{"id":69291,"date":"2017-11-17T16:53:55","date_gmt":"2017-11-17T13:53:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69291"},"modified":"2017-11-17T16:53:55","modified_gmt":"2017-11-17T13:53:55","slug":"renoe-acipayam-ges-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/renoe-acipayam-ges-devreye-alindi\/","title":{"rendered":"(Turkish) Renoe Ac\u0131payam GES Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69291\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Lisansl\u0131 g\u00fcne\u015f enerjisi santrali say\u0131s\u0131 Ekim ay\u0131nda \u00fc\u00e7e y\u00fckseldi. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan a\u00e7\u0131klanan verilere g\u00f6re Renoe Ac\u0131payam GES projesinin 1 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fc i\u00e7in 13 Ekim 2017 tarihinde ge\u00e7ici kabul i\u015flemi yap\u0131ld\u0131.<\/strong><\/p>\n<p>Eriko\u011flu Holding \u015firketlerinden Renoe Enerji, T\u00fcrkiye Elektrik \u0130letim A.\u015e. taraf\u0131ndan 29 Ocak 2015 tarihinde ger\u00e7ekle\u015ftirilen kapasite tahsis yar\u0131\u015fmas\u0131nda proje i\u00e7in 10 MW\u2019l\u0131k kapasite hakk\u0131 elde etmi\u015fti.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-69293\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/renoe-acipayam-ges-devreye-alindi-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/renoe-acipayam-ges-devreye-alindi-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/renoe-acipayam-ges-devreye-alindi-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/renoe-acipayam-ges-devreye-alindi.jpg 320w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Proje i\u00e7in 27 Temmuz 2017 tarihli EPDK Kurul Karar\u0131 ile de 49 y\u0131l s\u00fcreli elektrik \u00fcretim lisans\u0131 sa\u011flanm\u0131\u015ft\u0131.<\/p>\n<p>\u015eirket 2015\u2019teki yar\u0131\u015fmada proje i\u00e7in TE\u0130A\u015e\u2019a MW ba\u015f\u0131na 1.450.000 TL olmak \u00fczere 14.500.000 TL\u2019lik katk\u0131 pay\u0131 \u00f6demeyi taahh\u00fct etmi\u015fti. Yar\u0131\u015fman\u0131n yap\u0131ld\u0131\u011f\u0131 g\u00fcnk\u00fc dolar kuru ile bu taahh\u00fct 6.041.666 ABD Dolar\u0131na denk geliyordu.<\/p>\n<p>T\u00fcrkiye\u2019nin lisansl\u0131 alandaki ilk g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131 i\u00e7in 2014-2015 y\u0131llar\u0131nda 600 MW\u2019l\u0131k \u00fcst s\u0131n\u0131r dahilinde kapasite tahsis yar\u0131\u015fmalar\u0131 ger\u00e7ekle\u015ftirilmi\u015fti.<\/p>\n<p>Bu s\u00fcre\u00e7 sonunda 49 ayr\u0131 g\u00fcne\u015f enerjisi santrali projesi i\u00e7in toplamda 585,90 MW\u2019l\u0131k kapasite tahsis edilmi\u015fti.<\/p>\n<p>Bu projelerden 8 MW kapasite tahsis edilen Solentegre GES ve 5 MW kapasite tahsis edilen Halk Enerji Erzurum GES projeleri 2016\u2019n\u0131n Ekim ay\u0131nda devreye girmi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Lisansl\u0131 g\u00fcne\u015f enerjisi santrali say\u0131s\u0131 Ekim ay\u0131nda \u00fc\u00e7e y\u00fckseldi. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan a\u00e7\u0131klanan verilere g\u00f6re Renoe Ac\u0131payam GES projesinin 1 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":69293,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,32190,2326,23416,2569,33338,8731,29230,36055],"views":950,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69291"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69291"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69291\/revisions"}],"predecessor-version":[{"id":69294,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69291\/revisions\/69294"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/69293"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69291"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69291"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69291"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}