{"id":69018,"date":"2017-11-08T12:42:28","date_gmt":"2017-11-08T09:42:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=69018"},"modified":"2017-11-08T12:42:28","modified_gmt":"2017-11-08T09:42:28","slug":"aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti\/","title":{"rendered":"(Turkish) Aksa Enerji\u2019nin Madagaskar Santrali\u2019ni Madagaskar Cumhurba\u015fkan\u0131 A\u00e7t\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/69018\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin halka a\u00e7<\/strong><strong>\u0131<\/strong><strong>k en b<\/strong><strong>\u00fc<\/strong><strong>y<\/strong><strong>\u00fc<\/strong><strong>k serbest elektrik <\/strong><strong>\u00fc<\/strong><strong>reticisi Aksa Enerji, Eyl<\/strong><strong>\u00fc<\/strong><strong>l ay<\/strong><strong>\u0131<\/strong><strong>nda ticari faaliyetine ba<\/strong><strong>\u015f<\/strong><strong>layan Madagaskar Enerji Santrali<\/strong><strong>\u2019<\/strong><strong>nin resmi a<\/strong><strong>\u00e7<\/strong><strong>\u0131<\/strong><strong>l<\/strong><strong>\u0131\u015f\u0131<\/strong><strong>n<\/strong><strong>\u0131<\/strong><strong> ger<\/strong><strong>\u00e7<\/strong><strong>ekle<\/strong><strong>\u015f<\/strong><strong>tirdi.<\/strong><\/p>\n<p><strong>Madagaskar Cumhurba<\/strong><strong>\u015f<\/strong><strong>kan<\/strong><strong>\u0131<\/strong><strong> Hery Rajaonarimampianina<\/strong><strong>\u2019<\/strong><strong>n<\/strong><strong>\u0131<\/strong><strong>n da kat<\/strong><strong>\u0131<\/strong><strong>ld<\/strong><strong>\u0131\u011f\u0131<\/strong><strong> a<\/strong><strong>\u00e7<\/strong><strong>\u0131<\/strong><strong>l<\/strong><strong>\u0131\u015f<\/strong><strong> t<\/strong><strong>\u00f6<\/strong><strong>reninde konu<\/strong><strong>\u015f<\/strong><strong>an Aksa Enerji Enerji Grup Ba<\/strong><strong>\u015f<\/strong><strong>kan<\/strong><strong>\u0131<\/strong><strong>, CEO ve Y<\/strong><strong>\u00f6<\/strong><strong>netim Kurulu <\/strong><strong>\u00dc<\/strong><strong>yesi C<\/strong><strong>\u00fc<\/strong><strong>neyt Uygun, Madagaskar<\/strong><strong>\u2019<\/strong><strong>daki ilk ve tek do<\/strong><strong>\u011f<\/strong><strong>rudan T<\/strong><strong>\u00fc<\/strong><strong>rk yat<\/strong><strong>\u0131<\/strong><strong>r<\/strong><strong>\u0131<\/strong><strong>m<\/strong><strong>\u0131<\/strong><strong> olan 66 MW g<\/strong><strong>\u00fc<\/strong><strong>c<\/strong><strong>\u00fc<\/strong><strong>ndeki santralin in<\/strong><strong>\u015f<\/strong><strong>aat<\/strong><strong>\u0131<\/strong><strong>n<\/strong><strong>\u0131<\/strong><strong> 7 ay gibi k<\/strong><strong>\u0131<\/strong><strong>sa bir s<\/strong><strong>\u00fc<\/strong><strong>rede Madagaskarl<\/strong><strong>\u0131<\/strong><strong>lar<\/strong><strong>\u0131<\/strong><strong>n hizmetine sunduklar<\/strong><strong>\u0131<\/strong><strong> i<\/strong><strong>\u00e7<\/strong><strong>in gurur duyduklar<\/strong><strong>\u0131<\/strong><strong>n<\/strong><strong>\u0131<\/strong><strong> belirtirken, bunun daha k\u00f6kl\u00fc uzun vadeli bir i<\/strong><strong>\u015f<\/strong><strong> birlikteli<\/strong><strong>\u011f<\/strong><strong>inin ilk <\/strong><strong>\u00fc<\/strong><strong>r<\/strong><strong>\u00fc<\/strong><strong>n<\/strong><strong>\u00fc<\/strong><strong> oldu<\/strong><strong>\u011f<\/strong><strong>unu, yeni yat<\/strong><strong>\u0131<\/strong><strong>r<\/strong><strong>\u0131<\/strong><strong>mlarla bu i<\/strong><strong>\u015f<\/strong><strong> birlikteli<\/strong><strong>\u011f<\/strong><strong>inin daha ilerilere ta<\/strong><strong>\u015f\u0131<\/strong><strong>naca<\/strong><strong>\u011f\u0131<\/strong><strong>na olan inanc<\/strong><strong>\u0131<\/strong><strong>n<\/strong><strong>\u0131<\/strong><strong> Sn. Ba<\/strong><strong>\u015f<\/strong><strong>kan<\/strong><strong>\u2019<\/strong><strong>a aktarm<\/strong><strong>\u0131\u015f<\/strong><strong>t<\/strong><strong>\u0131<\/strong><strong>r.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin halka a\u00e7\u0131k en b\u00fcy\u00fck serbest elektrik \u00fcreticisi Aksa Enerji, Madagaskar\u2019\u0131n ba\u015fkenti Antananarivo\u2019da 7 Kas\u0131m\u2019da ger\u00e7ekle\u015ftirilen a\u00e7\u0131l\u0131\u015f t\u00f6renine Madagaskar Cumhurba\u015fkan\u0131 Sn. Hery <img loading=\"lazy\" class=\"alignleft size-medium wp-image-69019\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti-768x512.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti-1024x683.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/aksa-enerjinin-madagaskar-santralini-madagaskar-cumhurbaskani-acti.jpg 1144w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>RAJAONARIMAMPIANINA, Ba\u015fbakan\u0131 Sn. Olivier Mahafaly Solonandrasana ve Enerji Bakan\u0131 Sn. Lantoniaina Rasoloelison olmak \u00fczere bir\u00e7ok bakan ve h\u00fck\u00fcmet yetkilisi de kat\u0131ld\u0131. Toplamda 66 MW kurulu g\u00fcce sahip olan santralin a\u00e7\u0131l\u0131\u015f t\u00f6reninde, Cumhurba\u015fkan\u0131 Sn. Erdo\u011fan\u2019\u0131n Ocak ay\u0131nda Madagaskar\u2019a yapt\u0131\u011f\u0131 ziyareti ve a\u00e7\u0131klamalar\u0131n\u0131 hat\u0131rlatan Aksa Enerji Grup Ba\u015fkan\u0131, CEO ve Y\u00f6netim Kurulu \u00dcyesi C\u00fcneyt Uygun, \u00fclkedeki tek T\u00fcrk yat\u0131r\u0131mc\u0131 olarak Madagaskarl\u0131lar\u0131n enerji ihtiya\u00e7lar\u0131na \u00e7\u00f6z\u00fcm sunduklar\u0131 i\u00e7in gurur duyduklar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p><strong>\u201cEnerjinin olmad<\/strong><strong>\u0131\u011f\u0131<\/strong><strong> yerde medeniyetten s<\/strong><strong>\u00f6<\/strong><strong>z edilemez<\/strong><strong>\u201d<\/strong><\/p>\n<p>Cumhurba\u015fkan\u0131 Erdo\u011fan\u2019\u0131n \u201cEnerjinin olmad\u0131\u011f\u0131 yerde medeni olmaktan s\u00f6z edilemez.\u201d diyerek T\u00fcrk yat\u0131r\u0131mc\u0131lar\u0131 \u00f6zellikle Madagaskar\u2019a davet etti\u011fini s\u00f6yleyen Aksa Enerji Grup Ba\u015fkan\u0131, CEO ve Y\u00f6netim Kurulu \u00dcyesi C\u00fcneyt Uygun, a\u00e7\u0131l\u0131\u015f konu\u015fmas\u0131nda \u015funlar\u0131 s\u00f6yledi;<\/p>\n<p><em>\u201c<\/em><em>\u0130<\/em><em>lk faz<\/em><em>\u0131<\/em><em>n<\/em><em>\u0131<\/em><em> Eyl<\/em><em>\u00fc<\/em><em>l ay<\/em><em>\u0131<\/em><em>nda tamamlad<\/em><em>\u0131\u011f\u0131<\/em><em>m<\/em><em>\u0131<\/em><em>z Santralimizi 7 ay gibi k<\/em><em>\u0131<\/em><em>sa bir s<\/em><em>\u00fc<\/em><em>rede hizmete a<\/em><em>\u00e7<\/em><em>t<\/em><em>\u0131\u011f\u0131<\/em><em>m<\/em><em>\u0131<\/em><em>z i<\/em><em>\u00e7<\/em><em>in mutluluk duyuyoruz. Bu santral y<\/em><em>\u0131<\/em><em>lda <\/em><em>\u00fc<\/em><em>retece<\/em><em>\u011f<\/em><em>i 500 milyon KWh elektrikle Madagaskar<\/em><em>\u2019<\/em><em>\u0131<\/em><em>n yakla<\/em><em>\u015f\u0131<\/em><em>k y<\/em><em>\u00fc<\/em><em>zde 34<\/em><em>\u2019\u00fc<\/em><em>n<\/em><em>\u00fc<\/em><em>n elektrik ihtiyac<\/em><em>\u0131<\/em><em>na cevap verecek. Santralin in<\/em><em>\u015f<\/em><em>as<\/em><em>\u0131<\/em><em>nda yerli i<\/em><em>\u015f<\/em><em>g<\/em><em>\u00fc<\/em><em>c<\/em><em>\u00fc<\/em><em>ne b<\/em><em>\u00fc<\/em><em>y<\/em><em>\u00fc<\/em><em>k <\/em><em>\u00f6<\/em><em>nem verdik. <\/em><em>\u0130<\/em><em>stihdam<\/em><em>\u0131<\/em><em>n yan<\/em><em>\u0131<\/em><em> s<\/em><em>\u0131<\/em><em>ra kurdu<\/em><em>\u011f<\/em><em>umuz ekipler Aksa Enerji<\/em><em>\u2019<\/em><em>nin uzman teknik personelinin yan<\/em><em>\u0131<\/em><em>nda kendini geli<\/em><em>\u015f<\/em><em>tirdi. Bu nedenle <\/em><em>\u015e<\/em><em>irketimizin as<\/em><em>\u0131<\/em><em>l gayesi olarak, kesintisiz ve g<\/em><em>\u00fc<\/em><em>venilir enerji arz<\/em><em>\u0131<\/em><em>n<\/em><em>\u0131<\/em><em>n yan<\/em><em>\u0131<\/em><em> s<\/em><em>\u0131<\/em><em>ra Antananarivo halk<\/em><em>\u0131<\/em><em>n<\/em><em>\u0131<\/em><em>n g<\/em><em>\u00fc<\/em><em>nl<\/em><em>\u00fc<\/em><em>k ya<\/em><em>\u015f<\/em><em>am kalitesine katk<\/em><em>\u0131<\/em><em>da bulundu<\/em><em>\u011f<\/em><em>umuz i<\/em><em>\u00e7<\/em><em>in gurur duyuyoruz. Umar<\/em><em>\u0131<\/em><em>z, Aksa Enerji olarak att<\/em><em>\u0131\u011f\u0131<\/em><em>m<\/em><em>\u0131<\/em><em>z bu ad<\/em><em>\u0131<\/em><em>m takip edilir ve di<\/em><em>\u011f<\/em><em>er T<\/em><em>\u00fc<\/em><em>rk <\/em><em>\u015f<\/em><em>irketleri i<\/em><em>\u00e7<\/em><em>in de <\/em><em>\u00f6<\/em><em>nc<\/em><em>\u00fc<\/em><em> bir yat<\/em><em>\u0131<\/em><em>r<\/em><em>\u0131<\/em><em>m olur.<\/em>\u201d<\/p>\n<p><strong>Madagaskar\u2019<\/strong><strong>\u0131<\/strong><strong>n y<\/strong><strong>\u00fc<\/strong><strong>zde 34<\/strong><strong>\u2019\u00fc<\/strong><strong>n<\/strong><strong>\u00fc<\/strong><strong>n enerji ihtiyac<\/strong><strong>\u0131<\/strong><strong> kar<\/strong><strong>\u015f\u0131<\/strong><strong>lanacak<\/strong><\/p>\n<p>Aksa Enerji\u2019nin Madagaskar\u2019daki HFO Santrali, T\u00fcrk \u00f6zel sekt\u00f6r\u00fcn\u00fcn Madagaskar\u2019daki ilk enerji yat\u0131r\u0131m\u0131 olarak \u00f6n plana \u00e7\u0131k\u0131yor. 7 ay gibi k\u0131sa bir s\u00fcrede tamamlanarak Eyl\u00fcl ay\u0131nda \u00fcretime ge\u00e7en santral, 66 MW\u2019lik kapasiteye sahip. Madagaskar\u2019\u0131n y\u00fczde 34\u2019\u00fcn\u00fcn enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamas\u0131 beklenen santral, ba\u015fkent Antananarivo\u2019nun da en b\u00fcy\u00fck santrallerinden biri.<\/p>\n<p><strong>Aksa Enerji Afrika\u2019da G\u00fcc\u00fcn\u00fc Art<\/strong><strong>\u0131<\/strong><strong>r<\/strong><strong>\u0131<\/strong><strong>yor<\/strong><\/p>\n<p>Afrika yat\u0131r\u0131mlar\u0131n\u0131n ilk ad\u0131m\u0131n\u0131 Gana Cumhuriyeti\u2019nde atan Aksa Enerji, Madagaskar ve Mali\u2019deki santrallerinin de devreye girmesiyle Afrika\u2019daki kurulu g\u00fcc\u00fcn\u00fc art\u0131rd\u0131. \u015eirketin Gana Santrali 280 MW kurulu g\u00fc\u00e7le, Mali Santrali tam kapasite olarak 40 MW g\u00fc\u00e7le ve son olarak Madagaskar Santrali de 66 MW kurulu g\u00fc\u00e7le ticari faaliyetine ba\u015flad\u0131. B\u00f6ylece \u015firketin Afrika\u2019daki toplam kurulu g\u00fcc\u00fc 386 MW\u2019a \u00e7\u0131kt\u0131.<\/p>\n<p>Aksa Enerji, T\u00fcrkiye ve Kuzey K\u0131br\u0131s T\u00fcrk Cumhuriyeti\u2019ndeki santralleriyle de r\u00fczg\u00e2r, do\u011fal gaz, hidroelektrik, fuel-oil ve linyitten olu\u015fan enerji \u00fcretim santralleriyle 2.000 MW\u2019\u0131n \u00fczerinde kurulu g\u00fcce sahip.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin halka a\u00e7\u0131k en b\u00fcy\u00fck serbest elektrik \u00fcreticisi Aksa Enerji, Eyl\u00fcl ay\u0131nda ticari faaliyetine ba\u015flayan Madagaskar Enerji Santrali\u2019nin resmi a\u00e7\u0131l\u0131\u015f\u0131n\u0131 ger\u00e7ekle\u015ftirdi. Madagaskar Cumhurba\u015fkan\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":69019,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[1571,28278,67,1009,35958,33754,33665],"views":1574,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69018"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=69018"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69018\/revisions"}],"predecessor-version":[{"id":69020,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/69018\/revisions\/69020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/69019"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=69018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=69018"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=69018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}