{"id":68668,"date":"2017-10-25T09:48:55","date_gmt":"2017-10-25T06:48:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68668"},"modified":"2017-10-25T09:48:55","modified_gmt":"2017-10-25T06:48:55","slug":"israil-guney-kibris-ve-yunanistan-enerji-nakil-hatti-2018de-aciliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/israil-guney-kibris-ve-yunanistan-enerji-nakil-hatti-2018de-aciliyor\/","title":{"rendered":"(Turkish) \u0130srail, G\u00fcney K\u0131br\u0131s ve Yunanistan Enerji Nakil Hatt\u0131 2018\u2019de A\u00e7\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68668\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><span id=\"more-94966\"><\/span><strong>\u0130srail taraf\u0131ndan G\u00fcney K\u0131br\u0131s Rum Kesimi ve Yunanistan\u2019\u0131 birbirine ba\u011flayacak olan <img loading=\"lazy\" class=\"alignleft size-medium wp-image-25709\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/kose-yazisi-elektrik-enerjisi-nereden-geliyor-300x195.jpg\" alt=\"\" width=\"300\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/kose-yazisi-elektrik-enerjisi-nereden-geliyor-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/kose-yazisi-elektrik-enerjisi-nereden-geliyor-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/kose-yazisi-elektrik-enerjisi-nereden-geliyor.jpg 404w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>enerji nakit hatt\u0131 projesinin, Yunan ve G\u00fcney K\u0131br\u0131sl\u0131 d\u00fczenleyicilerin onay\u0131n\u0131n ard\u0131ndan\u00a0\u00a0<\/strong><strong>2018&#8217;in ilk \u00e7eyre\u011finde ba\u015flayaca\u011f\u0131 a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p>1520 km uzunlu\u011funda ve 2000 mw hacme sahip olacak hat, denizin alt\u0131na d\u00f6\u015fenecek olan kablolar vas\u0131tas\u0131 ile \u00e7ift y\u00f6nl\u00fc elektrik aktar\u0131m\u0131nda kullan\u0131lacak.<\/p>\n<p>Kablolar\u0131n d\u00f6\u015fenmesinin, 2022&#8217;ye kadar bitmesi ve projenin ilk safhas\u0131n\u0131n 3.5 milyar euro\u2019ya mal olmas\u0131 \u00f6ng\u00f6r\u00fclmektedir. \u00dc\u00e7 \u00fclkenin geli\u015fen ili\u015fkileri dahilinde kararla\u015ft\u0131r\u0131lan proje ayn\u0131 zamanda Do\u011fu Akdeniz\u2019de yeni ke\u015ffedilen do\u011fal gaz yataklar\u0131 sayesinde daha da \u00f6nemli hale geldi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130srail taraf\u0131ndan G\u00fcney K\u0131br\u0131s Rum Kesimi ve Yunanistan\u2019\u0131 birbirine ba\u011flayacak olan enerji nakit hatt\u0131 projesinin, Yunan ve G\u00fcney K\u0131br\u0131sl\u0131 d\u00fczenleyicilerin onay\u0131n\u0131n ard\u0131ndan\u00a0\u00a02018&#8217;in ilk [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25709,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[3751,68,34979,19638,34980,26353,19,232,21426],"views":1316,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68668"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68668"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68668\/revisions"}],"predecessor-version":[{"id":68669,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68668\/revisions\/68669"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/25709"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}