{"id":69663,"date":"2017-12-01T13:20:31","date_gmt":"2017-12-01T10:20:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69663"},"modified":"2017-12-01T13:20:50","modified_gmt":"2017-12-01T10:20:50","slug":"nordexten-turkiyede-yeni-bir-proje-daha","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordexten-turkiyede-yeni-bir-proje-daha\/","title":{"rendered":"(Turkish) Nordex\u2019ten T\u00fcrkiye\u2019de Yeni Bir Proje Daha&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69663\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Nordex Grup, Nisan 2018\u2019de kurulumuna \u0130zmir&#8217;de ba\u015flanacak olan 30 MW kapasiteli Alibey RES projesi i\u00e7in 9 adet r\u00fczgar t\u00fcrbini tedarik edecek.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-69664\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/nordexten-turkiyede-yeni-bir-proje-daha-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/nordexten-turkiyede-yeni-bir-proje-daha-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/nordexten-turkiyede-yeni-bir-proje-daha-768x513.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/nordexten-turkiyede-yeni-bir-proje-daha-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/nordexten-turkiyede-yeni-bir-proje-daha-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/12\/nordexten-turkiyede-yeni-bir-proje-daha.jpg 907w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>B\u00f6ylece proje sahibi Umut \u0130n\u015faat Nordex ile T\u00fcrkiye\u2019deki alt\u0131nc\u0131 projesini hayata ge\u00e7irmi\u015f olacak.<\/p>\n<p>1.200 metre y\u00fckseklikte in\u015fa edilecek olan Alibey RES i\u00e7in g\u00fc\u00e7l\u00fc r\u00fczgar ko\u015fullar\u0131na uygun be\u015f adet N117\/3600 ve 4 adet N117\/3000 tipi r\u00fczgar t\u00fcrbini tedari\u011fi i\u00e7in anla\u015fma sa\u011fland\u0131. Nordex Grup, yerli \u00fcretim i\u00e7eri\u011fini art\u0131rmak i\u00e7in t\u00fcrbinlerin ana bile\u015fenlerini T\u00fcrkiye\u2019den tedarik edecek.<\/p>\n<p><strong>Nordex Grup hakk\u0131nda<\/strong><\/p>\n<p>Grup, 25&#8217;in \u00fczerinde farkl\u0131 pazarda yakla\u015f\u0131k 21 GW&#8217;l\u0131k r\u00fczgar enerjisi kapasitesi tesis etmi\u015ftir. 2016 y\u0131l\u0131nda, 25\u2019ten fazla \u00fclkedeki faaliyetleriyle toplamda 3.4 milyar avroluk gelir elde etmi\u015ftir. \u015eirket \u015fu anda yakla\u015f\u0131k 5.000 ki\u015filik bir i\u015f g\u00fcc\u00fcn\u00fc istihdam etmektedir. Ortak \u00fcretim kapasitesi Almanya, \u0130spanya, Brezilya, Amerika Birle\u015fik Devletleri ve Hindistan&#8217;daki fabrikalar\u0131 kapsamaktad\u0131r. Nordex, geli\u015fmi\u015f ve geli\u015fmekte olan piyasalardaki pazar gereksinimleri i\u00e7in \u00f6zel olarak haz\u0131rlanm\u0131\u015f olan, 1.5-4.5 MW kara t\u00fcrbinleri s\u0131n\u0131f\u0131ndaki \u00fcr\u00fcn portfoy\u00fcne odaklanm\u0131\u015ft\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Nordex Grup, Nisan 2018\u2019de kurulumuna \u0130zmir&#8217;de ba\u015flanacak olan 30 MW kapasiteli Alibey RES projesi i\u00e7in 9 adet r\u00fczgar t\u00fcrbini tedarik edecek. B\u00f6ylece proje [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":69664,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[67,1009,23311,2455,36186,35002,24949,34960,324],"views":1430,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69663"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69663"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69663\/revisions"}],"predecessor-version":[{"id":69665,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69663\/revisions\/69665"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/69664"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}