{"id":68759,"date":"2017-10-30T08:50:45","date_gmt":"2017-10-30T05:50:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68759"},"modified":"2017-10-30T08:50:45","modified_gmt":"2017-10-30T05:50:45","slug":"balikesirde-55-mwlik-res-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/balikesirde-55-mwlik-res-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Bal\u0131kesir&#8217;de 55 MW&#8217;l\u0131k RES Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68759\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Barkan Enerji taraf\u0131ndan Bal\u0131kesir&#8217;in Havran il\u00e7esinde toplam 55 MW kapasiteli 19 adet r\u00fczgar t\u00fcrbini kurulup elektrik \u00fcretimi yap\u0131lacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-68760\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/balikesirde-55-mwlik-res-kurulumu-yapilacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/balikesirde-55-mwlik-res-kurulumu-yapilacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/balikesirde-55-mwlik-res-kurulumu-yapilacak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/balikesirde-55-mwlik-res-kurulumu-yapilacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/balikesirde-55-mwlik-res-kurulumu-yapilacak.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Barkan Enerji Yat\u0131r\u0131m \u00dcretim ve Tic. A.\u015e. taraf\u0131ndan Bal\u0131kesir \u0130li, Havran \u0130l\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde orman arazisi ve Hazine Arazisi vasf\u0131ndaki arazide r\u00fczgardan elektrik enerjisi \u00fcretmek amac\u0131yla toplam 55 MW kapasiteli 19 adet r\u00fczgar t\u00fcrbini kurulup i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>142.5 milyon lira de\u011ferindeki \u201c\u015eapda\u011f\u0131 RES 57 MWm\/55 MWe [(18 x 3 MWm\/3 MWe)+(1 x 3 MWm\/1 MWe)]\u201d projesi kapsam\u0131nda 18 tanesi 3MWm\/3MWe g\u00fcc\u00fcnde 1 tanesi 3MWm\/1MWe g\u00fcc\u00fcnde olmak \u00fczere 19 adet r\u00fczgar t\u00fcrbin kurulumu ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>Santralde y\u0131lda 192.500.000 kWh enerji elde edilmesi ve \u00fcretilen elektri\u011fin tek hat \u015femas\u0131na uygun olarak Ak\u00e7ay TM (Alt\u0131noluk)-Bal\u0131kesir 1 TM E\u0130H\u2019ye girdi \u00e7\u0131kt\u0131 olarak iletilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Barkan Enerji taraf\u0131ndan Bal\u0131kesir&#8217;in Havran il\u00e7esinde toplam 55 MW kapasiteli 19 adet r\u00fczgar t\u00fcrbini kurulup elektrik \u00fcretimi yap\u0131lacak. Barkan Enerji Yat\u0131r\u0131m \u00dcretim ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68760,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[3613,67,1009,474,22653,24949,23318],"views":1928,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68759"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68759"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68759\/revisions"}],"predecessor-version":[{"id":68761,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68759\/revisions\/68761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68760"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}