{"id":68897,"date":"2017-11-04T14:41:58","date_gmt":"2017-11-04T11:41:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68897"},"modified":"2017-11-04T14:41:58","modified_gmt":"2017-11-04T11:41:58","slug":"malatyadaki-entegre-cevre-tesisi-artik-elektrik-uretiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/malatyadaki-entegre-cevre-tesisi-artik-elektrik-uretiyor\/","title":{"rendered":"(Turkish) Malatya&#8217;daki Entegre \u00c7evre Tesisi Art\u0131k Elektrik \u00dcretiyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68897\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Malatya B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Ahmet \u00c7ak\u0131r ve belediyenin genel sekreter yard\u0131mc\u0131s\u0131 Ali Y\u0131ld\u0131r\u0131m ile birlikte tesiste yap\u0131lan inceleme sonras\u0131 yap\u0131lan a\u00e7\u0131klamada, g\u00fcnde 600 tona yak\u0131n \u00e7\u00f6p\u00fcn depolanaca\u011f\u0131 tesis ile saatte 10 megawatt elektrik enerjisi \u00fcretimine kademe kademe ge\u00e7ilece\u011fi belirtildi.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-68898\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/malatyadaki-entegre-cevre-tesisi-artik-elektrik-uretiyor-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/malatyadaki-entegre-cevre-tesisi-artik-elektrik-uretiyor-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/malatyadaki-entegre-cevre-tesisi-artik-elektrik-uretiyor-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/malatyadaki-entegre-cevre-tesisi-artik-elektrik-uretiyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/malatyadaki-entegre-cevre-tesisi-artik-elektrik-uretiyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Malatya Entegre \u00c7evre Projesi\u2019nin T\u00fcrkiye\u2019de \u00f6rnek bir \u00e7al\u0131\u015fma oldu\u011funu ve kentte 50 bin hanenin ayd\u0131nlatmas\u0131n\u0131 sa\u011flayabilece\u011fini dile getiren \u00c7ak\u0131r, &#8220;\u00c7\u00f6plerimiz \u00f6ncelikle il\u00e7e merkezlerde olu\u015fturulacak 4 merkezde toplanacak. Merkez ve il\u00e7elerle birlikte g\u00fcnl\u00fck 550-600 ton kat\u0131 at\u0131k toplanarak \u00f6ncelikle \u00f6n ayr\u0131\u015ft\u0131rmas\u0131 ger\u00e7ekle\u015ftirilecek. Daha sonra 3 farkl\u0131 alanda enerji sa\u011flanacak. Biyogaz reakt\u00f6rden saatte 3 mw elektrik enerjisi sa\u011flanacak.&#8221; dedi.<\/p>\n<p>Ayr\u0131ca \u00c7ak\u0131r, kat\u0131 at\u0131klar\u0131n sebep oldu\u011fu \u00e7evre kirlili\u011finin ortadan kald\u0131r\u0131lmas\u0131 ve zarars\u0131z hale getirilmesinin belediyelerin en b\u00fcy\u00fck sorumluluklar\u0131ndan bir tanesi oldu\u011funu dile getirerek, bunlar\u0131n verimli bir \u015fekilde bertaraf edilerek geri d\u00f6n\u00fc\u015f\u00fcm\u00fcn\u00fcn sa\u011flanmas\u0131nda b\u00fcy\u00fck \u00f6nem ta\u015f\u0131d\u0131\u011f\u0131n\u0131 belirtti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Malatya B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Ahmet \u00c7ak\u0131r ve belediyenin genel sekreter yard\u0131mc\u0131s\u0131 Ali Y\u0131ld\u0131r\u0131m ile birlikte tesiste yap\u0131lan inceleme sonras\u0131 yap\u0131lan a\u00e7\u0131klamada, g\u00fcnde 600 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68898,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[640,641,2880,19,67,1009,35927,3489,33139],"views":2039,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68897"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68897"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68897\/revisions"}],"predecessor-version":[{"id":68899,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68897\/revisions\/68899"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68898"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68897"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68897"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}