{"id":69136,"date":"2017-11-13T00:45:27","date_gmt":"2017-11-12T21:45:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69136"},"modified":"2017-11-13T00:45:27","modified_gmt":"2017-11-12T21:45:27","slug":"sivas-gurunde-80-mw-gucunde-pelit-res-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sivas-gurunde-80-mw-gucunde-pelit-res-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Sivas G\u00fcr\u00fcn\u2019de 80 MW G\u00fcc\u00fcnde Pelit RES Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69136\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Pelit Yenilenebilir Enerji taraf\u0131ndan Sivas\u2019\u0131n G\u00fcr\u00fcn il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7inde 80 MW kapasiteye sahip Pelit R\u00fczgar Santrali kurulumu yap\u0131lacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-50070 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak-300x215.jpg\" alt=\"sivas-gurunde-80-mw-gucunde-pelit-res-kurulumu-yapilacak\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/ovacik-res-icin-halk-toplantisi-yapilacak.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Sivas ili, G\u00fcr\u00fcn \u0130l\u00e7esi, K\u00fcrk\u00e7\u00fc, Koyunlu, B\u00f6\u011fr\u00fcdelik, Y\u0131lanh\u00f6y\u00fck, Yenibekta\u015fl\u0131, \u00c7i\u00e7ekyurt K\u00f6yleri Mevkii\u2019 nde, 80 MWe\/80 MWm kurulu g\u00fcce sahip \u201cPelit R\u00fczgar Enerjisi Santrali\u2019nin kurulup i\u015fletilmesi planlanmaktad\u0131r.<\/p>\n<p>323 milyon lira yat\u0131r\u0131m bedeline sahip proje kapsam\u0131nda her biri 2 MW kapasiteli toplam 40 r\u00fczgar t\u00fcrbininden toplamda 280.000.000 kWh elektrik elde edilecektir. Ekonomik \u00f6mr\u00fcn\u00fcn 49 y\u0131l olaca\u011f\u0131 santralin in\u015faat \u00e7al\u0131\u015fmalar\u0131nda yakla\u015f\u0131k 40 ki\u015finin \u00e7al\u0131\u015fmas\u0131 ve \u00e7al\u0131\u015fmalar\u0131n 12 ay s\u00fcrmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Pelit Yenilenebilir Enerji taraf\u0131ndan Sivas\u2019\u0131n G\u00fcr\u00fcn il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7inde 80 MW kapasiteye sahip Pelit R\u00fczgar Santrali kurulumu yap\u0131lacak. Sivas ili, G\u00fcr\u00fcn \u0130l\u00e7esi, K\u00fcrk\u00e7\u00fc, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40031,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[68,67,1009,36008,36009,36007,474,35002,24949,34960,2437,105],"views":2103,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69136"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69136"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69136\/revisions"}],"predecessor-version":[{"id":69137,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69136\/revisions\/69137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40031"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}