{"id":69027,"date":"2017-11-08T13:17:31","date_gmt":"2017-11-08T10:17:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69027"},"modified":"2017-11-08T13:17:31","modified_gmt":"2017-11-08T10:17:31","slug":"karacabeydeki-gunes-santrali-1000-konutun-enerji-ihtiyacini-karsiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karacabeydeki-gunes-santrali-1000-konutun-enerji-ihtiyacini-karsiliyor\/","title":{"rendered":"(Turkish) Karacabey\u2019deki G\u00fcne\u015f Santrali 1000 Konutun Enerji \u0130htiyac\u0131n\u0131 Kar\u015f\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69027\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bursa\u2019n\u0131n Karacabey il\u00e7esi\u00a0Tophisar Mahallesi\u2019nde 32 d\u00f6n\u00fcm alanda 7 bin adet g\u00fcne\u015f paneli kurularak 2mw g\u00fcc\u00fcnde enerji \u00fcretimi ger\u00e7ekle\u015ftirilmektedir.<\/strong><\/p>\n<p>Yat\u0131r\u0131mc\u0131 \u00c7a\u011fan Y\u00fcksel a\u00e7\u0131klamas\u0131nda: \u201cTesiste 2 MW g\u00fcc\u00fcnde enerji \u00fcretiyoruz. Yakla\u015f\u0131k bin hanenin enerjisini g\u00fcne\u015ften elde ederek elektrik \u00fcretimi yap\u0131yoruz. Tesisin 5-6 y\u0131lda kendini amorti etmesini <img loading=\"lazy\" class=\"alignright size-medium wp-image-36445\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/teias-ges-yarisma-gunes-enerjisi-on-lisans-ihaleleri-300x148.jpg\" alt=\"\" width=\"300\" height=\"148\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/teias-ges-yarisma-gunes-enerjisi-on-lisans-ihaleleri-300x148.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/teias-ges-yarisma-gunes-enerjisi-on-lisans-ihaleleri-500x247.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/teias-ges-yarisma-gunes-enerjisi-on-lisans-ihaleleri-80x39.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/teias-ges-yarisma-gunes-enerjisi-on-lisans-ihaleleri.jpg 765w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>bekliyoruz. Ondan sonra para kazanaca\u011f\u0131z. Tesisin 20-25 sene gibi ekonomik \u00f6mr\u00fc var. Devletle 10 senelik bir s\u00f6zle\u015fme yapt\u0131k. Fakat 10 y\u0131l boyunca y\u00fcksek bedel \u00fczerinden elektrik almay\u0131 taahh\u00fct ederek bizi destekliyor. 10 y\u0131l sonra da d\u00fc\u015f\u00fck fiyatla da olsa yine devlete elektri\u011fi sataca\u011f\u0131z. \u00c7\u00fcnk\u00fc enerji ihtiyac\u0131 ciddi bir problem\u201d dedi.<\/p>\n<p>Y\u00fcksel ayr\u0131ca; toplamda burada 2,6 milyon dolarl\u0131k yat\u0131r\u0131m ger\u00e7ekle\u015ftirdik. Hayvanc\u0131l\u0131k tesisimizle beraber 6,5 milyon dolar yat\u0131r\u0131m yapm\u0131\u015f olduk. \u00dclke olarak cari a\u00e7\u0131\u011f\u0131m\u0131z\u0131n \u00e7ok b\u00fcy\u00fck bir b\u00f6l\u00fcm\u00fcn\u00fc petrol \u00fcr\u00fcnlerine yap\u0131yoruz.\u00a0Bunu \u00f6nlemenin tek yolu ise r\u00fczgar santralleri, g\u00fcne\u015f enerji santralleri ve t\u00fcrevlerini \u00fclkemizde kurmakt\u0131r. \u0130thalat yapmadan bu ihtiya\u00e7lar\u0131m\u0131z\u0131 kar\u015f\u0131lamak zor\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bursa\u2019n\u0131n Karacabey il\u00e7esi\u00a0Tophisar Mahallesi\u2019nde 32 d\u00f6n\u00fcm alanda 7 bin adet g\u00fcne\u015f paneli kurularak 2mw g\u00fcc\u00fcnde enerji \u00fcretimi ger\u00e7ekle\u015ftirilmektedir. Yat\u0131r\u0131mc\u0131 \u00c7a\u011fan Y\u00fcksel a\u00e7\u0131klamas\u0131nda: \u201cTesiste [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30293,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,18007],"tags":[958,68,67,1009,93,2326,227,13,23416,2569,108,23131,16,17,105],"views":982,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69027"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69027"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69027\/revisions"}],"predecessor-version":[{"id":69028,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69027\/revisions\/69028"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30293"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}