{"id":68647,"date":"2017-10-24T11:23:34","date_gmt":"2017-10-24T08:23:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68647"},"modified":"2017-10-24T11:24:10","modified_gmt":"2017-10-24T08:24:10","slug":"akkuyu-ngsye-sinirli-calisma-izni","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsye-sinirli-calisma-izni\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;ye S\u0131n\u0131rl\u0131 \u00c7al\u0131\u015fma \u0130zni"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68647\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye i\u00e7in \u00f6nemli enerji at\u0131l\u0131mlar\u0131ndan olan Akkuyu\u2019da t\u00fcm izinlerler tamamland\u0131. Atom Enerjisi Kurumu, Akkuyu i\u00e7in beklenen izinleri verdi. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali i\u00e7in s\u0131n\u0131rl\u0131 \u00e7al\u0131\u015fma izni verildi\u011fi a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-38178\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-ngs-turkiyenin-en-guvenilir-yapisi-olacak-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-ngs-turkiyenin-en-guvenilir-yapisi-olacak-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-ngs-turkiyenin-en-guvenilir-yapisi-olacak-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-ngs-turkiyenin-en-guvenilir-yapisi-olacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/yildiz-akkuyu-ngs-turkiyenin-en-guvenilir-yapisi-olacak.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span id=\"more-94942\"><\/span>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali i\u00e7in s\u0131n\u0131rl\u0131 \u00e7al\u0131\u015fma izni verilirken, projenin in\u015faat lisans\u0131n\u0131n 2018 y\u0131l\u0131n\u0131n ilk yar\u0131s\u0131nda al\u0131naca\u011f\u0131 belirtilmektedir. T\u00fcrkiye\u2019nin enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltacak olan ilk n\u00fckleer santrali olacak Akkuyu N\u00fckleer Santrali projesinde yeni ad\u0131mlar at\u0131l\u0131yor. Projede gerekli izinler s\u0131n\u0131rl\u0131 olarak Atom Enerjisi Kurumu taraf\u0131ndan verilmi\u015ftir.<\/p>\n<p>20 Milyar dolar\u0131 a\u015facak olan yat\u0131r\u0131m bedeliyle dev tesisin yap\u0131m\u0131na ili\u015fkin ayr\u0131nt\u0131lar teker teker in\u015fa a\u015famas\u0131na gelinmeye ba\u015flanan proje s\u00fcreci devam ediyor. Rutin programlar \u00e7er\u00e7evesinde s\u00fcren projelendirme safhas\u0131nda yeni bir karar g\u00fcndemde. Karar T\u00fcrkiye Atom Enerjisi Kurumu\u2019ndan (TAEK) al\u0131nd\u0131. Karar ile, Akkuyu N\u00fckleer Santrali i\u00e7in s\u0131n\u0131rl\u0131 \u00e7al\u0131\u015fma izni sa\u011flanm\u0131\u015f oldu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye i\u00e7in \u00f6nemli enerji at\u0131l\u0131mlar\u0131ndan olan Akkuyu\u2019da t\u00fcm izinlerler tamamland\u0131. Atom Enerjisi Kurumu, Akkuyu i\u00e7in beklenen izinleri verdi. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38178,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,27598,67,1009,21,25480,23614,88,2973,2644],"views":1060,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68647"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68647"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68647\/revisions"}],"predecessor-version":[{"id":68649,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68647\/revisions\/68649"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38178"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}