyon kilovatsaat enerji \u00fcretim kapasitesi olan Muratl\u0131 ile y\u0131ll\u0131k 1 milyar 39 milyon kilovatsaat enerji \u00fcretecek Bor\u00e7ka barajlar\u0131n\u0131 tamamlamak da bize nasip oldu. Bu iki barajda 30 Kas\u0131m 2017 tarihine kadar toplam 13,75 milyar kilovatsaat enerji \u00fcreterek, milli ekonomiye 3 milyar 162 milyon lira destek sa\u011flad\u0131k.\u201d ifadelerine yer verdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Artvin\u2019de, \u00c7oruh Nehri \u00fczerinde yer alan Deriner, Bor\u00e7ka ve Muratl\u0131 barajlar\u0131ndan milli ekonomiye 5 milyar liral\u0131k dev katk\u0131 sa\u011flanmaktad\u0131r. DS\u0130 Genel M\u00fcd\u00fcr\u00fc Murat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70050,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1089,3881,9824,1359,1091,36320,67,1009,34926,26043,1090,26044,36321,3882],"views":1190,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70049"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=70049"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70049\/revisions"}],"predecessor-version":[{"id":70053,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/70049\/revisions\/70053"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/70050"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=70049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=70049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=70049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}