{"id":69490,"date":"2017-11-26T00:01:23","date_gmt":"2017-11-25T21:01:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69490"},"modified":"2017-11-26T00:01:23","modified_gmt":"2017-11-25T21:01:23","slug":"kirikkalede-kombine-cevrim-enerji-santrali-hizmete-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirikkalede-kombine-cevrim-enerji-santrali-hizmete-girdi\/","title":{"rendered":"(Turkish) K\u0131r\u0131kkale\u2019de, Kombine \u00c7evrim Enerji Santrali Hizmete Girdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69490\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>K\u0131r\u0131kkale\u2019ye kurulan 1 milyar dolar yat\u0131r\u0131m bedeli olan Kombine \u00c7evrim Enerji Santrali, T\u00fcrkiye\u2019nin elektrik ihtiyac\u0131n\u0131n y\u00fczde 2,5\u2019ini kar\u015f\u0131layacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-69491\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/kirikkalede-kombine-cevrim-enerji-santrali-hizmete-girdi-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/kirikkalede-kombine-cevrim-enerji-santrali-hizmete-girdi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/kirikkalede-kombine-cevrim-enerji-santrali-hizmete-girdi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/kirikkalede-kombine-cevrim-enerji-santrali-hizmete-girdi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/kirikkalede-kombine-cevrim-enerji-santrali-hizmete-girdi.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span id=\"more-95702\"><\/span>K\u0131r\u0131kkale\u2019nin Yah\u015fihan il\u00e7esi K\u0131l\u0131\u00e7lar Belediyesi s\u0131n\u0131rlar\u0131nda kurulan Kombine \u00c7evrim Enerji Santralinin a\u00e7\u0131l\u0131\u015f\u0131, Cumhurba\u015fkan\u0131 Recep Tayyip Erdo\u011fan\u2019\u0131n telekonferans yoluyla kat\u0131l\u0131m\u0131yla ger\u00e7ekle\u015fti. Yap\u0131lan santral ile do\u011falgaz \u00fczerinden elde edilen enerji ile \u00fclkenin elektrik ihtiyac\u0131n\u0131n y\u00fczde 2,5\u2019inin kar\u015f\u0131lanmas\u0131 hedefleniyor.<\/p>\n<p>ACWA Power ve Samsung C&amp;T ortakl\u0131\u011f\u0131 ile ger\u00e7ekle\u015ftirilen 1 milyar dolarl\u0131k yat\u0131r\u0131ma dair a\u00e7\u0131klamalara yer veren ACWA Power T\u00fcrkiye CEO\u2019su Abid Hussaim Malik, \u201c\u00c7ok y\u00fcksek kaliteli ve etkinli\u011fe sahip bir tesis in\u015fa ettik. \u0130n\u015faat s\u0131ras\u0131nda iki binden fazla m\u00fchendis bu tesiste \u00e7al\u0131\u015ft\u0131. \u0130n\u015faat\u0131 tamamlamak i\u00e7in \u015fu anda da operasyona ba\u015flad\u0131\u011f\u0131m\u0131z g\u00fcnden beri son derece verimli bir \u00e7al\u0131\u015fma y\u00fcr\u00fct\u00fcyoruz\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.K\u0131r\u0131kkale\u2019ye kurulan 1 milyar dolar yat\u0131r\u0131m bedeli olan Kombine \u00c7evrim Enerji Santrali, T\u00fcrkiye\u2019nin elektrik ihtiyac\u0131n\u0131n y\u00fczde 2,5\u2019ini kar\u015f\u0131layacak. K\u0131r\u0131kkale\u2019nin Yah\u015fihan il\u00e7esi K\u0131l\u0131\u00e7lar Belediyesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":69491,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[20782,1128,19761,23219,68,1478,67,1009,4474,36138,6690],"views":1448,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69490"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69490"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69490\/revisions"}],"predecessor-version":[{"id":69492,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69490\/revisions\/69492"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/69491"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}