{"id":69264,"date":"2017-11-16T17:22:54","date_gmt":"2017-11-16T14:22:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69264"},"modified":"2017-11-16T17:23:28","modified_gmt":"2017-11-16T14:23:28","slug":"akkuyu-ngsnin-temeli-2018de-atiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-temeli-2018de-atiliyor\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019nin Temeli 2018\u2019de At\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69264\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Cumhurba\u015fkan\u0131 Tayyip Erdo\u011fan taraf\u0131ndan So\u00e7i ziyaretinde 4 bin 800 megavat g\u00fcc\u00fcndeki Akkuyu N\u00fckleer Santral\u0131\u2019n\u0131n \u201cbeton d\u00f6kme\u201d t\u00f6renine Rusya Devlet Ba\u015fkan\u0131 <img loading=\"lazy\" class=\"alignleft size-medium wp-image-5878\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/akkuyu-ngs-nukleer-santrali.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Vladimir Putin\u2019i davet edildi. Bu davet, g\u00f6zleri Ankara\u2019ya t\u00f6ren haz\u0131rl\u0131klar\u0131na \u00e7evirdi. Akkuyu N\u00fckleer A\u015e y\u00f6netimi, \u201cbeton d\u00f6kme\u201d t\u00f6reni i\u00e7in bir organizasyon \u015firketi ile g\u00f6r\u00fc\u015fmelere ba\u015flad\u0131.<\/strong><\/p>\n<p>Kaynaklardan verilen bilgiye g\u00f6re &#8220;Santralin 1200 mw&#8217;l\u0131k ilk \u00fcnitesinin temelinin ne zaman at\u0131laca\u011f\u0131 sorusu \u00fczerine, \u201cAkkuyu N\u00fckleer A\u015e\u2019ye hen\u00fcz in\u015faat lisans\u0131 verilmedi. \u015eirket, in\u015faat lisans\u0131 i\u00e7in yasal haz\u0131rl\u0131klar\u0131na devam ediyor, \u00f6ng\u00f6r\u00fclen belgeleri tamamlamak amac\u0131yla \u00e7al\u0131\u015fmalar\u0131 s\u00fcrd\u00fcr\u00fcyorlar\u201d ifadelerine yer verildi.<\/p>\n<p>Uzmanlar, sahada yap\u0131lan \u00e7al\u0131\u015fmalar\u0131 da incelemektedir. Bunlar tamamland\u0131ktan sonra in\u015faat lisans\u0131 ba\u015fvurusuna ili\u015fkin rapor haz\u0131rlanacak. TAEK\u2019in olumlu g\u00f6r\u00fc\u015f\u00fcnden sonra Akkuyu N\u00fckleer A\u015e\u2019ye in\u015faat lisans\u0131 verilecek\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Cumhurba\u015fkan\u0131 Tayyip Erdo\u011fan taraf\u0131ndan So\u00e7i ziyaretinde 4 bin 800 megavat g\u00fcc\u00fcndeki Akkuyu N\u00fckleer Santral\u0131\u2019n\u0131n \u201cbeton d\u00f6kme\u201d t\u00f6renine Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin\u2019i davet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5878,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,67,1009,21,23134,34931,34930,2644],"views":1144,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69264"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69264"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69264\/revisions"}],"predecessor-version":[{"id":69266,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69264\/revisions\/69266"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/5878"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69264"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69264"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}