{"id":69111,"date":"2017-11-12T00:05:11","date_gmt":"2017-11-11T21:05:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69111"},"modified":"2017-11-12T00:06:16","modified_gmt":"2017-11-11T21:06:16","slug":"turkerlerden-alasehir-jesin-3uncu-fazina-yonelik-calismalar","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkerlerden-alasehir-jesin-3uncu-fazina-yonelik-calismalar\/","title":{"rendered":"(Turkish) T\u00fcrkerler&#8217;den Ala\u015fehir JES\u2019in 3\u00fcnc\u00fc Faz\u0131na Y\u00f6nelik \u00c7al\u0131\u015fmalar"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69111\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ge\u00e7ti\u011fimiz g\u00fcnlerde T\u00fcrkerler Ala\u015fehir Jeotermal Enerji Santrali\u2019nin toplam 48 MW\u2019l\u0131k ilk iki faz\u0131n\u0131 t\u00f6renle devreye sokan T\u00fcrkerler Holding, santralin 120 MW\u2019l\u0131k \u00fc\u00e7\u00fcnc\u00fc faz\u0131 i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-69112\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/turkerlerden-alasehir-jesin-3-fazina-yonelik-calismalar-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/turkerlerden-alasehir-jesin-3-fazina-yonelik-calismalar.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/turkerlerden-alasehir-jesin-3-fazina-yonelik-calismalar-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>T\u00fcrkerler Jeotermal Enerji Arama ve \u00dcretim A.\u015e., Manisa \u0130li, Ala\u015fehir \u0130l\u00e7esi, \u0130stasyon Mahallesi, Zeytin\u00e7ay Mevkii\u2019nde elektrik \u00fcretimi ama\u00e7l\u0131 \u201cT\u00fcrkerler Ala\u015fehir Jeotermal Enerji Santrali Faz 3 (4&#215;30 MWe\/4&#215;30 MWm)\u201d projesini tesis edip faaliyete ge\u00e7irecek.<\/p>\n<p>4 \u00fcniteli olarak yap\u0131lmas\u0131 planlanan T\u00fcrkerler Ala\u015fehir Jeotermal Enerji Santrali Faz-3\u2019\u00fcn toplam kurulu g\u00fcc\u00fc 120 MWe\/MWm\u2019dir. Ancak ilerleyen s\u00fcre\u00e7te 100 MWe\/100MWm olarak da toplam kurulu g\u00fcce sahip olmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>\u00d6mr\u00fc 30 y\u0131l olarak tahmin edilen santralin izin, in\u015faat, montaj ve devreye alma \u00e7al\u0131\u015fmalar\u0131n\u0131n yakla\u015f\u0131k 4 y\u0131lda tamamlanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ge\u00e7ti\u011fimiz g\u00fcnlerde T\u00fcrkerler Ala\u015fehir Jeotermal Enerji Santrali\u2019nin toplam 48 MW\u2019l\u0131k ilk iki faz\u0131n\u0131 t\u00f6renle devreye sokan T\u00fcrkerler Holding, santralin 120 MW\u2019l\u0131k \u00fc\u00e7\u00fcnc\u00fc faz\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":69112,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[25670,67,1009,16077,6322,2191,35998,29210],"views":2022,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69111"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69111"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69111\/revisions"}],"predecessor-version":[{"id":69113,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69111\/revisions\/69113"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/69112"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}