{"id":69910,"date":"2017-12-11T02:31:17","date_gmt":"2017-12-10T23:31:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69910"},"modified":"2017-12-11T02:31:17","modified_gmt":"2017-12-10T23:31:17","slug":"trabzona-2-yeni-hes-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/trabzona-2-yeni-hes-yapilacak\/","title":{"rendered":"(Turkish) Trabzon&#8217;a 2 Yeni HES Yap\u0131lacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69910\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Trabzon B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan, Esiro\u011flu&#8217;nda HES yapacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-69911\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/trabzona-2-yeni-hes-yapilacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/trabzona-2-yeni-hes-yapilacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/trabzona-2-yeni-hes-yapilacak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/trabzona-2-yeni-hes-yapilacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/trabzona-2-yeni-hes-yapilacak.jpg 708w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Enerji ve Tabi Kaynaklar Bakanl\u0131\u011f\u0131, AB ve T\u0130SK\u0130 ortal\u0131\u011f\u0131nda yap\u0131lacak proje k\u0131sa s\u00fcrede hayata ge\u00e7irilmesi hedefleniyor. HES konusunda dere yataklar\u0131na hassasiyetlerinin bulundu\u011funu belirten G\u00fcmr\u00fck\u00e7\u00fco\u011flu, \u201cHer hangi bir dere yata\u011f\u0131m\u0131z\u0131 i\u015fgal edecek \u015fekilde HES projesine yol ve izin vermemekle birlikte bunu kendimiz i\u00e7in de ge\u00e7erli tutmaktay\u0131z. Kendimiz i\u00e7in de dere yataklar\u0131n\u0131 kurutur i\u015flemin i\u00e7inde olmad\u0131k. Ama bu proje\u00a0 Esiro\u011flu\u2019nda Atasu Baraj\u0131ndan, mevcut yerimizden gelen hat m\u00fcnasebetiyle devreye sokulacak olan\u00a0 Esiro\u011flu 450 KVA\u2019l\u0131k HES yap\u0131lmas\u0131 i\u015fidir. Enerji ve Tabi Kaynaklar taraf\u0131ndan yap\u0131lmakta. Bu konuda Enerji Bakanl\u0131\u011f\u0131 H\u0130BE olarak destek verdi. Enerji Bakan\u0131m\u0131z\u0131 \u015fehrimizin evlad\u0131 olmas\u0131 m\u00fcnasebetiyle bu konuda ayr\u0131 bir destek vermi\u015ftir. Hibe olarak bu konunin ba\u011f\u0131\u015flamas\u0131n\u0131 temin etmi\u015ftir. 450 KV\u2019l\u0131k\u00a0 Esiro\u011flu HES Projesinin Enerji Bakanl\u0131\u011f\u0131na d\u00fc\u015fen k\u0131sm\u0131n\u0131n ba\u011f\u0131\u015f olarak takdim etmi\u015fti\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Trabzon B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan, Esiro\u011flu&#8217;nda HES yapacak. Enerji ve Tabi Kaynaklar Bakanl\u0131\u011f\u0131, AB ve T\u0130SK\u0130 ortal\u0131\u011f\u0131nda yap\u0131lacak proje k\u0131sa s\u00fcrede hayata ge\u00e7irilmesi hedefleniyor. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":69911,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[67,1009,34926,1090,105],"views":1635,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69910"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69910"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69910\/revisions"}],"predecessor-version":[{"id":69912,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69910\/revisions\/69912"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/69911"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}