{"id":68980,"date":"2017-11-07T13:59:53","date_gmt":"2017-11-07T10:59:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68980"},"modified":"2017-11-07T13:59:53","modified_gmt":"2017-11-07T10:59:53","slug":"2800-mw-gucundeki-ithal-komur-santrali-yerli-komure-donecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2800-mw-gucundeki-ithal-komur-santrali-yerli-komure-donecek\/","title":{"rendered":"(Turkish) 2800 MW G\u00fcc\u00fcndeki \u0130thal K\u00f6m\u00fcr Santrali Yerli K\u00f6m\u00fcre D\u00f6necek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68980\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hattat Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Mehmet Hattat ve Eren Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ahmet Eren, \u201cZetes-Hattat Yerli K\u00f6m\u00fcre D\u00f6n\u00fc\u015f\u00fcm Protokol\u00fc\u201dn\u00fc imzalad\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-68981\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/2800-mw-gucundeki-ithal-komur-santrali-yerli-komure-donecek-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/2800-mw-gucundeki-ithal-komur-santrali-yerli-komure-donecek-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/2800-mw-gucundeki-ithal-komur-santrali-yerli-komure-donecek-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/2800-mw-gucundeki-ithal-komur-santrali-yerli-komure-donecek-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/2800-mw-gucundeki-ithal-komur-santrali-yerli-komure-donecek.jpg 649w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Burada konu\u015fma yapan Albayrak, yap\u0131lan protokolle sa\u011flanan i\u015fbirli\u011finin T\u00fcrkiye\u2019nin yerli kaynaklarda \u00f6nceli\u011fin stratejisine y\u00f6nelik \u00f6nemli bir ad\u0131m oldu\u011funu belirtti.<\/p>\n<p>Albayrak ayr\u0131ca \u201cBug\u00fcn yakla\u015f\u0131k 18 milyar ton T\u00fcrkiye\u2019nin k\u00f6m\u00fcr rezervi varken y\u0131lda 40 milyon tona yak\u0131n k\u00f6m\u00fcr ithal ediyorsa burada bir problem bulunmaktad\u0131r. \u2018Toplam elektrik portf\u00f6y\u00fcndeki ithal pay\u0131n\u0131 d\u00fc\u015f\u00fcrmek, ithali yerli k\u00f6m\u00fcrle ikame etmeye \u00e7al\u0131\u015fmak.\u2019 demi\u015ftik. Bug\u00fcn T\u00fcrkiye\u2019nin en b\u00fcy\u00fck k\u00f6m\u00fcr santrali, 2 bin 800 megavatl\u0131k en b\u00fcy\u00fck ithal k\u00f6m\u00fcr santrali olan Eren Grubu\u2019nun y\u0131lda 7 milyon tona yak\u0131n k\u00f6m\u00fcr ithal ederek yakla\u015f\u0131k 21 milyar kilovatsaate yak\u0131n elektrik \u00fcreten bir santralin Hattat Grubuyla bir arada yerli k\u00f6m\u00fcr konusundaki amaca hizmet edecek olmas\u0131 ve ortaya koymas\u0131 \u00e7ok \u00f6nemlidir.&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hattat Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Mehmet Hattat ve Eren Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ahmet Eren, \u201cZetes-Hattat Yerli K\u00f6m\u00fcre D\u00f6n\u00fc\u015f\u00fcm Protokol\u00fc\u201dn\u00fc imzalad\u0131. Burada konu\u015fma [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68981,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,24649],"tags":[27051,19,67,1009,1389,1374,1675,24143,5097,2262,1375,35941,35942],"views":1582,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68980"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68980"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68980\/revisions"}],"predecessor-version":[{"id":68982,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68980\/revisions\/68982"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68981"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}